Sol_127EAS24Q0104_Amd_0001.pdf

PDF 134 KB Posted

Attached to
Incline Mechanical Cut & Pile Site Prep Federal contract opportunity
Solicitation number
127EAS24Q0104
Issued by
Department of Agriculture Forest Service

About this file

This document is an amendment to Solicitation 127EAS24Q0104 for Incline Mechanical Cut & Pile Site Prep. The amendment incorporates Q&A, additional information, and specifications, including Attachment 7 SMZ Treatment Specifications. The work involves mechanical cutting and piling of trees, brush, and slash on the Sierra National Forest, with hand cutting of larger conifers. Key details include: the period of performance is 9/30/2024 to 9/30/2025, the Government may begin burning piles after acceptance, and equipment may enter SMZs on slopes less than 15% as specified. The amendment must be signed and returned with the quote to acknowledge acceptance of the additional information and specifications. Failure to do so may result in disqualification.

View the file

Other files for this federal contract opportunity

Other files attached to Incline Mechanical Cut & Pile Site Prep, newest first.
File Type Posted
Attachment_7_SMZ_Treatment_Specifications_0001.pdf PDF
Attachment_6_Wage_Determination_1977-0727_rev_73.pdf PDF
Sol_127EAS24Q0104.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment_3_Fire_Plan.pdf PDF
Attachment_5_Vicinity_Map.pdf PDF
Attachment_4_Contract_Map.pdf PDF
Attachment_2_Pile_Example.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

127EAS24Q0104

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

7EAS

ALBUQUERQUE NM 87102-3498

333 BROADWAY BLVD SE

USDA-FS CSA SOUTHWEST 2

68748108/23/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/13/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 1 is to incorporate the following attached Q&A, additional information, and specifications, to include Attachment 7 SMZ Treatment Specifications.

This amendment must be signed and returned with your quote to acknowledge your acceptance of the additional information and specifications. Failure to sign and return may result in disqualification from award.

Period of Performance: 09/30/2024 to 09/30/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

SARAH J. HILL

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation 127EAS24Q0104, Amendment 1

Q&A for Incline Mechanical Cut & Pile Site Prep

Q1: There’s a lot of work including some very tall dead trees and getting it all done in the time given would be tight. Can we expect a longer contract time than the dates in the solicitation?

A1: Vendors should base their work plans (schedule, personnel, equipment, etc.) on the dates given. Contract extensions are subjective and never guaranteed.

Q2: Can the LOP for fisher be waived so work doesn’t have to wait until summer?

A2: The fisher LOP for Unit 2 has been lifted since habitat there was destroyed by fire. Work in Unit 2 may begin when soil conditions permit in the spring. (The LOP remains in place for Unit 1 which must be complete by Nov 22, 2024.)

Q3: Is there a site visit, site walk, bid walk?

A3: The government-led site visit was held on August 20, as announced in the solicitation. Vendors are still welcome to walk the units independently to get an accurate idea of the terrain, access, and level of effort required to complete the work.

Q4: When pulling material out of the drainages or meadows does it need to be fully suspended or can you skid one end?

A4: There is an area in one of the meadow SMZs that is also an old mill site. Materials will need to fully suspend there if anything is removed.

In other areas, materials do not need to be fully suspended pulling out of the SMZ; however, if it results in making a trench the contractor must rehab soil gouging/trenching (construct slight water barring, etc.) per the SMZ Treatment Specifications included with this amendment (see Attachment 7). One end should be raised off the ground a bit rather than straight skidding to avoid trenching.

Q5: Could we use a dozer to begin making the cone shaped piles and finish making them with an excavator?

A5: The pile base may be created utilizing a dozer equipped with brush rake. A track feller buncher or excavator shall construct a cone shaped pile over the pile base as described in the specifications given in the Statement of Work. The contractor shall clear and pile slash as specified in the Statement of Work.

Q6: Can we take sound logs/merch logs, or could we deck them to buy/bid on later?

A6: This contract does not include any product removal and the Government does not have current plans for a deck sale. Vendors should not anticipate this as a part of quoting for this cut and pile contract. All materials must be piled according to the specifications in the Statement of Work.

Q7: Could we masticate the brush and smaller trees and subsoil the material?

A7: Brush may be masticated instead of piled. Masticated brush shall be cut down to ground level and where possible mulched into the ground. Slash shall be piled and not masticated.

Q8: There are some dead trees between a meadow and the road. Do those have to be treated?

A8: All prescribed material that can be reached from the road must be treated.

Q9: Is there a pile size limit?

A9: Pile size is not restricted.

Q10: How are shorter snags/broken off boles to be handled?

A10: Standing broken tree boles less than 10 feet in height may be left standing and not felled.

Q11: The solicitation doesn’t explain treatment expectations within the meadow SMZ buffer. Do the buffer areas have to be treated, and if so, how?

A11: Equipment may enter an SMZ on slopes less than 15% as specified to treat fuels. On slopes greater than 15%, fuels reachable with an excavator boom shall be removed for piling outside of the SMZ.

More complete information is contained in the SMZ Treatment Specifications included with this amendment (see Attachment 7).

New Information:

The Government may elect to begin burning of built piles after they have been inspected and accepted for payment. This may occur while the contractor is still working in other areas of the unit. Advance notice will be given by the COR. The contractor will not be involved in the burning activities.