TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 013300 – SUBMITTAL PROCEDURES

SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS

DIVISION 03 – CONCRETE

SECTION 033053 – CAST-IN-PLACE CONCRETE

DIVISION 22 – PLUMBING

SECTION 220500 – COMMON WORK RESULTS FOR PLUMBING

SECTION 221353 – HOLDING TANK SYSTEM

DIVISION 26 – ELECTRICAL

SECTION 260511 - REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

SECTION 262416 - PANELBOARDS

DIVISION 31 – EARTHWORK

SECTION 312000 - EARTHWORK

SECTION 316424 - BORING & JACKING

DIVISION 32 – EXTERIOR IMPROVEMENTS

SECTION 329024 – SEEDING

SECTION 329060 – PROTECTION OF EXISTING TREES

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Definitions.

B. Submittal procedures.

C. Construction progress schedules.

D. Proposed product list.

E. Product data.

F. Shop Drawings.

G. Samples.

H. Other submittals.

I. Design data.

J. Test reports.

K. Certificates.

L. Manufacturer's instructions.

M. Manufacturer's field reports.

N. Construction photographs.

O. Contractor review.

P. Architect/Engineer review.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect/Engineer's responsive action.

B. Informational Submittals: Written and graphic information and physical Samples that do not require Architect/Engineer's responsive action. Submittals may be rejected for not complying with requirements.

1.3 SUBMITTAL PROCEDURES

A. Transmit each submittal to government. Submittals shall be electronic unless samples are required.

B. Sequentially number transmittal forms. Mark revised submittals with original number and sequential alphabetic suffix.

C. Identify: Project, Contractor, Subcontractor and supplier, pertinent Drawing and detail number, and Specification Section number appropriate to submittal.

D. Apply Contractor's stamp, signed or initialed, certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is according to requirements of the Work and Contract Documents.

E. Schedule submittals to expedite Project, and submit electronic submittals via email as PDF electronic files.

Coordinate submission of related items.

1. File name shall be in the following format: ProjectName_001.Item-description.pdf

2. Subject line in email shall include the project name and description of the submittal.

F. For each submittal for review, allow ten days excluding delivery time to and from Contractor.

G. Identify variations in Contract Documents and product or system limitations that may be detrimental to successful performance of completed Work.

H. Allow space on submittals for Contractor and Architect/Engineer review stamps.

I. When revised for resubmission, identify changes made since previous submission.

J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements.

K. Submittals not requested will not be recognized nor processed.

L. Incomplete Submittals: Architect/Engineer will not review. Complete submittals for each item are required.

Delays resulting from incomplete submittals are not the responsibility of Architect/Engineer.

1.4 PROPOSED PRODUCT LIST

A. Submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.

B. For products specified only by reference standards, indicate manufacturer, trade name, model or catalog designation, and reference standards.

1.5 PRODUCT DATA

A. Product Data: Action Submittal: Submit to Architect/Engineer for review for assessing conformance with information given and design concept expressed in Contract Documents.

B. Submit number of copies Contractor requires, plus two copies Architect/Engineer will retain.

C. Submit electronic submittals via email as PDF electronic files.

D. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

E. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

F. After review, produce copies and distribute according to "Submittal Procedures" Article and for record documents described in Section 017000 - Execution and Closeout Requirements.

1.6 SHOP DRAWINGS

A. Shop Drawings: Action Submittal: Submit to Architect/Engineer for assessing conformance with information given and design concept expressed in Contract Documents.

B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

C. When required by individual Specification Sections, provide Shop Drawings signed and sealed by a professional Engineer responsible for designing components shown on Shop Drawings.

1. Include signed and sealed calculations to support design.

2. Submit Shop Drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction.

3. Make revisions and provide additional information when required by authorities having jurisdiction.

D. Submit electronic submittals via email as PDF electronic files.

E. After review, produce copies and distribute according to "Submittal Procedures" Article and for record documents described in Section 017000 - Execution and Closeout Requirements.

1.7 SAMPLES

A. Samples: Action Submittal: Submit to Architect/Engineer for assessing conformance with information given and design concept expressed in Contract Documents.

B. Samples for Selection as Specified in Product Sections:

1. Submit to Architect/Engineer for aesthetic, color, and finish selection.

2. Submit Samples of finishes, textures, and patterns for Architect/Engineer selection.

C. Submit Samples to illustrate functional and aesthetic characteristics of products, with integral parts and attachment devices. Coordinate Sample submittals for interfacing work.

