Qs_and_As Excel Sheet Growth Chambers R02.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Environmental Growth Chambers, HVAC, and Controls Replacement, Moore Air Base, TX Federal contract opportunity
Solicitation number
12639525R0019
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services

About this file

The file is a Questions and Answers (Q&A) Excel sheet for Solicitation 12639525R0019, a USDA-Animal and Plant Health Inspection Service construction project at Moore Air Base in Edinburg, Texas. The project involves replacing 11 environmental growth chambers (8 EGC units and 3 Rheem SEER units), including HVAC units, chilled water coils, control valves, and associated systems. Key technical requirements include maintaining precise temperature (4-50°C, typically 20-28°C) and humidity (40-90% RH, typically 50-70% RH) for research purposes, with a DDC system to be integrated with the base EMCS system.

The solicitation is set aside for small businesses in the NAICS code 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a size standard of $19 million. The estimated project magnitude is between $1-5 million. Additional project specifications include replacing lighting with full-spectrum LED systems, implementing independent third-party Test and Balance (TAB) and commissioning, and requiring all mechanical, electrical, and control documents to be stamped by a Texas Professional Engineer. The project will involve design-build delivery, with final designs to be prepared and sealed by a licensed PE before procurement and fabrication.

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Growth Chambers, HVAC, and Controls Replacement, Moore Air Base, TX, newest first.
File Type Posted
12639525R0019-0003.pdf PDF
12639525R0019-0002.pdf PDF
RFIs and responses.docx DOCX document
Building 6414 EGCs Attendance Site Visit.pdf PDF
IMG_0110.jpeg JPEG file
IMG_0112.jpeg JPEG file
IMG_0113.jpeg JPEG file
IMG_0111.jpeg JPEG file
IMG_0109.jpeg JPEG file
IMG_0117.jpeg JPEG file
IMG_0115.jpeg JPEG file
IMG_0107.jpeg JPEG file
12639525R0019-0001.pdf PDF
12639525R0019.pdf PDF
Atch 2_Federal Construction Wage Rates_Hidalgo County.pdf PDF
Atch 1_SOW_6414 EGC and Rheem Seer Replacement.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation 12639525R0019 6414 Growth Chamber HVAC Units and Controls Replacement
Contractor Question/RFI or RecommendationGovernment Response
How many growth chambers are required to be renovated8 EGC's and 3 RHEEM SEER Total 11
What are the room / Chamber box numbers included in this SOW. Per the attached General Drawing EGC Units 1-12 & per site walk. What room numbers above the doors at each chamber: IE Room 10-26?EGCs 13 thru 20 and Kysor/Rheem Seer 1-3
How many Chilled water coils / Evaporators are required to be replacedOne per chamber; replace all chamber cooling coils. Total = 8 Rheem Seer units have diferent systems 3
How many Chilled water 3 way control valves are required to be replaced W DDCOne per coil; replace all. Total = 8 Rheem Seer units have diferent systems 3
How many chilled water pumps are required to be replaced as part of this SOWNone
Are there any SOW requirements for any of the equipment to be DX (Refrigerant) Or is all equipment to be Chilled waterChilled Water as that is what exists
Does the USDA have As-Builts for the BuildingNot at this time but looking for drawnings
Does the USDA have As-Builts for the Growth chamber systemsNo As-builts just EGC's information
What is the design LAT required for the Evaporator coilsThat depends on what is being used.
What are the required growth chamber temperature setpointsCapability 4–50 °C; typical operation 20–28 °C (design to maintain setpoint within ±0.5–1.0 °C under steady conditions
What is the required growth chamber Humidity setpointsCapability 40–90 %RH; typical operation 50–70 %RH (design control ±2 %RH steady-state).
Is The DDC system required to be tied into the Base EMCS systemYes. Provide BACnet/IP integration points (status, alarms, key trends). If EMCS is not ready on Day 1, panels shall be EMCS-ready.
Is the DDC system required to be ready to tie into EMCS system in the future as part of a future solicitationYes. Provide all hardware/software points and network provisions for future EMCS connection.
Due to the extensive nature of this scope, we feel that this SOW needs to be designed by a Design firm then sent out for BidThe Government intends performance-based, design-build delivery. Final design shall be prepared and sealed by a licensed PE and submitted for approval prior to procurement/fabrication.
Are there any aspects of this project that require an Engineer's design or stampYes. Mechanical, electrical, controls (DDC), and life-safety documents, load selections, sequences, and calculations must be Texas PE-stamped. TAB report and commissioning plan to be signed by certified firms.
During the site walk, there was discussion of a outside air Air handler, how does this tie into the growth chamber system, controls, ductwork & refrigerated boxOA AHU provides tempered ventilation/pressurization to the chamber areas; it does not serve as process cooling for EGCs. DDC coordinates OA, space pressure, and exhaust; EGC coils handle process temperature/RH.
How many outside air Air Handlers are required to be replaced as part of this scope & Which one (s)None
Are there requirements for the Coils, Driers, OA AHU's to be increased in size or to add BTU's due to new testing requirementsNo upsizing required. Match or exceed existing capacities to meet stated temperature/RH tolerances. Provide coil selections at design duty with minimum 10–15% margin where vendor standards require.
During the site walk, there was discussion of driers on top of the growth chamber refrigerated box, how do these tie into the growth chamber system, controls, ductwork & refrigerated boxThis is for the Outside Air Exchange system for Humidity Control
How many driers are required to be replaced as part of this scope2 per unit 16
How Many Steam Generators are required to be replaced per scopeNone
Atch 1_SOW Para 4.1.1 calls for Kysor / Rheem SEER EGC (Qty 3) these brand units were not seen during the site visit. Where are these units located and are they part of the SOWThey are located in the oposite side of the building, they were missed during the site visit but information can be provided with Pictures if needed.
Atch 1_SOW Para 4.1.3 calls for demo of refrigerant pipe. What units/systems are tied to refrigeration? Per the site walk all equipment is chilled waterOnly for the Kysor Rheem Seer systems (1-3) as a package unit no more than 20 feet toal.
Atch 1_SOW Para 4.1.3 calls for New Evaporators & Air cooled condensers on the roof. Where do these DX units tie into the system as per the site walk all equipment is chilled water. No DX equipment was visual during the site walkThose are for the Kysor Rheem Seer Systems only
What are the lumens required for the new lighting packageSpecify by PPFD at canopy height: 100–1,000 µmol/m²/s, dimmable 0–100%, ±10% uniformity. For reference, this equates roughly to 5,000–50,000 lux adjustable. Full-spectrum LED with red/blue supplementation, photoperiod programmable.
Are there any electrical panel upgrades required as part of this SOW or are all existing to remainNone
Is the lighting to be tied to an automated control systemYes. Tie chamber lighting to DDC for photoperiod scheduling, alarm/trend integration, and local override at each chamber.
Is 3rd party Test and Balance required as part of the ScopeYes. Independent certified TAB of chilled-water flows and airflows is required; contractor self-certification is not acceptable.
Is 3rd party Commissioning required a part of the ScopeYes. Independent commissioning (CxA) to verify temperature, RH, lighting, safety interlocks, alarms, trending, and sequence of operations for each chamber.