12639526Q0031-0001.pdf
PDF 375 KB Posted
- Attached to
- Boiler Blowdown Drainpipe Repair, Corpus Christi
- Solicitation number
- 12639526Q0031
About this file
This is Amendment 0001 to Solicitation 12639526Q0031, issued by the USDA Agricultural Marketing Service (AMS), Cotton and Tobacco Program on January 28, 2026. The amendment incorporates a revised Statement of Work for boiler blowdown drainpipe repair at the Corpus Christi Cotton Classing Office in Corpus Christi, Texas. The contracting office is USDA APHIS located at 250 Marquette Avenue, Suite 410, Minneapolis, MN 55401. The amendment is administered by APHIS-MN-126395.
The Statement of Work requires the contractor to repair or replace the boiler blowdown drainpipe joint located beneath the concrete floor of the facility's mechanical room. The failed joint has resulted in unreliable drainage during boiler blowdown operations. The scope includes pre-work activities (site visit, utility identification, safety implementation), demolition and access (concrete saw-cutting and removal to expose the failed drainpipe), drainpipe removal and replacement with new piping suitable for high-temperature boiler discharge, leak testing and functional flow verification, concrete floor restoration to original condition, and site cleanup and restoration. Deliverables include the completed and tested drainpipe installation, restored concrete floor, as-built documentation showing pipe routing and materials, and warranty information. The contractor must comply with OSHA safety standards, follow USDA facility access and security protocols, provide qualified personnel experienced in boiler system piping and concrete demolition/repair, and perform work during normal business hours while minimizing boiler system downtime. The project is considered complete when the drainpipe passes all functional and leak tests, the concrete is fully cured, the mechanical room is clean, and all documentation is approved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639526Q0031-0002.pdf | ||
| Additional RFIs.docx | DOCX document | |
| RFIs.docx | DOCX document | |
| video of the boiler blowdown drainpipe.MOV | MOV file | |
| Contractor Site Visit List.pdf | ||
| Atch 1_ SOW_blowdown drain pipe repair_amendment 0001.docx | DOCX document | |
| RFIs and Photos.docx | DOCX document | |
| Atch 1_ SOW_blowdown drain pipe repair.docx | DOCX document | |
| Atch 2_Federal Construction Wage Rates_Nueces County.txt | TXT text file | |
| Combined synopsis-solicitation_12639526Q0017.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12639526Q0031 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
APHIS-MN-126395
MINNEAPOLIS MN 55401
SUITE410
250 MARQUETTE AVE
USDA APHIS
01/28/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/23/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is written to incorporate a revised statement of work, starting on the next page. NOTE: a Word document is also posted that shows the changes.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JAMES G. ROLOFF
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
01/28/2026
12639526Q0031, Attachment 1 … Amendment 0001
Statement of Work U.S. Department of Agriculture
Agricultural Marketing Service, Cotton and Tobacco Program Boiler Blowdown Drainpipe Repair Corpus Christi Classing Office
Corpus Christi, Texas
I. Background:
The USDA Agricultural Marketing Service (AMS), Cotton and Tobacco Program (CTP), Grading Division, plays a critical role in supporting the efficient marketing of U.S. cotton by providing unbiased, science‑based fiber classification services. Using High Volume Instruments (HVI), the program electronically evaluates millions of cotton samples each year, supplying the domestic and international cotton industries with accurate, real‑time data essential for pricing, marketing, and quality assurance.
To ensure the integrity of these measurements, AMS operates specialized laboratories that must maintain tightly controlled environmental conditions, supported by extensive industrial‑grade mechanical, electrical, and data‑handling systems.
Each AMS classing office—including the Corpus Christi facility—relies on a complex infrastructure of air‑handling equipment, vacuum systems, conveyor systems, and rapid conditioning units to prepare, transport, and test cotton samples efficiently. These systems enable the precise control of temperature, humidity, and sample moisture content required for reliable HVI testing. The Corpus Christi Classing Office alone operates 18 HVI machines, 6 Cotton Grader Terminals, multiple computer workstations, and a dedicated data‑transmission environment that feeds classification results directly into AMS mainframe systems for immediate distribution to stakeholders nationwide.