D. Include identification on each Sample, with full Project information.

E. Submit number of Samples specified in individual Specification Sections; Architect/Engineer will retain two Samples.

F. Reviewed Samples that may be used in the Work are indicated in individual Specification Sections.

G. Samples will not be used for testing purposes unless specifically stated in Specification Section.

H. After review, produce copies and distribute according to "Submittal Procedures" Article and for record documents described in Section 017000 - Execution and Closeout Requirements.

1.8 OTHER SUBMITTALS

A. Closeout Submittals: Comply with Section 017000 - Execution and Closeout Requirements.

B. Informational Submittal: Submit data for Architect/Engineer's knowledge as Contract administrator or for Owner.

C. Submit information for assessing conformance with information given and design concept expressed in Contract Documents.

1.9 TEST REPORTS

A. Informational Submittal: Submit reports for Architect/Engineer's knowledge as Contract administrator or for Owner.

B. Submit test reports for information for assessing conformance with information given and design concept expressed in Contract Documents.

1.10 CERTIFICATES

A. Informational Submittal: Submit certification by manufacturer, installation/application Subcontractor, or Contractor to Architect/Engineer, in quantities specified for Product Data.

B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

C. Certificates may be recent or previous test results on material or product but must be acceptable to Architect/Engineer.

1.11 MANUFACTURER'S INSTRUCTIONS

A. Informational Submittal: Submit manufacturer's installation instructions for Architect/Engineer's knowledge as Contract administrator or for Owner.

B. Submit printed instructions for delivery, storage, assembly, installation, startup, adjusting, and finishing, to Architect/Engineer in quantities specified for Product Data.

C. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

1.12 MANUFACTURER'S FIELD REPORTS

A. Informational Submittal: Submit reports for Architect/Engineer's knowledge as Contract administrator or for Owner.

B. Submit report within three days of observation to Architect/Engineer for information.

C. Submit reports for information for assessing conformance with information given and design concept expressed in Contract Documents.

1.13 ERECTION DRAWINGS

A. Informational Submittal: Submit Drawings for Architect/Engineer's knowledge as Contract administrator or for Owner.

B. Submit Drawings for information assessing conformance with information given and design concept expressed in Contract Documents.

C. Data indicating inappropriate or unacceptable Work may be subject to action by Architect/Engineer or Owner.

1.14 CONSTRUCTION PHOTOGRAPHS

A. Provide photographs of Site and construction throughout progress of Work.

B. Submit photographs upon request to Architect and/or Owner.

C. Photographs: digitally produced, minimum 2dpi.

D. Take two Site photographs from different directions and five interior photographs of indicating relative progress of the Work.

1.15 CONTRACTOR REVIEW

A. Review for compliance with Contract Documents and approve submittals before transmitting to Architect/Engineer.

B. Contractor: Responsible for:

1. Determination and verification of materials including manufacturer's catalog numbers.

2. Determination and verification of quantities of materials.

3. Determination and verification of field measurements and field construction criteria.

4. Checking and coordinating information in submittal with requirements of Work and of Contract

Documents.

5. Determination of accuracy and completeness of dimensions and quantities.

6. Confirmation and coordination of dimensions and field conditions at Site.

7. Construction means, techniques, sequences, and procedures.

8. Safety precautions.

9. Coordination and performance of Work of all trades.

C. Stamp, sign or initial, and date each submittal to certify compliance with requirements of Contract Documents.

D. Do not fabricate products or begin Work for which submittals are required until approved submittals have been received from Architect/Engineer.

1.16 ARCHITECT/ENGINEER REVIEW

A. Do not make "mass submittals" to Architect/Engineer. "Mass submittals" are defined as six or more submittals or items in one day or 15 or more submittals or items in one week. If "mass submittals" are received, Architect/Engineer's review time stated above will be extended as necessary to perform proper review. Architect/Engineer will review "mass submittals" based on priority determined by Architect/Engineer after consultation with Owner and Contractor.

B. Informational submittals and other similar data are for Architect/Engineer's information, do not require Architect/Engineer's responsive action, and will not be reviewed or returned with comment.

C. Submittals made by Contractor that are not required by Contract Documents may be returned without action.

D. Submittal approval does not authorize changes to Contract requirements unless accompanied by Change Order or Construction Change Directive.

