Specifications.pdf

PDF 7 MB Posted

Attached to
Waste Water Treatment Plant Upgrade
Solicitation number
12639518R0004
Issued by

About this file

Project specs

View the file

Other files

File Type Posted
Pre-proposal_conference_attendance_sheet.pdf PDF
Answers_to_RFIs.docx DOCX document
E_SITE-2.JPG JPG image
Project drawings.pdf PDF
E_SITE-1.JPG JPG image
12639518R0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

©Stanley Consultants, Inc. 2017

Project Manual for

Wastewater Treatment Plant Design Modifications

USDA - APHIS - PPQ

Moore Air Base Edinburg, Texas

April 2017

Solicitation 12639518R0004, Waste Water Treatment Plant Upgrade Attachment 2

27100.03.00 TABLE OF CONTENTS

ms1797 SECTION 00 01 10 - Page 1

WASTEWATER TREATMENT PLANT DESIGN MODIFICATIONS

USDA - APHIS - PPQ

MOORE AIR BASE

EDINBURG, TEXAS

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

Resp.

Charge Document Title Page 00 01 15 Drawing List 1

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

Resp.

Charge Section Title Page

DIVISION 01 GENERAL REQUIREMENTS

01 11 00 Summary of Work 1 thru 01 20 00 Price and Payment Procedures 1 thru 2 Request for Information (RFI) Form 1 01 22 00 Unit Prices 1 thru 3 01 25 13 Product Substitutions Procedures 1 thru 2 Product Substitution Request Form 1 01 30 00 Administrative Requirements 1 thru 5 01 33 00 Submittal Procedures 1 thru 7 Submittal Transmittal Form 1 01 40 00 Quality Requirements 1 thru 5 01 45 33 Code Required Special Inspection and Procedures 1 thru 6 Statement of Special Inspections and Tests 1 thru 2 01 50 00 Temporary Facilities and Controls 1 thru 5 01 60 00 Product Requirements 1 thru 3 01 70 00 Execution and Closeout Requirements 1 thru 4 01 73 19 Installation Requirements 1 thru 2 01 78 23 Operating and Maintenance Data 1 thru 4

FACILITY CONSTRUCTION SUBGROUP

DIVISION 03 CONCRETE

03 00 10 Concrete Work 1 thru 12

DIVISION 05 METALS

05 50 00 Metal Fabrications 1 thru 5

DIVISION 09 FINISHES

09 96 00 High Performance Coatings 1 thru 5

DIVISION 13 SPECIAL CONSTRUCTION

13 34 19 Metal Building Systems 1 thru 5

FACILITY SERVICES SUBGROUP

DIVISION 26 ELECTRICAL

26 05 00 Common Work Results for Electrical 1 thru 22

TABLE OF CONTENTS 27100.03.00

Page 2 - SECTION 00 01 10 ms1797

Resp.

Charge Section Title Page

26 05 33 Above-Grade Raceway 1 thru 6 26 05 43 Below-Grade Raceway 1 thru 7 26 05 73 Overcurrent Protective Device Coordination Study 1 thru 4

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 31 EARTHWORK

31 23 00 Excavation and Fill 1 thru 8 31 23 16-16 Structural Excavation and Backfill 1 thru 6

DIVISION 32 EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Courses 1 thru 2 32 31 13 Chain Link Fences and Gates 1 thru 4 32 92 19 Seeding 1 thru 5

DIVISION 33 UTILITIES

33 30 00 Sanitary Sewerage Utilities 1 thru 8 33 71 49 Medium-Voltage Cable and Accessories 1 thru 7 33 73 29 Pad-Mounted Transformer 1 thru 6 33 79 00 Site Grounding 1 thru 4

PROCESS EQUIPMENT SUBGROUP

DIVISION 40 PROCESS INTEGRATION

40 91 00-13 Instrument Index Layout 1 thru 2 40 91 00-14 Instrument Index 1 thru 8 40 94 43-13 Input/Output Listing Layout 1 thru 2 40 94 43-14 Real World Input/Output List 1 thru 8

DIVISION 46 WATER AND WASTEWATER EQUIPMENT

46 07 16 Packaged Wastewater Treatment Plant 1 thru 14

SAMPLE FORMS Bound Herein

Shop Drawings and Submittals Log Construction Progress and Payment Schedule Contractor’s Request for Payment Change Order Request

27100.03.00 DRAWING LIST

ms1797 SECTION 00 01 15 - Page 1

Drawing No. Drawing Rev. No.

G1 Cover Sheet, Drawing Index and Project Location Plan C G2 General Legends, Notes, and Abbreviations C G3 General Mechanical Legend C G4 P&ID Legend - Sheet 1 C G5 P&ID Legend - Sheet 2 C G6 Process Flow Diagram and Hydraulic Profile C C1 Existing Site Conditions C C2 Civil Details - Sheet 1 C C3 Civil Details - Sheet 2 C C4 Site & Demo Plan C C5 Grading Plan C C6 Process Piping Tank Plan C C7 Process Details C C8 Process Details C S1 General Structural Notes and Legend C S2 Tank Foundation Plan C S3 Tank Plan C S4 Structural - Tank Sections C S5 Structural - Tank Sections C S6 Structural Details C S7 Structural Details C S8 Sunshade Details C S9 Floor and Roof Plans C S10 Elevations and Section C E1 Electrical Legend and Notes C E2 Electrical - One-Line Diagram C E3 Electrical Site Plan C E4 Electrical Power and Control Plan C E5 Lighting Plan C E6 Schedules and Details C E7 Electrical Details C E8 Electrical Details C E9 Electrical Notes C I1 Instrumentation and Controls - PAC Layout C I2 Piping and Instrumentation Diagram – Treatment Plant C I3 Instrumentation and Controls - PAC Layout C I4 Instrumentation and Controls - Control Building Network Diagram C