As the global leader in HVI testing, the Cotton & Tobacco Program classifies virtually every bale of cotton grown in the United States—approximately 15 to 18 million samples annually. The scale and importance of this mission demand high levels of operational reliability, speed, and accuracy across all laboratory systems.
This Statement of Work outlines the background, requirements, and operational context necessary to support these mission‑critical functions and ensure the continued delivery of trusted, world‑class cotton classification services.
II. Purpose:
The USDA Corpus Christi Cotton Classing Office requires repair or replacement of the boiler blowdown drainpipe joint located beneath the concrete floor of the facility’s mechanical room. The existing joint has separated, resulting in unreliable drainage during boiler blowdown operations. The proposed work will reestablish safe, code‑compliant drainage and prevent further water intrusion or potential structural damage.
III. Scope of Work
The contractor shall provide all labor, materials, equipment, tools, supervision, and incidentals necessary to complete the repair of the sub‑floor boiler blowdown drainpipe joint. Work includes, but is not limited to, the following tasks:
Pre‑Work Activities
• Conduct a site visit to verify existing conditions.
• Coordinate work schedule with USDA facility management to minimize operational disruption.
• Identify and mark all utilities in the work area.
• Implement safety measures and establish a controlled work zone.
Demolition and Access
• Saw‑cut and remove the required section of concrete floor in the mechanical room to expose the failed drainpipe.
• Excavate sub‑grade material as needed to access the full length of the damaged pipe.
• Protect adjacent equipment, piping, and electrical systems from dust, debris, and vibration.
Drainpipe Removal
• Remove or repair the existing separated joint of the blowdown drainpipe.
• Properly dispose of all debris in accordance with local, state, and federal regulations.
Installation of New Drainpipe
• Install new piping for the separated joint, if necessary, that is suitable for high‑temperature boiler blowdown discharge and that is equal to the existing pipe.
• Ensure proper slope, alignment, and secure connections to existing upstream and downstream piping.
• Install new fittings, unions, supports, and anchors as required.
• Provide thermal protection or insulation if required by code or USDA specifications.
Testing and Verification
• Perform leak testing and functional flow testing of the new drain line.
• Verify proper drainage from the boiler blowdown system to the designated termination point.
• Correct any deficiencies prior to concrete restoration.
Concrete Floor Restoration
• Backfill and compact sub‑grade material to original condition.
• Install vapor barrier if one existed previously.
• Pour and finish new concrete slab section to match existing floor thickness, elevation, and surface finish.
• Allow proper curing time before equipment is returned to service.
Site Cleanup and Restoration
• Remove all construction debris, dust, and waste materials.
• Restore the mechanical room to clean, operational condition.
• Ensure all systems impacted by the work are fully functional.
Deliverables
• Completed and tested boiler blowdown drainpipe installation.
• Concrete floor restored to original condition.
• As‑built documentation showing pipe routing and materials used.
• Warranty information for materials and workmanship.
Contractor Requirements
• Must comply with all OSHA safety standards.
• Must follow USDA facility access and security protocols.
• Must provide qualified personnel experienced in boiler system piping and concrete demolition/repair.
• Must maintain a clean and safe work environment at all times.
Work Schedule
• Work shall be performed during normal business hours unless otherwise approved.
• Contractor shall provide a proposed schedule including demolition, installation, testing, and curing time.
• All work must be coordinated to minimize downtime of the boiler system.
Acceptance Criteria The USDA will consider the project complete when:
• The new or repaired drainpipe passes all functional and leak tests.
• Concrete floor is restored and fully cured.
• The mechanical room is clean and free of construction debris.
• All documentation has been submitted and approved.
Additional Notes
• Contractor is responsible for verifying all measurements and conditions prior to starting work.
• Any unforeseen conditions must be reported immediately to USDA for direction before proceeding.
• No substitutions of materials or methods may be made without prior USDA approval.
| Atch 1_ SOW_blowdown drain pipe repair_amendment 0001.pdf |
| I. Background: |
| II. Purpose: |
| III. Scope of Work |
| 2026-01-28T16:28:40-0600 | |
| JAMES ROLOFF |
File details come from the government source that posted it. Updated .