126021 - SOW updated.docx
DOCX document 50 KB Posted
- Attached to
- Argyle Lake SP Storage Tank Replacements SPEC
- Solicitation number
- 26-422DNR-REALT-B-51654
- Issued by
- Mclean County, Illinois
About this file
This is a Scope of Work and Project Requirements document issued by the Illinois Department of Natural Resources for a small purchase procurement project. The project involves replacing two existing 1,000-gallon above-ground fuel storage tanks at Argyle Lake State Park's Office/Maintenance Building in Colchester, Illinois with two new 1,000-gallon double-wall fuel tanks and associated equipment. The scope of work includes disconnecting and removing the existing tanks, installing new tanks with pump brackets, fuel pumps rated at 20 gallons per minute, hoses, nozzles, filter systems, anti-siphon valves, eighteen 6-inch by 7-foot pipe bollards with yellow covers, one 20-pound ABC fire extinguisher with cabinet, and providing one hour of training on system operation and maintenance. All work must comply with NFPA, IDPH, and EPA regulations. Bids are valid for 90 calendar days from submission, and all work must be completed by June 30, 2026. No mandatory project meeting or site visit is required, and no specific bidders conference is listed.
The project is designated as a small business set-aside requiring the awarded contractor to be registered as a small business with the Illinois Department of Central Management Services. The contractor must be certified by the manufacturer to sell and/or install the specified equipment and maintain general commercial liability insurance of $1,000,000 per occurrence with $2,000,000 annual aggregate, auto liability of $1,000,000 per occurrence, and workers' compensation insurance as required by law. A performance bond and labor and material payment bond are required if the project cost exceeds $150,000. The contractor must comply with prevailing wage requirements under the Prevailing Wage Act and submit certified payroll records monthly. A $15 administrative fee applies under the Minority Contractor Opportunity Initiative. The contract will be awarded to the lowest, responsible, responsive bidder, and all materials must be new and manufactured or produced in the United States in accordance with the Steel Products Procurement Act unless a waiver is granted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SMALL PURCHASE PROCUREMENT
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: February 4, 2026 File# 1-26-021
LOCATION: Argyle Lake State Park – Office/ Maintenance Building
PROJECT TITLE: Replace Two (2) Existing 1000 Gallon Above Ground Storage Tanks with Two (2) New 1000 Gallon Above Ground Storage Tanks
PROJECT NARRATIVE:
Two (2) existing 1000 gallon above ground fuel tanks located at the Office/ Maintenance Building have failed. Due to their age and condition, it is in the best interest to change out these tanks with two (2) new 1000 gallon above ground storage tanks.
SCOPE OF WORK:
Office/ Maintenance Building:
1) Disconnect and remove two (2) existing 1000 gallon above ground fuel tanks and associated hardware located at the Office/ Maintenance Building. Dispose of off site per all applicable regulations.
2) Provide and install two (2) new 1000 gallon above ground double wall fuel tanks in same location.
3) Provide and install two (2) new pump brackets, two (2) new fuel pumps rated at 20 gallons per minute, two (2) new 1 inch x 18 foot long hoses, and two (2) new high flow nozzles.
4) Each new tank compartment to include accessory kit, adapter head, 10 Micron filter, Anti-Siphon Valves, Brass Ball Valve Port, and Two (2) Decals labeling fuel type.
5) Provide and install Eighteen (18) new 6” x 7’ pipe bollards with yellow post covers.
6) Provide one (1) 20 lb ABC fire extinguisher with steel cabinet.
7) All new work to meet applicable NFPA, IDPH, and EPA regulations.
8) Provide one (1) hour training on the operation and maintenance of the new fuel system.
ATTACHMENTS:
The following documents are included:
1. N/A
PROJECT SPECIFICATIONS & REQUIREMENTS:
Acceptable Manufacturers include the following which have undergone numerous safety testing and wear testing by Underwriters Laboratories (UL), Applied Research Laboratory (ARL) and many other nationally recognized testing laboratories. These manufacturers have also been recognized for quality construction and superior performance by consumer-based organizations such as Consumer Reports. [Bidders must be certified by the manufacturer to sell and / or install the equipment from the specified acceptable manufacturers listed below.] “Or Equal” submissions will not be rejected because of minor differences in design, construction or features that do not affect the suitability of the product for its intended use. Burden of Proof that the product is equal is on the bidder.
A. Acceptable Manufacturers Include:
1) N/A
| B. | Project Instructions and Notes: |
| 1) | Historic Structure: |
N/A
2) Thirty percent (30%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.
3) Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the site superintendent.
4) Deliverables and Staff Training:
Two (2) sets of operating and maintenance manuals and start-up procedures shall be provided to DNR. DNR staff shall receive one (1) hour of training and instruction on the operation and maintenance of all new equipment.