E. Owner may withhold monies due to Contractor to cover additional costs beyond the second submittal review.

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION - Not Used

END OF SECTION 013300

SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS

PART 4 - GENERAL

4.1 SECTION INCLUDES

A. Field engineering.

B. Closeout procedures.

C. Starting of systems.

D. Demonstration and instructions.

E. Testing, adjusting, and balancing.

F. Project record documents.

G. Operation and maintenance data.

H. Manual for materials and finishes.

I. Manual for equipment and systems.

J. Spare parts and maintenance products.

K. Product warranties and product bonds.

L. Maintenance service.

M. Examination.

N. Preparation.

O. Execution.

P. Cutting and patching.

Q. Protecting installed construction.

R. Final cleaning.

4.2 FIELD ENGINEERING

A. Employ land surveyor registered and acceptable to Architect/Engineer.

B. Control datum for survey is established by Owner-provided survey indicated on Drawings.

C. Prior to beginning Work, verify and establish floor elevations of existing facilities to ensure that new Work will meet existing elevations in smooth and level alignment except where specifically detailed or indicated otherwise.

D. Confirm Drawing dimensions and elevations.

E. Provide field engineering services. Establish elevations, lines, and levels using recognized engineering survey practices.

F. Maintain complete and accurate log of control and survey Work as Work progresses.

G. Protect survey control points prior to starting Site Work; preserve permanent reference points during construction.

H. Promptly report to Architect/Engineer loss or destruction of reference point or relocation required because of changes in grades or other reasons.

I. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to Architect/Engineer.

4.3 CLOSEOUT PROCEDURES

A. Prerequisites to Substantial Completion: Complete following items before requesting Certification of Substantial Completion, either for entire Work or for portions of Work:

1. Submit maintenance manuals, Project record documents, digital images of construction photographs, and other similar final record data in compliance with this Section.

2. Complete facility startup, testing, adjusting, balancing of systems and equipment, demonstrations, and instructions to Owner's operating and maintenance personnel as specified in compliance with this Section.

3. Conduct inspection to establish basis for request that Work is substantially complete. Create comprehensive list (initial punch list) indicating items to be completed or corrected, value of incomplete or nonconforming Work, reason for being incomplete, and date of anticipated completion for each item. Include copy of list with request for Certificate of Substantial Completion.

4. Obtain and submit releases enabling Owner's full, unrestricted use of Project and access to services and utilities. Include certificate of occupancy, operating certificates, and similar releases from authorities having jurisdiction and utility companies.

5. Deliver tools, spare parts, extra stocks of material, and similar physical items to Owner.

6. Make final change-over of locks eliminating construction master-key system and transmit keys directly to Owner. Advise Owner's personnel of change-over in security provisions.

7. Discontinue or change over and remove temporary facilities and services from Project Site, along with construction tools, mockups, and similar elements.

8. Perform final cleaning according to this Section.

B. Substantial Completion Inspection:

1. When Contractor considers Work to be substantially complete, submit to Architect/ Engineer:

a. Written certificate that Work, or designated portion, is substantially complete.

b. List of items to be completed or corrected (initial punch list).

2. Within seven days after receipt of request for Substantial Completion, Architect/Engineer and Owner will make inspection to determine whether Work or designated portion is substantially complete.

3. Should Architect/Engineer determine that Work is not substantially complete:

a. Architect/Engineer will promptly notify Contractor in writing, stating reasons for the opinion.

b. Contractor shall remedy deficiencies in Work and send second written request for Substantial

Completion to Architect/Engineer.

c. Architect/Engineer will re-inspect Work.

d. Redo and Inspection of Deficient Work: Repeated until Work passes Architect/ Engineer's inspection.

4. When Architect/Engineer finds that Work is substantially complete, Contracting Officer will notify contractor.

C. Prerequisites for Final Completion: Complete following items before requesting final acceptance and final payment.

1. When Contractor considers Work to be complete, submit written certification that:

a. Contract Documents have been reviewed.

b. Work has been examined for compliance with Contract Documents.

c. Work has been completed according to Contract Documents.

d. Work is completed and ready for final inspection.

2. Submittals: Submit following:

a. Final punch list indicating all items have been completed or corrected.

b. Final payment request with final releases and supporting documentation not previously submitted and accepted.

c. Specified warranties

3. Perform final cleaning for Contractor-soiled areas according to this Section.

D. Final Completion Inspection:

1. Within seven days after receipt of request for final inspection, Architect/Engineer will make inspection to determine whether Work or designated portion is complete.