27100.03.00 SUMMARY OF WORK

ms1797 SECTION 01 11 00 - Page 1

PART 1 GENERAL

1.01 WORK COVERED BY CONTRACT DOCUMENTS

A. Work of this Agreement comprises decommissioning of existing package wastewater treatment plant (WWTP) and general construction of a new package WWTP in same location with approximately 287’ of on-site sanitary sewer and 134’ of potable water service located in Edinburg, Texas for the United States Department of Agriculture (USDA) APHIS PPQ.

1.02 AGREEMENT

A. Construct Work under single unit price Agreement.

1.03 WORK SEQUENCE

A. Construct and test new plant prior to demolition of existing plant. Existing plant must remain in service throughout the construction of the new plant. Schedule Work to minimize interruptions to utility service or facility operation. Contractor may propose alternative work sequence, subject to review by Engineer. Suggested sequence:

1. Construct and test new WWTP and effluent pipeline.

2. Construct and test new influent force main, bypass line, and valve structure.

3. Transfer mixed liquor (MLSS) from existing plant to new plant.

4. Make new force main connection with existing force main.

5. Demolish and remove tanks and appurtenances of existing plant. Concrete slab shall remain in place.

B. Contractor to provide all pumps, power cord, and temporary piping required to transfer MLSS.

C. Refer to Drawing E3 for phasing of electrical work.

1.04 CONTRACTOR USE OF PREMISES

A. Coordinate use of premises under direction of Owner’s Representative. Contractor shall confine construction equipment, storage of materials and equipment and operations of workers to areas permitted by law, ordinances, permits, or requirements of Contract Documents, and shall not unreasonably encumber premises with construction equipment or other material or equipment.

B. Assume full responsibility for protection and safekeeping of items under this Agreement, stored on Site.

C. Move any stored items, under Contractor's control, which interfere with operations of Owner or separate contractor.

D. Obtain and pay for use of additional storage or Work areas needed for operations.

1.05 OWNER OCCUPANCY

A. Owner will occupy premises during entire period of construction for conduct of its normal operations.

Cooperate with Owner's Representative in all construction operations to minimize conflict, and to facilitate Owner usage.

1. Maintain existing sanitary sewer system and treatment facility in substantially continuous operation during construction, making and removing temporary connections as necessary.

2. Perform Work hazardous to operation of existing sanitary sewer system and treatment facility, or which will require interruption of service at times specifically approved by Owner.

SUMMARY OF WORK 27100.03.00

Page 2 - SECTION 01 11 00 ms1797

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

END OF SECTION

27100.03.00 PRICE AND PAYMENT PROCEDURES

ms1797 SECTION 01 20 00 - Page 1

1.01 CONSTRUCTION SCHEDULE AND SCHEDULE OF VALUES

A. Submit a printed construction schedule on Contractor's standard form or electronic media (Gantt format or similar). Submit two copies of a Schedule of Values within 15 days after date of Owner- Contractor Agreement.

B. Format: Use Table of Contents of this Project Manual. Identify each line item with number and title of major specification Section.

C. Include within each line item, a direct proportional amount of Contractor's overhead and profit.

D. Revise schedule to list approved Change Orders, with each Application for Payment.

1.02 APPLICATIONS FOR PAYMENT

A. Submit 3 copies of each application.

B. Content and format: Use Schedule of Values for listing items in Application for Payment.

C. Submit an updated construction schedule with each Application for Payment.

D. Payment period: Submit at intervals stipulated in Agreement.

E. Submit with transmittal letter as specified for Submittals in Section 01 33 00.

1.03 CHANGE PROCEDURES

A. Submittals: Submit name of individual authorized to receive change documents, and be responsible for informing others in Contractor's employ or Subcontractors of changes to Work.

B. Engineer will advise of minor changes in Work not involving an adjustment to Contract Price or Contract Time by issuing supplemental instructions on Engineer’s Instruction to Contractor (ITC) Form.

C. Contracting Officer (CO) may issue a proposal request which includes detailed description of proposed change with supplementary or revised Drawings and Specifications, change in Contract Time for executing change. Contractor will prepare and submit an estimate within 10 days.

D. Contractor may propose changes by submitting a request for change to Contracting Officer (CO), describing proposed change and its full effect on Work. Include a statement describing reason for change, and effect on Contract Price and Contract Time with full documentation and a statement describing effect on Work by separate or other contractors. Document any requested substitutions in accordance with Section 01 60 00.

E. Stipulated price Change Order: Based on proposal request and Contractor's fixed price quotation or Contractor's request for a Change Order as approved by Contracting Officer (CO).

F. Unit price Change Order: For contract unit prices and quantities, Change Order will be executed on a fixed unit price basis. For unit costs or quantities of units of work which are not pre-determined, execute Work under a Construction Change Directive. Changes in Contract Price or Contract Time will be computed as specified for Time and Material Change Order.

