J2_-_Plans_Chippewa_Campground_Electric_Soil_Boring.pdf
PDF 2 MB Posted
- Solicitation number
- 12569R19Q0034
About this file
Plans Chippewa
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J4_-__DB_Wage_Determination_WI20190015.pdf | ||
| RFQ_12569R19Q0034.docx | DOCX document | |
| J3_-_Plans_Namekagon_Campground_Electric_Soil_Boring_Phone_Service.pdf | ||
| J1_-_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Map data ©2018 Google 5000 ft
Chippewa Campground Gilman, WI 54433
Chippewa Campground
PROJECT SITE
T-01 COVER SHEET 03/21/2019
E-01 ELECTRICAL SITE PLAN AND DETAILS 03/21/2019
FOREST ENGINEER
DATE
DATE
DIRECTOR OF
ENGINEERING
DATE
FOREST SUPERVISOR
RO FACILITIES PROGRAM MANAGER DATETRAVEL DIRECTIONS:
TRAVEL NORTH FROM MEDFORD ON STATE HIGHWAY 13 FOR 4 MILES. TURN LEFT (WEST) ON COUNTY TRUNK HIGHWAY M FOR ABOUT 24 MILES, THEN TURN LEFT (SOUTH) ON FOREST ROAD 1417 FOR 1 MILE TO THE
CAMPGROUND ENTRANCE.
LAT: 45.22270
LONG: -90.69503
THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE TO 17
CAMPSITES.
THE ELECTRIC SERVICE WILL BE SUPPLIED BY A BURIED ELECTRICAL LINE FROM A
TRANSFORMER TO BE PROVIDED BY JUMP RIVER POWER CO-OP.
THE CONTRACTOR SHALL FURNISH ALL LABOR, TOOLS, AND EQUIPMENT NECESSARY FOR
THE PROPER EXECUTION OF THE WORK IN ACCORDANCE WITH LOCAL, STATE AND
NATIONAL CODES AND COMPLETE THE PROJECT IN AN ACCEPTABLE MANNER, READY
FOR USE, OCCUPANCY OR OPERATION BY THE OWNER.
THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS WITH THE DRAWING
DIMENSIONS. IF A CONFLICT IS FOUND OR IF FIELD CHANGES ARE MADE THAT DEVIATE
FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE IMMEDIATELY, PRIOR TO CONSTRUCTION OR THE ORDERING OF ANY
MATERIALS.
ALL LOCATIONS TO BE REVIEWED/APPROVED BY CONTRACTING OFFICER'S
REPRESENTATIVE.
% of Total % of Triplex wire Circuit Loop A Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 47 50 215 240 24200 350 MCM 0.0605 1.1% 1.1% Quadplex wire Site 47 Site 48 50 160 240 19400 350 MCM 0.0605 0.7% 1.7% Quadplex wire Site 48 Site 49 50 39 240 14600 350 MCM 0.0605 0.1% 1.9% Quadplex wire Site 49 Site 31 50 312 240 9600 350 MCM 0.0605 0.6% 2.5% Quadplex wire
% of Total % of Triplex wire
Circuit Loop B Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 45 50 207 240 29000 350 MCM 0.0605 1.3% 1.3% Quadplex wire Site 45 Site 44 50 98 240 24200 350 MCM 0.0605 0.5% 1.8% Quadplex wire Site 44 Site 43 50 287 240 19400 350 MCM 0.0605 1.2% 2.9% Quadplex wire Site 43 Site 42 50 102 240 14600 350 MCM 0.0605 0.3% 3.2% Quadplex wire Site 42 Site 41 50 117 240 9600 350 MCM 0.0605 0.2% 3.5% Quadplex wire
% of Total % of Triplex wire
Circuit Loop C Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 40 50 169 240 24200 350 MCM 0.0605 0.9% 0.9% Quadplex wire Site 40 Site 39 50 106 240 19400 350 MCM 0.0605 0.4% 1.3% Quadplex wire Site 39 Site 38 50 156 240 14600 350 MCM 0.0605 0.5% 1.8% Quadplex wire Site 38 Site 36 50 53 240 9600 350 MCM 0.0605 0.1% 1.9% Quadplex wire
% of Total % of Triplex wire
Circuit Loop D Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 33 50 298 240 38400 350 0.0605 2.4% 2.4% Quadplex wire Site 33 Site 32 50 103 240 28800 350 0.0605 0.6% 3.0% Quadplex wire Site 32 Site 35 50 173 240 19200 350 0.0605 0.7% 3.7% Quadplex wire Site 35 Site 37 50 82 240 9600 350 0.0605 0.2% 3.9% Quadplex wire
% of Total % of Triplex wire
Circuit Loop E Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 46 50 45 240 24200 350 MCM 0.0605 0.2% 0.2% Quadplex wire
ELECTRICAL SITE PLAN
AND DETAILS
E-01 002 002
SITE 32
SITE 31
SITE 33
SITE 35
SITE 36
SITE 37
SITE 38
SITE 40
SITE 39 SITE 41
SITE 42 SITE 43
SITE 44
SITE 45
SITE 47
SITE 48
SITE 49
ELECTRICAL TRENCH ROUTE
Scale: 1" = 100'-0"3
CHIPPEWA CAMPGROUND ROAD
NOTE:
PROPOSED ELECTRICAL UNDERGROUND
ROUTES. UNDERGROUND WIRING SHALL
BE INSTALLED AS SHOWN AT A MINIMUM
DEPTH OF 24 INCHES. CONTRACTOR
SHALL SUBMIT AN AS-BUILT PLAN OF THE
FINAL ELECTRICAL ROUTES.