2. Should Architect/Engineer consider Work to be incomplete or defective:

a. Architect/Engineer will promptly notify Contractor in writing, listing incomplete or defective Work.

b. Contractor shall remedy stated deficiencies and send second written request to Architect/Engineer that Work is complete.

c. Architect/Engineer will re-inspect Work.

d. Redo and Inspection of Deficient Work: Repeated until Work passes Architect/Engineer's inspection.

e. Cost of repeated inspections may be borne by the Contractor.

4.4 STARTING OF SYSTEMS

A. Coordinate schedule for startup of various equipment and systems.

B. Notify Architect/Engineer and Owner seven days prior to startup of each item.

C. Verify that each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, control sequence, and for conditions which may cause damage.

D. Verify that tests, meter readings, and electrical characteristics agree with those required by equipment or system manufacturer.

E. Verify that wiring and support components for equipment are complete and tested.

F. Execute startup under supervision of manufacturer's representative or Contractors' personnel according to manufacturer's instructions.

G. When specified in individual Specification Sections, require manufacturer to provide authorized representative who will be present at Site to inspect, check, and approve equipment or system installation prior to startup and will supervise placing equipment or system in operation.

H. Submit a written report according to Section 013300 - Submittal Procedures that equipment or system has been properly installed and is functioning correctly.

4.5 DEMONSTRATION AND INSTRUCTIONS

A. Demonstrate operation and maintenance of products to Owner's personnel one week prior to date of Substantial Completion.

B. Demonstrate Project equipment and instructed by authorized manufacturer's representative who is knowledgeable about the Project.

C. For equipment or systems requiring seasonal operation, perform demonstration for other season within six months.

D. Use operation and maintenance manuals as basis for instruction. Review contents of manual with Owner's personnel in detail to explain all aspects of operation and maintenance.

E. Demonstrate startup, operation, control, adjustment, troubleshooting, servicing, maintenance, and shutdown of each item of equipment at scheduled time, at equipment location.

F. Prepare and insert additional data in operations and maintenance manuals when need for additional data becomes apparent during instruction.

G. Required instruction time for each item of equipment and system is specified in individual Specification Sections.

4.6 TESTING, ADJUSTING, AND BALANCING

A. Contractor shall employ and pay for services of independent firm to perform testing, adjusting, and balancing.

B. Independent firm shall perform services specified in Section 230593 - Testing, Adjusting, and Balancing for

HVAC.

C. Reports shall be submitted by independent firm to Architect/Engineer indicating observations and results of tests and indicating compliance or noncompliance with requirements of Contract Documents.

4.7 PROJECT RECORD DOCUMENTS

A. Maintain on Site one set of the following record documents; record actual revisions to the Work:

1. Drawings.

2. Specifications.

3. Addenda.

4. Change Orders and other modifications to the Contract.

5. Reviewed Shop Drawings, product data, and Samples.

6. Manufacturer's instruction for assembly, installation, and adjusting.

B. Ensure entries are complete and accurate, enabling future reference by Owner.

C. Store record documents separate from documents used for construction.

D. Record information concurrent with construction progress, not less than weekly.

E. Specifications: Legibly mark and record, at each product Section, description of actual products installed, including the following:

1. Manufacturer's name and product model and number.

2. Product substitutions or alternates used.

3. Changes made by Addenda and modifications.

F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction as follows:

1. Include Contract modifications such as Addenda, supplementary instructions, change directives, field orders, minor changes in the Work, and change orders.

2. Include locations of concealed elements of the Work.

3. Identify depth of buried utility lines and provide dimensions showing distances from permanent facility components that are parallel to utilities.

4. Dimension ends, corners, and junctions of buried utilities to permanent facility components using triangulation.

5. Identify and locate existing buried or concealed items encountered during Project.

6. Measured depths of foundations in relation to finish floor datum.

7. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

8. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.

9. Field changes of dimension and detail.

10. Details not on original Drawings.

G. Submit marked-up paper copy documents to Architect/Engineer with claim for final Application for Payment.

H. Submit PDF electronic files of marked-up documents to Architect/Engineer within two weeks of Architect/Engineer’s acceptance.

