J2_-_Plans_Chippewa_Campground_Electric_Soil_Boring.pdf

PDF 2 MB Posted

Attached to
Chippewa and Namakagon Campground Electrical and Host Site Improvements
Solicitation number
12569R19Q0034
Issued by

About this file

Plans Chippewa

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Map data ©2018 Google 5000 ft

Chippewa Campground Gilman, WI 54433

Chippewa Campground

PROJECT SITE

T-01 COVER SHEET 03/21/2019

E-01 ELECTRICAL SITE PLAN AND DETAILS 03/21/2019

FOREST ENGINEER

DATE

DATE

DIRECTOR OF

ENGINEERING

DATE

FOREST SUPERVISOR

RO FACILITIES PROGRAM MANAGER DATETRAVEL DIRECTIONS:

TRAVEL NORTH FROM MEDFORD ON STATE HIGHWAY 13 FOR 4 MILES. TURN LEFT (WEST) ON COUNTY TRUNK HIGHWAY M FOR ABOUT 24 MILES, THEN TURN LEFT (SOUTH) ON FOREST ROAD 1417 FOR 1 MILE TO THE

CAMPGROUND ENTRANCE.

LAT: 45.22270

LONG: -90.69503

THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE TO 17

CAMPSITES.

THE ELECTRIC SERVICE WILL BE SUPPLIED BY A BURIED ELECTRICAL LINE FROM A

TRANSFORMER TO BE PROVIDED BY JUMP RIVER POWER CO-OP.

THE CONTRACTOR SHALL FURNISH ALL LABOR, TOOLS, AND EQUIPMENT NECESSARY FOR

THE PROPER EXECUTION OF THE WORK IN ACCORDANCE WITH LOCAL, STATE AND

NATIONAL CODES AND COMPLETE THE PROJECT IN AN ACCEPTABLE MANNER, READY

FOR USE, OCCUPANCY OR OPERATION BY THE OWNER.

THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS WITH THE DRAWING

DIMENSIONS. IF A CONFLICT IS FOUND OR IF FIELD CHANGES ARE MADE THAT DEVIATE

FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S

REPRESENTATIVE IMMEDIATELY, PRIOR TO CONSTRUCTION OR THE ORDERING OF ANY

MATERIALS.

ALL LOCATIONS TO BE REVIEWED/APPROVED BY CONTRACTING OFFICER'S

REPRESENTATIVE.

% of Total % of Triplex wire Circuit Loop A Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 47 50 215 240 24200 350 MCM 0.0605 1.1% 1.1% Quadplex wire Site 47 Site 48 50 160 240 19400 350 MCM 0.0605 0.7% 1.7% Quadplex wire Site 48 Site 49 50 39 240 14600 350 MCM 0.0605 0.1% 1.9% Quadplex wire Site 49 Site 31 50 312 240 9600 350 MCM 0.0605 0.6% 2.5% Quadplex wire

% of Total % of Triplex wire

Circuit Loop B Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 45 50 207 240 29000 350 MCM 0.0605 1.3% 1.3% Quadplex wire Site 45 Site 44 50 98 240 24200 350 MCM 0.0605 0.5% 1.8% Quadplex wire Site 44 Site 43 50 287 240 19400 350 MCM 0.0605 1.2% 2.9% Quadplex wire Site 43 Site 42 50 102 240 14600 350 MCM 0.0605 0.3% 3.2% Quadplex wire Site 42 Site 41 50 117 240 9600 350 MCM 0.0605 0.2% 3.5% Quadplex wire

% of Total % of Triplex wire

Circuit Loop C Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 40 50 169 240 24200 350 MCM 0.0605 0.9% 0.9% Quadplex wire Site 40 Site 39 50 106 240 19400 350 MCM 0.0605 0.4% 1.3% Quadplex wire Site 39 Site 38 50 156 240 14600 350 MCM 0.0605 0.5% 1.8% Quadplex wire Site 38 Site 36 50 53 240 9600 350 MCM 0.0605 0.1% 1.9% Quadplex wire

% of Total % of Triplex wire

Circuit Loop D Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 33 50 298 240 38400 350 0.0605 2.4% 2.4% Quadplex wire Site 33 Site 32 50 103 240 28800 350 0.0605 0.6% 3.0% Quadplex wire Site 32 Site 35 50 173 240 19200 350 0.0605 0.7% 3.7% Quadplex wire Site 35 Site 37 50 82 240 9600 350 0.0605 0.2% 3.9% Quadplex wire

% of Total % of Triplex wire

Circuit Loop E Voltage Voltage or From To Max. Amps Wire Length, ft Voltage Volt-amperes Wire Size Resistivity Drop Drop Quadplex wire Panel Site 46 50 45 240 24200 350 MCM 0.0605 0.2% 0.2% Quadplex wire

ELECTRICAL SITE PLAN

AND DETAILS

E-01 002 002

SITE 32

SITE 31

SITE 33

SITE 35

SITE 36

SITE 37

SITE 38

SITE 40

SITE 39 SITE 41

SITE 42 SITE 43

SITE 44

SITE 45

SITE 47

SITE 48

SITE 49

ELECTRICAL TRENCH ROUTE

Scale: 1" = 100'-0"3

CHIPPEWA CAMPGROUND ROAD

NOTE:

PROPOSED ELECTRICAL UNDERGROUND

ROUTES. UNDERGROUND WIRING SHALL

BE INSTALLED AS SHOWN AT A MINIMUM

DEPTH OF 24 INCHES. CONTRACTOR

SHALL SUBMIT AN AS-BUILT PLAN OF THE

FINAL ELECTRICAL ROUTES.