G. Construction Change Directive: Contracting Officer (CO) may issue a directive, instructing Contractor to proceed with a change in Work, for subsequent inclusion in a Change Order. Document will

PRICE AND PAYMENT PROCEDURES 27100.03.00

Page 2 - SECTION 01 20 00 ms1797 describe changes in Work, and designate method of determining any change in Contract Price or Contract Time. Promptly execute change.

H. Time and material Change Order: Submit itemized account and supporting data prior to implementing change, within time limits indicated in Conditions of Contract. Contracting Officer (CO) will determine change allowable in Contract Price and Contract Time as provided in Contract Documents.

I. Maintain detailed records of work done on time and material basis. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in Work.

J. Document each quotation for a change in cost or time with sufficient data to allow evaluation of quotation.

K. Change Order Forms: Change Order Form bound at end of Project Manual.

L. Execution of Change Orders: Contracting Officer (CO) will issue Change Orders for signatures of parties as provided in Conditions of Contract.

M. Correlation of Contractor submittals:

1. Promptly revise Schedule of Values and Application for Payment forms to record each authorized

Change Order as a separate line item and adjust Contract Price.

2. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by change, and resubmit.

3. Promptly enter changes in Project Record Documents.

1.04 REQUEST FOR INFORMATION

A. Questions regarding conflicts or intent of the Contract Documents shall be submitted by Contractor on attached Request for Information (RFI) form.

1.05 DEFECT ASSESSMENT

A. Replace Work, or portions of Work, not conforming to specified requirements.

B. If, in opinion of Owner, it is not practical to remove and replace Work, Owner will direct an appropriate remedy or adjust payment.

C. Authority of Owner to assess defect and identify payment adjustment, is final.

D. Nonpayment for rejected products: Payment will not be made for rejected products for any of following:

1. Products wasted or disposed of in a manner that is not acceptable.

2. Products determined as unacceptable before or after placement.

3. Products not completely unloaded from transporting vehicle.

4. Products placed beyond lines and levels of required Work.

5. Products remaining on hand after completion of Work.

6. Loading, hauling, and disposing of rejected products.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

REQUEST FOR INFORMATION

RFI No.:

Contract No.

and Name:

Date:

Contractor: Owner:

Engineer:

Subject:

Drawing Reference: Spec Section:

Information Required (Be Specific):

Contractor Representative Date

Reply:

Engineer Representative Date

THIS IS NOT A CHANGE IN SCOPE AUTHORIZATION. IF, IN YOUR OPINION, THIS RESPONSE INVOLVES WORK WHICH CHANGES THE CONTRACT PRICE OR TIME, YOU MUST SUBMIT A PROPOSAL OR A NOTICE AS REQUIRED

IN THE CONTRACT DOCUMENTS.

27100.03.00 UNIT PRICES

ms1797 SECTION 01 22 00 - Page 1

1.01 UNIT PRICE REQUIREMENTS

A. Items of Work described herein are specifically listed in the Agreement for separate measurement and payment.

B. No other items of Work required by Contract Documents shall be measured or paid for as a separate item, but shall be included as part of listed unit price item to which Work pertains. Failure to list all such related Work in the following descriptions of unit price items shall not invalidate this stipulation.

C. Contractor shall measure unit price quantities for payment and submit to Engineer.

1.02 DESCRIPTION OF UNIT PRICE ITEMS

A. Demolish Existing WWTP and Associated Piping; each (Ea.): Unit price includes all costs and labor associated with dismantling and disposing of the existing WWTP and appurtenances.

B. Installation of New Package WWTP; lump sum (LS): Unit price includes all costs and labor associated with installation of package treatment system including, if required, modifications necessary to accommodate equipment installation.

C. Water Main; linear foot (LF): Unit price includes all costs for joints, fittings, specials, pipe, excavation, pavement removal, bedding, if required, carefully placed backfill to depth of one foot over top of pipe, remaining backfill with job excavated material, sheeting and shoring, utility repair, surface restoration, dewatering, thrust blocking, testing, disinfection, sidewalk replacement, water and sewer house service repair, curb and gutter replacement, connections to existing system, and miscellaneous associated work required to furnish and install water main of sizes listed. Includes removal, transporting, and disposal of excess excavated material. Measurement will be made along center line of main as placed, from center to center of fittings with no deductions for fittings or valves. Does not include tunneled or jacked crossings or horizontal directional drilling which are separate unit price items.

D. Valve Manholes; each (Ea.): Unit price includes furnishing material, frame and lid, concrete pipe, concrete steps if required, additional excavation, dewatering, backfill, select backfill, surface restoration, pavement replacement, and miscellaneous associated work to install air relief or main line valve manholes complete.

E. Sanitary Sewer; linear foot (LF): Unit Price includes all costs for furnishing, handling and laying pipe, pipe bedding materials, carefully placed backfill to depth of one foot over top of pipe, special fittings, trench excavation, dewatering, sheeting, shoring, remaining backfill with job excavated material, piping and pumping for bypassing sewage flow as necessary to maintain service, clearing, grubbing and tree removal considered incidental, utility company charges for temporary relocations, supports or bracing, surface restoration, infiltration and exfiltration testing, and incidental work except pavement replacement. Includes removal, transportation and disposal of removed pavements and excess excavated material. Length will be measured along center line of pipe with no deduction for manholes.

