This is a Questions and Answers document for solicitation 12639526Q0301, a federal laser cleaner acquisition. The document does not address specific pricing terms, award dates, or contract vehicles, as it consists solely of clarifications to solicitation requirements.
The acquisition is for a 1000-watt pulse laser cleaning system to be delivered complete within 30 days of order receipt, with onsite operator training for up to four USDA personnel required at the time of delivery at the Fort Myers location in a single training session. Key technical specifications established include: 1000-watt minimum pulse energy, pulse width up to 35 kilohertz, eight different scan patterns, liquid cooling method, 100 percent duty cycle capability over an eight-hour day, and two-year warranty duration. The generator must have a minimum 11.5 kilowatt capacity but may exceed this if required to support full system operation at 32 amperes. The solicitation is a total small-business set-aside with no nonmanufacturer rule applicability. Foreign-manufactured components are eligible for consideration subject to Buy American provisions under FAR 52.225-1, with quoters responsible for determining country-of-origin analysis methodology. The quote deadline is September 23, 2026, at 3:00 PM Eastern Standard Time, and this is a new contract with no incumbent contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12639526Q0301 Laser Cleaner Solicitation Questions
1. Quote deadline
The SAM.gov posting shows offers due September 22, 2026, at 2:00 PM Central. Block 8 of the attached SF 1449 shows September 23, 2026, at 3:00 PM Eastern. Please confirm the controlling quotation deadline.
Response: The quote deadline is Sep 23, 2026 at 3 pm Eastern Standard Time. The SAM posting has been updated as of this amendment.
2. Delivery and onsite training
The solicitation requires complete delivery within 30 days after receipt of order. Does the onsite operator training also have to be completed within that 30-day period, or may training be scheduled shortly after the complete system is delivered and commissioned?
Response: The training shall occur at the time of delivery.
3. Country of origin and Buy American provisions
Please confirm whether a properly disclosed foreign-manufactured laser system is eligible for consideration under this solicitation, subject to the applicable Buy American evaluation, and whether the country-of-origin analysis should be made separately for the laser, trailer, generator and other components or for the integrated mobile system as the end product.
Response: Please refer to clause 52.225-1 Buy American – Supplies for guidance on the applicable requirements. Quoters are responsible for reviewing and interpreting all solicitation requirements.
4. The solicitation is a total small-business set-aside. FAR 52.219-33 is shown but is not checked as applicable. Please confirm whether the nonmanufacturer rule applies to this acquisition or whether a class or individual waiver applies or is anticipated.
Response: Clause 52.219-33 Nonmanufacturer Rule does not apply.
5. Technical specifications
Other than the items identified in the statement of work, are there required minimum specifications for pulse energy, pulse-width range, cleaning-head scan patterns, cooling method, electrical input, duty cycle, warranty duration, or laser-source manufacturer?
Response
a. Are there required minimum specifications for pulse energy? 1000 watt
b. What is the pulse-width range? Pulse width up to 35K
c. cleaning-head scan patterns? 8 different scan patterns
d. Cooling method? liquid cooled
e. Duty cycle – 100% out of an 8-hour day
f. Warranty duration – 2 yrs
g. Laser-Source Manufacturer - Please refer to clause 52.225-1 Buy American –
Supplies for guidance on the applicable requirements. Quoters are responsible for reviewing and interpreting all solicitation requirements.
6. Generator configuration
May the proposed generator exceed the stated 11.5 kW minimum if the larger unit is required to support the laser, cooling system and auxiliary equipment at full capacity?
Response: Yes
7. Training scope
Approximately how many USDA personnel should be included in the onsite operator training, and does USDA anticipate a single training session at the Fort Myers delivery location?
Response: Up to 4 personnel, yes, one training session
8. We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services.
Response: This is a new contract.
9. The 1000W Pulse Laser Cleaning machine requires 32A, not 30A.
Response: As long the entire system can support 32A requirements that is acceptable.