ELECTRICAL
LOOP A
ELECTRICAL
LOOP B
ELECTRICAL
LOOP C
ELECTRICAL
LOOP D
SITE 46
HOST SITE
CONNECT EXISTING
ELECTRICAL PANEL TO
TRANSFORMER.
ELECTRICAL
LOOP E
SITE 32
SITE 31
SITE 33
SITE 35
SITE 36
SITE 37
SITE 38
SITE 40
SITE 39 SITE 41
SITE 42 SITE 43
SITE 44
SITE 45
SITE 47
SITE 48
SITE 49
ELECTRICAL CIRCUIT SCHEMATIC
Scale: 1" = 100'-0"2
CHIPPEWA CAMPGROUND ROAD
ELECTRICAL
LOOP A
ELECTRICAL
LOOP B
ELECTRICAL
LOOP C
ELECTRICAL
LOOP D
USE 350, 350, 4/0 ALUMINUM
WIRE TYPE URD DIRECT
BURIAL OR APPROVED
EQUAL.
SITE 46
HOST SITE
CONNECT EXISTING
ELECTRICAL PANEL TO
TRANSFORMER.
ELECTRICAL
LOOP E
ELECTRICAL PEDESTAL DETAIL4
SITE
DISTANCE FROM
EDGE OF ROAD
(FEET)
31 50' 32 50' 33 40' 35 50' 36 50' 37 50' 38 40' 39 40' 40 50' 41 50' 42 50' 43 50' 44 40' 45 40' 47 50' 48 85' 49 60'
PEDESTAL DISTANCES TABLE
FINISHED
GRADE
" M
IN
D
EP
TH
4"
4" TOPSOIL OR WISDOT
1-1/4" DENSE GRADED
BASE. MATCH EXISTING.
NATIVE OR EXISTING
BACKFILL
4" M
IN
" M
IN
NATIVE BACKFILL WITH
NO COBBLES AND
BOULDERS (>2"DIA.)
ELECTRICAL LINE
ELECTRICAL LINE TRENCH DETAIL
Scale: 1/2" = 1'-0"6
2'-0" MIN.
ELECTRICAL RISER DIAGRAM DETAIL5
600 AMP MAIN BREAKER /
DISCONNECT
NEW TRANSFORMER.
PROVIDE MIN. 216 KVA
TRANSFORMER.
REPLACE EXISTING
TRANSFORMER.
SITE BREAKER PANEL.
PROVIDE ONE 200 AMP
BREAKER / DISCONNECT
FOR EACH ELECTRICAL
LOOP.
PROPOSED ELECTRICAL SERVICE METER
TO BE INSTALLED BY JUMP RIVER POWER
CO-OP.
ELECTRIC
SUPPLY LINE
TO SITES
PROPOSED METER SOCKET.
CONTRACTOR TO PROVIDE
METER SOCKET.
ELECTRIC
SERVICE LINE
FIELD LOCATE NEW TRANSFORMER, METER AND CONTROL PANEL PER
POWER COMPANY AND CONTRACTING OFFICER'S REPRESENTATIVE
ELECTRICAL DESIGN NOTES
1. THE CONTRACTOR SHALL FURNISH ALL LABOR,
MATERIALS, TOOLS EQUIPMENT AND TRANSPORTATION
NECESSARY FOR THE PROPER EXECUTION OF THE WORK
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND
ALL INCIDENTAL WORK NECESSARY TO COMPLETE THE
PROJECT IN AN ACCEPTABLE MANNER, READY FOR USE,
OCCUPANCY OR OPERATION BY THE OWNER.
2. ALL ELECTRICAL WORK SHALL BE IN COMPLIANCE WITH
ALL NATIONAL, STATE AND LOCAL CODES, ORDINANCES.
ANY MODIFICATIONS AND/OR ADDITIONS TO THESE PLANS
REQUIRED FOR PROPER COMPLIANCE TO ANY APPLICABLE
CODES SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
3. ELECTRICAL WORK SHALL BE DONE BY A LICENSED
ELECTRICIAN WITH AN ELECTRICAL PERMIT AND
INSPECTION.
4. CONTRACTOR TO LOCATE EXISTING WATER, SEWER,
AND ELECTRICAL LINES AND ENSURE NO CONFLICTS WITH
PROPOSED ELECTRICAL LINES.