Measurement will be to outside face of manhole. Force Main; linear foot (LF): Unit price includes all costs for furnishing, handling and laying pipe, trench excavation, dewatering, utility repair sheeting and shoring, bedding, carefully placed backfill to one foot over top of pipe, remaining backfill with job excavated material, surface restoration except pavement replacement, and incidental work.

Measurement will be made along center line of pipe with no deductions for fittings or manholes. Does not include tunneled or jacked crossings or horizontal directional drilling which are separate unit price items.

F. Manholes:

1. Standard; each (Ea.): Unit price includes all costs for furnishing and installing manhole, excavation, concrete, waterproofing if required, stub pipes, chimney seals if required, flexible watertight connections, frame and lid, backfilling, connections to existing systems if required, and

UNIT PRICES 27100.03.00

Page 2 - SECTION 01 22 00 ms1797 miscellaneous associated work for standard or shallow manholes zero to 8' deep measured from top of cover to invert of lowest sewer.

2. Extra Depth; linear foot (LF): Unit price includes all costs for depth in excess of 8' for standard manholes as measured from top of cover to invert of lowest sewer.

3. Drop Connections; each (Ea.): Unit price includes additional costs over standard manhole costs for excavation, concrete, dewatering, pipe and fittings, and miscellaneous associated work to construct drop connection.

G. Rock Excavation; cubic yard (CY): Unit price includes additional cost of labor, materials, equipment, removal and disposal, and incidentals for rock excavation over cost of earth excavation. Measurement computed by average end area method of actual rock excavated up to following maximum width limits:

1. 30" maximum for pipe 15" or less internal diameter.

2. 16" plus outside diameter of pipe for pipe larger than 15" internal diameter.

3. One foot outside wall line of manhole appurtenances.

H. Granular Fill Under Pipe; cubic yard (CY): Unit price includes additional costs for excavation, dewatering, labor, materials, equipment, and incidentals for providing granular fill in place of unsuitable foundation materials where authorized by Engineer. Does not include pipe bedding material. Measurement computed by average end area method.

I. Seeding; square yard (SY): Unit price includes all costs for seed bed preparation, seeding, fertilizer, mulch, watering, and establishment; and incidentals for re-establishing lawns and grass areas.

J. Cast-In-Place Concrete Structures; lump sum (LS): Price includes all costs for labor, materials, excavation, dewatering, form work, reinforcing steel, concrete, embedded items, mechanical items, curing, backfilling and incidentals for concrete construction. Includes PVC liners and waterproofing.

K. Fence; linear foot (LF): Unit price includes cost of labor, materials and equipment for furnishing, handling and installing fabric, posts, gates, and accessories required for a complete installation of new fence. Length shall be as measured along bottom strand.

L. Demolition; lump sum (LS): Price includes furnishing material and labor for removal and disposal of structures, and equipment. Includes any backfilling made necessary by these operations.

M. Stormwater Pollution Prevention; lump sum (LS): Price includes costs for materials and labor for preparation and submittal for permitting of acceptable and effective stormwater pollution prevention plan in accordance with Texas Commission on Environmental Quality (TCEQ) requirements. Includes implementation of approved plan.

N. Erosion Control; lump sum (LS): Price includes costs for materials and labor to implement effective erosion control.

O. Traffic Control; lump sum (LS): Price includes costs for materials and labor to provide, install and remove temporary traffic control devices required for construction.

P. Select Backfill Over Pipe; cubic yard (CY): Unit price includes all costs for furnishing and placing select backfill or suitable trench excavated material meeting requirements of select backfill when trench center line is within 10' of paved surfaces, disposal of excess excavated material, compaction and incidentals. Measurement computed by average end area method of actual select backfill placed from depth of 1' above top of pipe to bottom of base under pavement, or to bottom of topsoil in grassed areas. No payment will be made for placing, grading, or removing select backfill material above bottom of pavement base to provide temporary access prior to pavement replacement. No payment will be made due to excavation beyond the following limits.

1. Top of trench width equal to limitation defined under pavement replacement, less 2'.

2. Trench width at top of pipe equal to outside diameter of pipe, plus the following:

a. 2" - 30" pipe: 2'.

b. 36" - 78" pipe: 3'.

c. 84" and larger: 4'.

27100.03.00 UNIT PRICES

ms1797 SECTION 01 22 00 - Page 3

27100.03.00 PRODUCT SUBSTITUTIONS PROCEDURES

ms1797 SECTION 01 25 13 - Page 1

1.01 SUBSTITUTIONS

A. For period of 30 days after effective date of Agreement, Engineer will consider formal requests from Contractor for substitution of products in place of those specified. After end of that period, requests will be considered only in case of product unavailability or other conditions beyond control of Contractor.

B. Submit 3 copies of request for substitution for consideration using attached Product Substitution Request Form. Limit each request to one proposed Substitution. Support each request with:

1. Complete data substantiating compliance of proposed substitutions with requirements stated in

Contract Documents. Burden of proof is on proposer.

a. Product identification, including manufacturer's name and address.

b. Manufacturer's literature; identify:

1) Product description.

2) Reference standards.

3) Performance and test data.

c. Samples, as applicable.

d. Name and address of similar projects on which product has been used, and date of each installation.

2. Itemized comparison of proposed substitution with product specified; list significant variations.

3. Data relating to changes in construction schedule.

4. Any effect of substitution on separate contracts.

5. List of changes required in other work or products.

6. Accurate cost data comparing proposed substitution with product specified. Amount of any net change to Contract Price.

