Questions and answers 2.docx

DOCX document 26 KB Posted

Attached to
College of Charleston ALB Outbreak Site Improvements
Solicitation number
12639522R0048
Issued by

About this file

This document contains questions and answers regarding site visit logistics for solicitation number 12639522R0048 from the Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services. Portable toilets will be required on site as no restroom facilities are available. While no office space can be provided, the agency will assist in locating an area for an on-site job trailer. Additional security fencing will not be needed except at the road entrance, where temporary barricades must be maintained when work begins on the new gates. The roof canopy eave height is 16 feet.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site visit Q’s and A’s, ALB Charleston, Sol #12639522R0048

1. Please verify if GC and Subs will be able to use restrooms at the existing facility or if port-a-johns will be required. Porta-Johns are required.

1. Please verify if GC will be able to use a space or area at the existing facility for a temp. office. Space would only be needed to allow for a laptop in creating reports and enough room to house some documents and maintain As-Builts. If not, please verify if a jobsite trailer will be required and verify location of where the Trailer can be set. No space is available as it is not USDA space. USDA will assist in locating a site for office trailer.

1. Please verify if additional Security Fencing will be required at entrances or other areas around the site that are currently not shown on the drawings. Contractor is not responsible for the gates at the road until the work starts at the road for the new gates. At that time the contractor is required to maintain a temporary gate or barricades.

1. What is the structure eave height on the roof only canopy? 16’ feet to the top of the office eave edge.