ELECTRICAL

LOOP A

ELECTRICAL

LOOP B

ELECTRICAL

LOOP C

ELECTRICAL

LOOP D

SITE 46

HOST SITE

CONNECT EXISTING

ELECTRICAL PANEL TO

TRANSFORMER.

ELECTRICAL

LOOP E

SITE 32

SITE 31

SITE 33

SITE 35

SITE 36

SITE 37

SITE 38

SITE 40

SITE 39 SITE 41

SITE 42 SITE 43

SITE 44

SITE 45

SITE 47

SITE 48

SITE 49

ELECTRICAL CIRCUIT SCHEMATIC

Scale: 1" = 100'-0"2

CHIPPEWA CAMPGROUND ROAD

ELECTRICAL

LOOP A

ELECTRICAL

LOOP B

ELECTRICAL

LOOP C

ELECTRICAL

LOOP D

USE 350, 350, 4/0 ALUMINUM

WIRE TYPE URD DIRECT

BURIAL OR APPROVED

EQUAL.

SITE 46

HOST SITE

CONNECT EXISTING

ELECTRICAL PANEL TO

TRANSFORMER.

ELECTRICAL

LOOP E

ELECTRICAL PEDESTAL DETAIL4

SITE

DISTANCE FROM

EDGE OF ROAD

(FEET)

31 50' 32 50' 33 40' 35 50' 36 50' 37 50' 38 40' 39 40' 40 50' 41 50' 42 50' 43 50' 44 40' 45 40' 47 50' 48 85' 49 60'

PEDESTAL DISTANCES TABLE

FINISHED

GRADE

" M

IN

D

EP

TH

4"

4" TOPSOIL OR WISDOT

1-1/4" DENSE GRADED

BASE. MATCH EXISTING.

NATIVE OR EXISTING

BACKFILL

4" M

IN

" M

IN

NATIVE BACKFILL WITH

NO COBBLES AND

BOULDERS (>2"DIA.)

ELECTRICAL LINE

ELECTRICAL LINE TRENCH DETAIL

Scale: 1/2" = 1'-0"6

2'-0" MIN.

ELECTRICAL RISER DIAGRAM DETAIL5

600 AMP MAIN BREAKER /

DISCONNECT

NEW TRANSFORMER.

PROVIDE MIN. 216 KVA

TRANSFORMER.

REPLACE EXISTING

TRANSFORMER.

SITE BREAKER PANEL.

PROVIDE ONE 200 AMP

BREAKER / DISCONNECT

FOR EACH ELECTRICAL

LOOP.

PROPOSED ELECTRICAL SERVICE METER

TO BE INSTALLED BY JUMP RIVER POWER

CO-OP.

ELECTRIC

SUPPLY LINE

TO SITES

PROPOSED METER SOCKET.

CONTRACTOR TO PROVIDE

METER SOCKET.

ELECTRIC

SERVICE LINE

FIELD LOCATE NEW TRANSFORMER, METER AND CONTROL PANEL PER

POWER COMPANY AND CONTRACTING OFFICER'S REPRESENTATIVE

ELECTRICAL DESIGN NOTES

1. THE CONTRACTOR SHALL FURNISH ALL LABOR,

MATERIALS, TOOLS EQUIPMENT AND TRANSPORTATION

NECESSARY FOR THE PROPER EXECUTION OF THE WORK

IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND

ALL INCIDENTAL WORK NECESSARY TO COMPLETE THE

PROJECT IN AN ACCEPTABLE MANNER, READY FOR USE,

OCCUPANCY OR OPERATION BY THE OWNER.

2. ALL ELECTRICAL WORK SHALL BE IN COMPLIANCE WITH

ALL NATIONAL, STATE AND LOCAL CODES, ORDINANCES.

ANY MODIFICATIONS AND/OR ADDITIONS TO THESE PLANS

REQUIRED FOR PROPER COMPLIANCE TO ANY APPLICABLE

CODES SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR.

3. ELECTRICAL WORK SHALL BE DONE BY A LICENSED

ELECTRICIAN WITH AN ELECTRICAL PERMIT AND

INSPECTION.

4. CONTRACTOR TO LOCATE EXISTING WATER, SEWER,

AND ELECTRICAL LINES AND ENSURE NO CONFLICTS WITH

PROPOSED ELECTRICAL LINES.