5. THE ELECTRICAL CONTRACTOR SHALL COORDINATE
UTILITY RUNS WITH OTHER TRADES.
6. FURNISH AND INSTALL WIRING, DEVICES, PANELS, AND
BREAKERS AS REQUIRED. WHERE AN ELECTRICAL DEVICE
AND/OR DISCONNECT IS REQUIRED BY CODE BUT NOT
SHOWN, IT SHALL BE FURNISHED AND INSTALLED BY THE
ELECTRICIAN.
7. THE ELECTRICAL CONTRACTOR SHALL INSTALL CIRCUIT
DIRECTORY WITH TYPED CIRCUIT DESIGNATION CARD ON
THE INSIDE OF EACH PANEL BOARD DOOR.
8. PEDESTALS ARE TO BE LOCATED ON RIGHT SIDE OF
EACH SITE AT A DISTANCE LISTED IN PEDESTAL
DISTANCES TABLE. CONTRACTING OFFICER'S
REPRESENTATIVE TO VERIFY/APPROVE PEDESTAL
LOCATION.
9. JUMP RIVER POWER CO-OP TO PROVIDE THE
TRANSFORMER, THE ELECTRICAL SERVICE LINE TO THE
METER SOCKET, AND THE ELECTRICAL SERVICE METERS.
10. SITE 34 DOES NOT EXIST.
11. JUMP RIVER POWER CO-OP CONTACT: KURT HARRIS
(715-532-5524)
12. PANEL MOUNTING BOARD SHALL BE CONSTRUCTED OF
TWO 4X4X10' GROUND CONTACT TREATED POSTS BURIED
48" BELOW GROUND AND 3/4" TREATED PLYWOOD BACKER.
FIELD LOCATE PER CONTRACT OFFICER'S
REPRESENTATIVE.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
(R9)
EASTERN REGION
CHIPPEWA
CAMPGROUND
IMPROVEMENTS
CHEQUAMEGON-NICOLET
NATIONAL FOREST
GREAT DIVIDE
RANGER DISTRICT
03/21/2019
CJM/JS
JS
CJM
190321
United States Department of Agriculture Forest Service
190321TH
E
O W
N
ER
A G
R
EE
S
TO
IN
D
EM
N
IF
Y
AN
D
H O
LD
M
O U
N
TA
IN
E
N G
IN
EE
R
IN
G , I
N C
. H
AR
M
LE
SS
F
R O
M A
N Y
D
AM
AG
E, L
IA
BI
LI
TY
O
R C
O
ST
, I N
C
LU
D
IN
G A
TT
O
R N
EY
'S
F
EE
S
AN
D C
O
ST
O F
D
EF
EN
SE
A R
IS
IN
G F
R O
M A
N Y
C H
AN
G
ES
O
R A
LT
ER
AT
IO
N S
M
AD
E
BY
A N
YO
N
E O
TH
ER
T H
AN
M
O U
N
TA
IN
E
N G
IN
EE
R
IN
G , I
N C
O
R F
R O
M A
N Y
R
EU
SE
O
F
TH
E D
R
AW
IN
G
S
AN
D D
AT
A
W
IT
H O
U T
TH
E
PR
IO
R W
R
IT
TE
N
C O
N
SE
N T
O F
M O
U N
TA
IN
E N
G
IN
EE
R
IN
G
, I N
C
D or al an d St re et
U ni ve rs ity A ve nu e, S ui te
Ki ng sf or d, M ic hi ga n
W illi st on
, N or th D ak ot a
Ph on e:
(9
) 7
-5
P ho ne
1)
-5
Fa x:
(9
) 7
-5
E m ai l:
m tn en gi ne er in g@ m tn en g.
ne t
M O
U N
TA
IN
E N
G
IN
EE
R
IN
G
, I N
C
SITE 32
SITE 31
SITE 33
SITE 35
SITE 36
SITE 37
SITE 38
SITE 40
SITE 39 SITE 41
SITE 42 SITE 43
SITE 44
SITE 45
SITE 47
SITE 48
SITE 49
SITE PLAN
Scale: 1" = 200'-0"1
EXISTING
TRANSFORMER
CHIPPEWA CAMPGROUND ROAD
mbeuning Typewritten Text 13.
mbeuning Typewritten Text
ELECTRICAL WIRING AT PAVED ROAD CROSSINGS SHALL BE DIRECTIONALLY BORED.
BORING IS ONLY REQUIRED IF ROAD HAS BEEN REPAVED WITHIN FIVE YEARS.
mbeuning Inserted Text mbeuning Typewritten Text
ELECTRICAL DESIGN NOTES CONTINUED
| Sht-1-Title Sheet / Drawing Index |
| Viewport-17 |
| Viewport-4 |
| Sht-2-Electrical |
| Viewport-8 |
| Viewport-9 |
| Viewport-1 |
| Viewport-2 |
| Viewport-6 |
| Viewport-7 |
| 2019-04-30T14:31:38-0500 | |
| MARK BEUNING |
File details come from the government source that posted it.