7. Designation of required license fees or royalties.

8. Designation of availability of maintenance services, sources, or replacement materials.

C. Substitutions will not be considered for acceptance when:

1. They are indicated or implied on Shop Drawings.

2. They are requested directly by Subcontractor or supplier.

3. Acceptance will require substantial revision of Contract Documents.

D. Substitute products shall not be ordered or installed without written notification from Engineer of Owner's acceptance.

E. Engineer will determine acceptability of proposed substitutions.

1.02 CONTRACTOR'S REPRESENTATION

A. In making formal request for substitution Contractor represents that:

1. It has investigated proposed product and has determined that it is equal to or superior in all respects to that specified.

2. It will provide same warranties or Bonds for substitution as for product specified or as required by

Owner.

3. It will coordinate installation of accepted substitution into Work, and will make such changes as may be required for Work to be complete in all respects.

4. It waives claims for additional costs caused by substitution which may subsequently become apparent.

5. Cost data is complete and includes related costs under its Agreement, but not:

a. Costs under separate contracts.

b. Engineer's costs for redesign or revision of Contract Documents.

6. It will reimburse Owner for charges of Engineer or Engineer's consultants for evaluating any proposed substitute, whether proposed substitute is accepted or rejected.

PRODUCT SUBSTITUTION PROCEDURES 27100.03.00

Page 2 - SECTION 01 25 13 ms1797

1.03 ENGINEER DUTIES

A. Review Contractor's requests for substitution with reasonable promptness and advise Owner.

B. Notify Contractor in writing of Owner's decision to accept or reject requested substitution.

PRODUCT SUBSTITUTION REQUEST FORM

To:

Project:

Specified Item:

Section Page Paragraph Description

The undersigned request consideration of the following:

PROPOSED SUBSTITUTION

Attached data includes product description, specifications, drawings, photographs, performance, and test data adequate for evaluation of the request; applicable portions of the data are clearly identified.

Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation.

The undersigned certifies that the following paragraphs, unless modified by attachments are correct:

1. The proposed substitution does not affect dimensions shown on Drawings.

2. The undersigned will pay for changes to the building design, including engineering design, detailing, and construction costs caused by the requested substitution.

3. The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty requirements.

4. Maintenance and service parts will be locally available for the proposed substitution.

The undersigned further states that the function, appearance, and quality of the proposed substitution are equivalent or superior to the specified item.

Submitted by:

Signature For use by Engineer/Architect

Firm � Approved � Approved as noted

Address � Not Approved � Received too late

By

Date Date

Telephone Remarks

Attachments

27100.03.00 ADMINISTRATIVE REQUIREMENTS

ms1797 SECTION 01 30 00 - Page 1

1.01 COORDINATION AND PROJECT CONDITIONS

A. Coordinate scheduling, submittals, and Work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

C. Coordinate space requirements, supports, and installation of mechanical and electrical Work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

D. In finished areas, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

E. Coordinate completion and clean-up of Work of separate sections in preparation for Substantial Completion.

F. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities.

1.02 COPIES OF DRAWINGS AND PROJECT MANUALS

A. After Notice of Award, Contractor may obtain, at no charge, 1 hard copy of Drawings and Project Manual and one set in electronic format. Additional copies will be furnished upon request at the cost of reproduction plus handling charge.

B. Additional copies of project manuals and half-size and full-size Drawings may be obtained under following conditions:

1. Project manuals:

a. Furnished at Engineer's reproduction cost plus handling charge.

b. If Contractor's requirement for additional project manuals necessitates reprinting of project manuals, Contractor shall pay entire cost of such reprinting.

c. Partial sets of project manuals will not be provided.

2. Half-size Drawings:

a. Furnished at Engineer's reproduction cost plus handling charge.

b. If Contractor's requirement for additional Drawings necessitates reprinting of half-size

Drawings, Contractor shall pay entire cost of such reprinting.

3. Full-size Drawings: Complete sets of full-size Drawings may be purchased from Engineer at

Engineer's reproduction cost plus handling charge per set.

C. Revised Drawings and project manuals, if required, will be provided by Engineer to show authorized changes or extra Work under following conditions:

1. Project manuals: Furnished at no charge, in same quantity as original issuance.

2. Half-size Drawings:

a. Half-size Drawings will be available as revised Drawings.

b. One revised, complete set of half-size Drawings will be issued, at no charge, for each half-size set originally issued and for each half-size set purchased by Contractor after Notice of Award.

3. Full-size Drawings:

a. One revised, complete set of full-size Drawings will be issued, at no charge, for each full-size set originally issued.

ADMINISTRATIVE REQUIREMENTS 27100.03.00

Page 2 - SECTION 01 30 00 ms1797

b. One revised, complete set of full-size Drawings will be issued, at no charge, for each full-size set originally issued, and for each full-size set purchased by Contractor after Notice of Award, up to 4 copies maximum.

4. One full-size reproducible set will be issued to accommodate fifth and subsequent sets purchased by Contractor. Contractor shall use reproducible set to complete printing for additional Drawings in its possession.

1.03 PROJECT SITE ADMINISTRATION

A. Contractor shall provide competent, suitably qualified personnel to survey and lay out Work and perform construction as required by Contract Documents. Contractor shall at all times maintain good discipline and order at site.

