This document is a Questions and Answers file for the Tonto National Forest – South Zone Toilet Pumping Services solicitation (127EAU26Q0008). The Q&A provides critical clarifications about septic pumping services, including pricing methodology, service frequency, and operational details. Key clarifications include defining a "pump" as 1,000 gallons (priced at $800 per 1,000 gallons), confirming services will be individual call-outs strategically grouped, and specifying that no additional compensation will be provided for challenging site conditions or excessive debris. The document confirms the contract is a firm-fixed-price service with services performed as-needed when vault toilets reach 75-85% capacity, with the previous incumbent being 4RB Coopers under contract 127EAU21A0003.

The Q&A addresses multiple contractor inquiries about site accessibility, pumping logistics, and service expectations. The contract covers septic pumping for vault toilets, holding tanks, and lift stations across Tonto National Forest's South Zone, with tank capacities ranging from 300 to 4,000 gallons. Multiple pump trucks are permitted for large-capacity tanks, and contractors are responsible for coordinating site access and planning accordingly. The contract includes a base year in 2026 with four additional option years through 2030, with services to be performed Monday through Thursday, excluding federal holidays. Evaluation will be based on price, technical acceptability, and past performance, with active SAM.gov registration required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

127EAU26Q0008 Questions and Answers

1. Could the Government clarify whether pump-outs are typically performed on a per-toilet basis or per-location basis? For example, during a single mobilization to a site with multiple vaults, how many toilets are generally pumped?

Answer: It entirely depends but each toilet vault is 1,000 gallons with services typically being requested at around 75-85% capacity. Some buildings are single vault and some are double vault. Some tanks are above 1,000 gallons such as campground host sites. The chart in the SOW indicates each location and how many tanks are there.

1. Can the Government provide historical frequency data or estimated service frequency for each site (per month or per year) Answer: Frequency status is also provided in SOW, as sites are serviced on an as needed basis, some less visited locations may need a pump every 2+ years while more busy ones need it every 6 months.

1. Is one ‘pump’ defined as pumping the entire tank to empty regardless of size, or is it defined as 1,000 gallons? If a 4,000-gallon tank is pumped, is that considered one pump or four?

Answer: Historically we, typically define a pump as a 1,000 gallons. So if the rate is $800 per 1,000 gal pump and 3,600 gallons are pulled in a service trip, it would be that rate times 3.6 (i.e. $800 x 3.6 = $2,880).

1. Are all sites accessible year-round by standard pump trucks, and can the Government confirm which roads require 4x4, high-clearance, or are subject to seasonal closure?

Answer: This information will be confirmed per location, though none of the sites are subject to any seasonal closures.

1. Will the Government schedule pump-outs in weekly batches, or will they be individual call-outs? Is there a minimum number of sites per mobilization?

Answer: It will be individual call outs but strategically grouped when submitting a request. We try to plan out by 3-4 weeks and service vault toilets when they are 75-85% full.

1. If excessive debris (solid waste, trash, foreign objects) causes additional time or multiple trips, is there a mechanism for additional payment?

Answer: No, there is no mechanism for additional payment. This is a FFP Services contract, and all costs associated with performing work, including labor and time, shall be included in the contractors proposed price. Offerors are responsible for conducting appropriate due diligence prior to submitting bids and price accordingly.

1. If a site is inaccessible due to weather or locked gates, will the Government authorize a return trip and compensate for duplicate mobilization?

Answer: The contractor is responsible for ensuring proper coordination with the Forest Service to verify site access and any conditions that may affect performance. Site inaccessibility due to weather conditions or locked gates does not alter the firm fixed price nature of this contract, and the contractor must plan and perform work accordingly.

1. Is the contractor allowed to mobilize multiple pump trucks when pumping high-capacity tanks (2,000–4,000 gallons) to complete the service in one trip?

Answer: Yes, it is acceptable if multiple equipment is required to pump higher capacity tanks or quantities in one trip.

1. For clarification on the “price per pump” column in the Excel sheet, does this represent the price per 1,000 gallons? And would a double vault be treated as two pumps?

Answer: Correct, the price per 1,000 gallons to “provide any and all labor, equipment, supplies, services, permits, and licenses necessary to collect, load, haul and dump septic refuse from recreation sites”. So if that price were to say $800 per 1,000 gal pump, and you service a double vault and pull 1,750 gallons. That would be $800 x 1.75 (aka 1,750 gallons) = $1,400

1. Additionally, can you confirm whether there is an incumbent contractor or any previous contract associated with this requirement?

Answer: 4RB Coopers 127EAU21A0003