5. THE ELECTRICAL CONTRACTOR SHALL COORDINATE

UTILITY RUNS WITH OTHER TRADES.

6. FURNISH AND INSTALL WIRING, DEVICES, PANELS, AND

BREAKERS AS REQUIRED. WHERE AN ELECTRICAL DEVICE

AND/OR DISCONNECT IS REQUIRED BY CODE BUT NOT

SHOWN, IT SHALL BE FURNISHED AND INSTALLED BY THE

ELECTRICIAN.

7. THE ELECTRICAL CONTRACTOR SHALL INSTALL CIRCUIT

DIRECTORY WITH TYPED CIRCUIT DESIGNATION CARD ON

THE INSIDE OF EACH PANEL BOARD DOOR.

8. PEDESTALS ARE TO BE LOCATED ON RIGHT SIDE OF

EACH SITE AT A DISTANCE LISTED IN PEDESTAL

DISTANCES TABLE. CONTRACTING OFFICER'S

REPRESENTATIVE TO VERIFY/APPROVE PEDESTAL

LOCATION.

9. JUMP RIVER POWER CO-OP TO PROVIDE THE

TRANSFORMER, THE ELECTRICAL SERVICE LINE TO THE

METER SOCKET, AND THE ELECTRICAL SERVICE METERS.

10. SITE 34 DOES NOT EXIST.

11. JUMP RIVER POWER CO-OP CONTACT: KURT HARRIS

(715-532-5524)

12. PANEL MOUNTING BOARD SHALL BE CONSTRUCTED OF

TWO 4X4X10' GROUND CONTACT TREATED POSTS BURIED

48" BELOW GROUND AND 3/4" TREATED PLYWOOD BACKER.

FIELD LOCATE PER CONTRACT OFFICER'S

REPRESENTATIVE.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

(R9)

EASTERN REGION

CHIPPEWA

CAMPGROUND

IMPROVEMENTS

CHEQUAMEGON-NICOLET

NATIONAL FOREST

GREAT DIVIDE

RANGER DISTRICT

03/21/2019

CJM/JS

JS

CJM

190321

United States Department of Agriculture Forest Service

190321TH

E

O W

N

ER

A G

R

EE

S

TO

IN

D

EM

N

IF

Y

AN

D

H O

LD

M

O U

N

TA

IN

E

N G

IN

EE

R

IN

G , I

N C

. H

AR

M

LE

SS

F

R O

M A

N Y

D

AM

AG

E, L

IA

BI

LI

TY

O

R C

O

ST

, I N

C

LU

D

IN

G A

TT

O

R N

EY

'S

F

EE

S

AN

D C

O

ST

O F

D

EF

EN

SE

A R

IS

IN

G F

R O

M A

N Y

C H

AN

G

ES

O

R A

LT

ER

AT

IO

N S

M

AD

E

BY

A N

YO

N

E O

TH

ER

T H

AN

M

O U

N

TA

IN

E

N G

IN

EE

R

IN

G , I

N C

O

R F

R O

M A

N Y

R

EU

SE

O

F

TH

E D

R

AW

IN

G

S

AN

D D

AT

A

W

IT

H O

U T

TH

E

PR

IO

R W

R

IT

TE

N

C O

N

SE

N T

O F

M O

U N

TA

IN

E N

G

IN

EE

R

IN

G

, I N

C

D or al an d St re et

U ni ve rs ity A ve nu e, S ui te

Ki ng sf or d, M ic hi ga n

W illi st on

, N or th D ak ot a

Ph on e:

(9

) 7

-5

P ho ne

1)

-5

Fa x:

(9

) 7

-5

E m ai l:

m tn en gi ne er in g@ m tn en g.

ne t

M O

U N

TA

IN

E N

G

IN

EE

R

IN

G

, I N

C

SITE 32

SITE 31

SITE 33

SITE 35

SITE 36

SITE 37

SITE 38

SITE 40

SITE 39 SITE 41

SITE 42 SITE 43

SITE 44

SITE 45

SITE 47

SITE 48

SITE 49

SITE PLAN

Scale: 1" = 200'-0"1

EXISTING

TRANSFORMER

CHIPPEWA CAMPGROUND ROAD

mbeuning Typewritten Text 13.

mbeuning Typewritten Text

ELECTRICAL WIRING AT PAVED ROAD CROSSINGS SHALL BE DIRECTIONALLY BORED.

BORING IS ONLY REQUIRED IF ROAD HAS BEEN REPAVED WITHIN FIVE YEARS.

mbeuning Inserted Text mbeuning Typewritten Text

ELECTRICAL DESIGN NOTES CONTINUED

Sht-1-Title Sheet / Drawing Index
Viewport-17
Viewport-4
Sht-2-Electrical
Viewport-8
Viewport-9
Viewport-1
Viewport-2
Viewport-6
Viewport-7
2019-04-30T14:31:38-0500
MARK BEUNING

File details come from the government source that posted it.