B. Except in connection with safety or protection of persons or Work or property at site or adjacent thereto, and except as otherwise indicated in Contract Documents, all Work at site shall be performed during regular working hours, and Contractor shall not permit overtime work or performance of Work on Saturday, Sunday, or any legal holiday without Owner's written consent given after prior written notice to Contracting Officer (CO).

C. Incompetent or incorrigible employees shall be dismissed from Work by Contractor or its representative when requested by Contracting Officer (CO), and such persons shall not again be permitted to return to Work without written consent of Contracting Officer (CO).

D. Workmanship shall be of best quality.

1.04 FIELD ENGINEERING

A. Employ a Land Surveyor registered in the State of Texas and acceptable to Contracting Officer (CO).

B. Contractor shall locate and protect survey control and reference points. Promptly notify Contracting Officer (CO) of any discrepancies discovered.

C. Control datum for survey is that shown on Drawings.

D. Verify set-backs and easements; confirm drawing dimensions and elevations.

E. Provide field engineering services. Establish elevations, lines, and levels, utilizing recognized engineering survey practices.

F. Submit a copy of site drawing and certificate signed by the Land Surveyor that the elevations and locations of the Work are in conformance with the Contract Documents.

G. Maintain a complete and accurate log of control and survey work as it progresses.

H. Protect survey control points prior to starting site work; preserve permanent reference points during construction.

I. Promptly report to Contracting Officer (CO) the loss or destruction of any reference point or relocation required because of changes in grades or other reasons.

J. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to Contracting Officer (CO).

1.05 PROJECT MEETINGS

A. Representatives of Contractor, Subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of entity each represents.

ms1797 SECTION 01 30 00 - Page 3

B. Preconstruction meeting:

1. Owner will schedule a meeting 15 days after Notice to proceed.

2. Location designated by Owner.

3. Attendance:

a. Owner's representative.

b. Resident Project Representative.

c. Engineer, as requested by Owner.

d. Contractor's superintendent.

e. Major Subcontractors.

f. Major suppliers.

g. Others as appropriate.

4. Suggested Agenda:

a. Execution of Owner-Contractor Agreement if not already done.

b. Submission of executed bonds and insurance certificates, if not already done.

c. Distribution of Contract Documents, if not already done.

d. Submission of list of Subcontractors, list of products, schedule of values, and progress schedule.

e. Designation of personnel representing the parties in Contract.

f. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

g. Scheduling.

h. Owner will prepare meeting agenda and Contractor shall record minutes and distribute copies within 2 days after meeting to participants, with copies to Engineer, Owner, participants, and those affected by decisions made.

C. Site mobilization meeting:

1. Owner will schedule a meeting at the Project site prior to Contractor occupancy.

2. Attendance required: Owner, Contractor, Contractor's Superintendent, and major Subcontractors.

3. Agenda:

a. Use of premises by Owner and Contractor.

b. Owner's requirements.

c. Construction facilities and controls provided by Owner.

d. Temporary utilities provided by Owner.

e. Survey layout.

f. Security and housekeeping procedures.

g. Schedules.

h. Application for payment procedures.

i. Procedures for testing.

j. Procedures for maintaining record documents.

k. Requirements for start-up of equipment.

l. Inspection and acceptance of equipment put into service during construction period.

4. Contractor will record minutes and distribute copies within 2 days after meeting to participants, with copies to Engineer, Owner, participants, and those affected by decisions made.

D. Progress meetings:

1. Schedule and administer meetings throughout progress of the Work at periodic intervals.

2. Owner will hold meetings as required by progress of Work.

3. Location of meetings: Project field office of Owner.

4. Owner will make arrangements for and will preside at meetings, Contractor will prepare agenda with copies for participants..

5. Attendance:

a. Engineer, and its professional consultants as requested by Owner.

b. Contractor and Subcontractors as appropriate to agenda.

c. Suppliers as appropriate to agenda.

d. Others.

6. Suggested agenda:

a. Review, approval of minutes of previous meeting.

b. Review of Work progress since previous meeting.

c. Field observations, problems, conflicts.

ADMINISTRATIVE REQUIREMENTS 27100.03.00

Page 4 - SECTION 01 30 00 ms1797

d. Problems which impede construction schedule.

e. Review of off-site fabrication, delivery schedules.

f. Corrective measures and procedures to regain projected schedule.

g. Revisions to construction schedule.

h. Progress, schedule, during succeeding Work period.

i. Coordination of schedules.

j. Review submittal schedules; expedite as required.

k. Maintenance of quality standards.

l. Pending changes and substitutions.

m. Review proposed changes for:

1) Effect on construction schedule and on completion date.

2) Effect on other contracts of Project.

3) Other business.

7. Contractor will record minutes and distribute copies within 2 days after meeting to participants, with copies to Engineer, Owner, participants, and those affected by decisions made.

PART 2 PRODUCTS

2.01 EQUIPMENT ELECTRICAL CHARACTERISTICS AND COMPONENTS

A. Motors: Specific motor type is specified in individual specification sections.

B. Wiring Terminations: Provide terminal lugs to match branch circuit conductor quantities, sizes, and materials indicated. Include lugs for terminal box.

C. Cord and Plug: Provide minimum 6' (2 m) cord and plug including grounding connector for connection to electric wiring system. Cord of longer length is specified in individual specification sections.