5) Shop Drawings:
Submit for the approval of the DNR Project Architect/Engineer, shop drawings and product data for the following items:
a. N/A
6) As-Built Markups:
N/A
| 7) | Extended Warranty: |
| a) | Workmanship, materials and equipment subject to seasonal loads will be in conformance with the contract and free from defects for a period of one year, commencing from the goods acceptance date. This includes, but is not limited to, heating, ventilating, air conditioning, temperature control and test and balance work, as specified. |
| b) | Seeded areas shall be warranted for a period of one year plus one growing season. |
| C. | Project Requirements: |
| 1) | Project Meeting |
| PROJECT MEETING TO BE HELD: NO | |
| MANDATORY ATTENDANCE: NO |
| 2) | Duration |
| Bids shall be good for ninety (90) calendar days after the submittal date, or | |
| for an extended period, if agreed to in writing by the Bidder and DNR. |
| 3) | Prevailing Wage Rates |
| The Contractor must comply with provisions of the “Prevailing Wage Act”, 820 ILCS 130/, | |
| and the Illinois Procurement Code (30 ILCS 500/25-60), which applies to the wages of laborers, | |
| mechanics and other workers employed in any public works. The Contractor is responsible for | |
| contacting the Illinois Department of Labor (DOL) at 217/782-6206 or | |
| http://www.state.il.us/agency/idol to ensure understanding of prevailing wage requirements. |
| 4) | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Labor.
5) Small Business Set-Aside The contractor awarded the bid must be registered as a small business, as required by the Small Business Set-Aside program. (For complete requirements, to become registered, or certify your business in the Small Business Set-Aside Program, visit http://www.sell2.illinois.gov/sbsp/set_aside.htm. or contact the Department of Central Management Services’ small business coordinator at 1-866-455-2897.)
6) Apprenticeship-in-Training When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .
| 7) | Subcontractors |
| The Contractor shall identify the names of all subcontractors to be utilized by them in the | |
| performance of this contract, together with the anticipated amount of money that each | |
| subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois | |
| Procurement Code (30 ILCS 500/1-15.108), a person or entity is not a “subcontractor” if that | |
| person only provides goods or supplies that are incidental to the performance of a contract by | |
| a person who has a contract subject to the Code. |
| 8) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
9) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $150,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.
10) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
11) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
12) Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.
13) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.
14) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 15) | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
16) Specified Materials Bids shall be based on providing all products/materials exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.
17) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.
18) Warranties The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date. See Section B. Project Instructions and Notes, for any extended warranties that may apply.
19) Change Orders Any change order authorized under this Section shall be made in writing. Any person employed by and authorized by any unit of State or local government to approve a change order to any public contract who knowingly grants that approval without first obtaining from the unit of State or local government on whose behalf the contract was signed, or from a designee authorized by that unit of State or local government, a determination in writing that (1) the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed, or (2) the change is germane to the original contract as signed, or (3) the change order is in the best interest of the unit of State or local government and authorized by law, commits a Class 4 felony. The written determination and the written change order resulting from that determination shall be preserved in the contract's file which shall be open to the public for inspection.
This Section shall only apply to a change order or series of change orders which authorize or necessitate an increase or decrease in either the cost of a public contract by a total of $25,000 or more or the time of completion by a total of 180 days or more. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed.
20) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.
21) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 22) | Contract Award |
| Contract award will be made to the lowest, responsible, responsive bidder. The Department of Natural Resources reserves the right to reject any or all bids. |
| 23) | Term of Contract |
| All work shall be completed by June 30, 2026 unless agreed to by both the Contractor and DNR, that a time extension is warranted. |
24) Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form to DNR.ENGBID@illinois.gov .
25) Project Contacts: The following individuals are listed as project contacts during the construction phase. The Bidder may not communicate directly with any of these individuals during the bidding process. All communication during the bidding phase must be directed to the DNR.ENGBID@illinois.gov email address.
| Project Architect/Engineer: | ||
| John Cronin | ||
| Illinois Department of Natural Resources |
One Natural Resources Way Springfield, IL 62702
| Phone: | 217 / 782 - 3484 | ||
| Fax: | 217 / 782 - 9599 | ||
| E-mail: | john.cronin@illinois.gov |
| Site Superintendent: | ||
| Robin Hinchee | ||
| Argyle Lake State Park |
640 Argyle Park Road Colchester, IL 62326
| Phone: | 309 / 776 - 3422 |
| E-mail: | robin.hinchee@illinois.gov |
| Billing: | ||||||
| Teresa Shores | ||||||
| Illinois Department of Natural Resources | Division of Architecture & Engineering | One Natural Resources Way | Springfield, IL 62702 | |||
| Phone: 217-785-9382 | ||||||
| Fax: | 217-782-9599 | |||||
| E-mail: teresa.shores@illinois.gov |
o:\ocdeng\engadm\projects\reg_1\fy26\1-26-021 argyle lake sp - replace two (2) 1000-gallon fuel tanks\procurement documents - bid\sow-nauvooofficemuseum-furnaces.docx
File details come from the government source that posted it. Updated .