Regarding supervision and quality assurance, a single superintendent may fulfill supervision, safety, and quality assurance/quality control (QA/QC) roles provided the individual is not a working superintendent. Contractors are required to prepare contract-specific QA/QC and Safety Plans, though submission with the initial quote is not mandatory. The scope of work focuses on repair of the existing drain line rather than full replacement; replacement would only occur if necessary and would require negotiation of a modification. As-built drawings are not available, but contractors may obtain a video recording from a previous plumbing scope posted on SAM, and may need to conduct their own camera inspection to fully assess repair requirements and identify any separated pipe sections. If full replacement becomes necessary, the existing cast-iron floor drain must be replaced only if damaged and deemed unusable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639526Q0031-0002.pdf | ||
| Additional RFIs.docx | DOCX document | |
| video of the boiler blowdown drainpipe.MOV | MOV file | |
| Contractor Site Visit List.pdf | ||
| Atch 1_ SOW_blowdown drain pipe repair_amendment 0001.docx | DOCX document | |
| RFIs and Photos.docx | DOCX document | |
| 12639526Q0031-0001.pdf | ||
| Atch 1_ SOW_blowdown drain pipe repair.docx | DOCX document | |
| Atch 2_Federal Construction Wage Rates_Nueces County.txt | TXT text file | |
| Combined synopsis-solicitation_12639526Q0017.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 12639526Q0031, RFIs
1. In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles? Yes, but he/she can’t be a working superintendent.
1. Are contractors required to issue a contract specific QA/QC Plan? Yes, but it doesn’t need to be submitted with the quote.
1. Are contractors required to issue a contract specific Safety Plan? Same
1. Is the intention of the statement of work to replace the whole drain line? No, only if necessary, then we would negotiate a modification.
1. Is the intention of the statement of work to just repair the drain line? Yes.
1. Are the as-built drawings available? No
1. Can we obtain a copy of the video recorded when the local plumber scoped the line? Yes, it’s now posted on SAM. It may be necessary for you to run a camera to fully understand the repairs needed and the location of the separated pipe.
1. If full replacement is required, does the existing cast-iron floor drain also need to be replaced? Only if damaged and deemed unusable.