PART 3 EXECUTION

3.01 SPECIAL PROCEDURES

A. Materials: As specified in product sections; match existing with new products for patching and extending work.

B. Employ skilled and experienced installer to perform alteration work.

C. Cut, move, or remove items as necessary for access to alterations and renovation Work. Replace and restore at completion.

D. Remove unsuitable material not marked for salvage, such as rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished Work.

E. Remove debris and abandoned items from area and from concealed spaces.

F. Prepare surface and remove surface finishes to provide for proper installation of new work and finishes.

G. Close openings in exterior surfaces to protect existing work from weather and extremes of temperature and humidity.

H. Remove, cut, and patch Work in a manner to minimize damage and to provide means of restoring products and finishes to specified condition.

I. Refinish existing visible surfaces to remain in renovated rooms and spaces, to renewed condition for each material, with a neat transition to adjacent finishes.

ms1797 SECTION 01 30 00 - Page 5

J. Where new Work abuts or aligns with existing, provide a smooth and even transition. Patch Work to match existing adjacent Work in texture and appearance.

K. When finished surfaces are cut so that a smooth transition with new Work is not possible, terminate existing surface along a straight line at a natural line of division and submit recommendation to Engineer for review.

L. Where a change of plane of 1/4" (6 mm) or more occurs, submit recommendation for providing a smooth transition to Engineer for review.

M. Trim existing doors as necessary to clear new floor finish. Refinish trim as required.

N. Patch or replace portions of existing surfaces which are damaged, lifted, discolored, or showing other imperfections.

O. Finish surfaces as specified in individual product sections.

27100.03.00 SUBMITTAL PROCEDURES

ms1797 SECTION 01 33 00 - Page 1

1.01 SUBMITTAL PROCEDURES

A. Deliver submittals to person listed below when required by Specification Sections:

1. Consulting Engineer:

Mr. Jeremy Reinier Email: reinierjeremy@stanleygroup.com Stanley Consultants, Inc.

100 Court Ave Ste 300 Des Moines, Iowa 50309

2. Owner:

Mr. Kirk Richardson, Facility Manager Email: kirk.f.richardson@aphis.usda.gov USDA APHIS PPS Moore Air Base 22675 North Moorefield Road, Bldg. 6407 Edinburg, Texas 78541

Ms. Rheta Johnson, Project Engineer Email: Rheta.R.Johnson@aphis.usda.gov Room 3A-03.40 4700 River Road, Unit 115 Riverdale, MD 20737

B. Submittals shall be in English language.

C. Weights, measures, and units shall be English units with SI metric values following in parenthesis.

D. Symbols and drawings shall conform to ANSI Y32.2/IEEE 315/CSA Z99.

1.02 CONTRACTOR RESPONSIBILITIES

A. Review submittals prior to submission.

B. Determine and verify:

1. Field measurements.

2. Field construction criteria.

3. Catalog numbers and similar data.

4. Conformance to Specifications.

C. Coordinate each submittal with other submittals and with requirements of Work and of Contract Documents.

D. Notify Engineer in writing, at time of submission, of any deviations in submittals from requirements of Contract Documents. Any such deviations permitted by Engineer will require modifications of Contract Documents.

E. Provide space on Shop Drawings for Contractor and Engineer stamps.

F. When Shop Drawings are revised for resubmission, identify all changes made since previous submission.

G. Submittals containing language imposing duties on others (such as verification of dimensions or supply of related information) inconsistent with contract language shall be null and void.

mailto:reinierjeremy@stanleygroup.com mailto:kirk.f.richardson@aphis.usda.gov mailto:Rheta.R.Johnson@aphis.usda.gov

SUBMITTAL PROCEDURES 27100.03.00

Page 2 - SECTION 01 33 00 ms1797

H. Submittals shall not be used as media for inquiries for information or for verification of information that must be supplied by others to Contractor. Inquiries or verification of information shall be made by separate Contractor submittal using Request for Information (RFI) process.

I. Begin no fabrication or Work which requires submittal review until return of submittals by Engineer with stamp, as either "Reviewed", “Reviewed as Noted", or “Reviewed as Noted-Resubmit.”

J. Distribute copies of reviewed submittals that carry Engineer stamp as either "Reviewed" or "Reviewed as Noted" as appropriate. Instruct parties to promptly report any inability to comply with requirements.

K. Submittals not requested will not be recognized or processed.

1.03 ENGINEER DUTIES

A. Review required submittals with reasonable promptness and in accord with schedule, only for general conformance to design concept of Project and compliance with information given in Contract Documents. Review shall not extend to means, methods, sequences, techniques, or procedures of construction or to safety precautions or program incident thereto. Review of a separate item as such will not indicate approval of assembly in which item functions.

B. Affix stamp and initials or signature, and indicate requirements for resubmittal, or review of submittal.

Engineer's action on submittals is classified as follows:

1. Reviewed: Submittal has been reviewed and appears to be in conformance to design concept of

Project and Contract Documents. Contractor may proceed with fabrication of work in submittal.

2. Reviewed As Noted: Submittal has been reviewed and appears to be in conformance to design concept of Project and Contract Documents, except as noted by reviewer. Contractor may proceed with fabrication of work in submittal with modifications and corrections as indicated by reviewer.

3. Reviewed As Noted-Resubmit: Submittal has been reviewed and appears to be in conformance to design concept of Project and Contract Documents, except as noted by reviewer. Contractor may proceed with fabrication of work in submittal with modifications and corrections as indicated by reviewer. Contractor shall make any corrections indicated by reviewer and resubmit for review.

4. Resubmit: Submittal has been reviewed and appears not to be in conformance to design concept of Project or with Contract Documents. Contractor shall not proceed with fabrication of work in submittal, but instead shall make any corrections required by reviewer and resubmit for review.

5. Returned without Review: Submittal is being returned without having been reviewed because: 1) not required by Contract Documents; 2) grossly incomplete; 3) indicates no attempt at conformance to Contract Documents; 4) cannot be reproduced; 5) lacks Contractor's completed approval stamp; or 6) lacks design professional's seal when required by law or Contract Documents. If submittal is required by Contract Documents, Contractor shall not proceed with Work as detailed in submittal, but instead shall correct defects and resubmit for review.

6. For Information Only: Submittal has not been reviewed but is being retained for informational purposes only.

7. Void: Submittal is voided because it is no longer required or has been superseded by another submittal.

C. Return 1 copy of submittals to Contractor. Contractor shall make additional copies as required.

D. Review of submittals shall not relieve Contractor from responsibility for any variation from Contract Documents unless Contractor has, in writing, called Engineer's attention to such variation at time of submission, and Engineer has given written concurrence pursuant to Contract Documents to specific variation, nor shall any concurrence by Engineer or other reviewer relieve Contractor from responsibility for errors or omissions in submittals.

1.04 SHOP DRAWINGS SUBMITTALS

A. Submit for review for limited purpose of checking for conformance to information given and design concept expressed in Contract Documents. Produce copies and distribute in accordance with article “Submittal Procedures” and for record documents purposes as described in Section 01 70 00.

ms1797 SECTION 01 33 00 - Page 3

B. Designate in construction schedule, or in separate coordinated submittal schedule, dates for submission and dates that reviewed submittals will be needed.

C. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in Work or in work of other contractors.

D. Present in clear and thorough manner, complete with respect to dimensions, design criteria, materials of construction, and like information to enable review of information as required.

E. Details shall be identified by reference to sheet and detail, schedule or room numbers shown on Drawings.

F. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

G. Equipment which is identified on Contract Documents with tag number or name shall be identified on Shop Drawing with same tag.

H. Schedule submittals to expedite Project. Coordinate submission of related items.

I. For each submittal for review, allow 20 days excluding delivery time to and from Contractor.

J. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work.

K. Shop Drawings shall be submitted in electronic format.

1. Submit electronic copy on CD, E-mail files, or post in FTP site.

2. Text documents shall be submitted in .pdf format.

3. Drawings shall be submitted in .pdf or .tif format.

4. Electronic submittal shall be suitable for reproduction in black and white.

L. Submittals shall contain:

1. Date of submission and dates of any previous submissions.

2. Project title and number.

3. Contract identification.

4. Names of:

a. Contractor.

b. Supplier.

c. Manufacturer.

5. Identification of product, with Specification section number and article number.

6. Field dimensions, clearly identified as such.

7. Relation to adjacent or critical features of Work or materials.

8. Applicable standards, such as ASTM or Federal Specification numbers.

9. Identification of deviations from Contract Documents.

10. Identification of revisions on resubmittals.

11. An 8" x 3" blank space for Contractor and reviewer stamps.

12. Indication of Contractor's approval, initialed or signed, with wording substantially as follows:

"Contractor represents to Owner and Engineer that Contractor has either determined and verified all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data, or assumes full responsibility for doing so and has reviewed or coordinated each submittal with requirements of Work and Contract Documents."

13. If Contract Documents include performance specifications stating required results which can be verified as meeting stipulated criteria, so that further design by Contractor prior to fabrication is necessary, Submittal depicting such design must be prepared under seal of professional engineer registered in appropriate state and Submittal shall be signed and sealed in accordance with applicable regulations and with following certification statement:

Page 4 - SECTION 01 33 00 ms1797

"I hereby certify that this engineering document was prepared by me or under my direct personal supervision, that I am a duly registered professional engineer under laws of state of Texas and I accept responsibility for adequacy of this document to meet criteria stipulated in Contract Documents."

M. Product Data:

1. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

2. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

N. Design data:

1. Submit for Engineer's knowledge as contract administrator or for Owner.

2. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

O. Test reports:

1. Submit for Engineer's knowledge as contract administrator or for Owner.

2. Submit test reports for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

P. Certificates:

1. When specified in individual specification sections, submit certification by manufacturer, installation/application subcontractor.

2. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

3. Certificates may be recent or previous test results on material or product, but must be acceptable to reviewer.

Q. Manufacturer's instructions:

1. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Engineer for delivery to Owner in quantities specified for Product Data.

2. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

R. Manufacturer's field reports:

1. Submit report within 30 days of observation for information.

2. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

S. Erection drawings:

1. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

2. Data indicating inappropriate or unacceptable Work may be subject to action by Engineer or

Owner.

T. Samples:

1. Samples for selection as specified in product sections:

a. Submit for aesthetic, color, or finish selection.

b. Submit samples of finishes in colors, textures, and patterns for selection.

2. Submit to illustrate functional and aesthetic characteristics of product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

3. Include identification on each sample, with full Project information.

4. Submit number specified in individual Specification Sections; 1 of which will be retained by

Engineer.

5. Reviewed Samples which may be used in Work are indicated in individual Specification Sections.