4.8 OPERATION AND MAINTENANCE DATA

A. Submit in PDF composite electronic indexed file.

B. Submit data bound in 8-1/2 x 11-inch text pages, three D side ring binders with durable plastic covers.

C. Prepare binder cover with printed title "OPERATION AND MAINTENANCE," title of Project, and subject matter of binder when multiple binders are required.

D. Internally subdivide binder contents with permanent page dividers, logically organized as described below;

with tab titling clearly printed under reinforced laminated plastic tabs.

E. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.

F. Contents: Prepare table of contents for each volume, with each product or system description identified, typed on white paper, in three parts as follows:

1. Part 1: Directory, listing names, addresses, and telephone numbers of Architect/Engineer, Contractor, Subcontractors, and major equipment suppliers.

2. Part 2: Operation and maintenance instructions, arranged by system and subdivided by Specification Section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Include the following:

a. Significant design criteria.

b. List of equipment.

c. Parts list for each component.

d. Operating instructions.

e. Maintenance instructions for equipment and systems.

f. Maintenance instructions for finishes, including recommended cleaning methods and materials, and special precautions identifying detrimental agents.

g. Safety precautions to be taken when operating and maintaining or working near equipment.

3. Part 3: Project documents and certificates, including the following:

a. Shop Drawings and product data.

b. Air and water balance reports.

c. Certificates.

d. Originals of warranties and bonds.

4.9 MANUAL FOR MATERIALS AND FINISHES

A. Submit preliminary draft of proposed formats and outlines of contents before start of Work.

Architect/Engineer will review draft and return with comments.

B. For equipment or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance.

C. Submit one copy of completed volumes at Substantial Completion. Draft copy be reviewed and returned after Substantial Completion, with Architect/Engineer comments. Revise content of document sets as required prior to final submission.

D. Submit two sets of revised final volumes within ten days after final inspection.

E. Submit in PDF composite electronic indexed file of final manual within ten days after final inspection.

F. Building Products, Applied Materials, and Finishes: Include product data, with catalog number, size, composition, and color and texture designations. Include information for re-ordering products and components.

G. Instructions for Care and Maintenance: Include manufacturer's recommendations for cleaning agents and methods, precautions against detrimental agents and methods, and recommended schedule for cleaning and maintenance.

H. Moisture Protection and Weather Exposed Products: Include product data listing applicable reference standards, chemical composition, and details of installation. Include recommendations for inspections, maintenance, and repair.

I. Additional Requirements: As specified in individual product Specification Sections.

J. Include listing in table of contents for design data, with tabbed fly sheet and space for insertion of data.

4.10 MANUAL FOR EQUIPMENT AND SYSTEMS

A. Submit preliminary draft or proposed formats and outlines of contents before start of Work.

Architect/Engineer will review draft and return one copy with comments.

B. For equipment, or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance.

C. Submit one copy of completed volumes at Substantial Completion. Draft copy be reviewed and returned after Substantial Completion, with Architect/Engineer comments. Revise content of document sets as required prior to final submission.

D. Submit two sets of revised final volumes within ten days after final inspection.

E. Submit in PDF composite electronic indexed file of final manual within ten days after final inspection.

F. Each Item of Equipment and Each System: Include description of unit or system and component parts.

Identify function, normal operating characteristics, and limiting conditions. Include performance curves, with engineering data and tests, and complete nomenclature and model number of replaceable parts.

G. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and communications;

typed.

H. Include color-coded wiring diagrams as installed.

I. Operating Procedures: Include startup, break-in, and routine normal operating instructions and sequences.

Include regulation, control, stopping, shutdown, and emergency instructions. Include summer, winter, and special operating instructions.

J. Maintenance Requirements: Include routine procedures and guide for preventative maintenance and troubleshooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions.

K. Include servicing and lubrication schedule and list of lubricants required.

L. Include manufacturer's printed operation and maintenance instructions.

M. Include sequence of operation by controls manufacturer.

N. Include original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance.

O. Include control diagrams by controls manufacturer as installed.

P. Include Contractor's coordination drawings with color-coded piping diagrams as installed.

Q. Include charts of valve tag numbers, with location and function of each valve, keyed to flow and control diagrams.

R. Include list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage.

S. Include test and balancing reports as specified in Section 014000 - Quality Requirements.

T. Additional Requirements: As specified in individual product Specification Sections.

U. Include listing in table of contents for design data with tabbed dividers and space for insertion of data.

4.11 SPARE PARTS AND MAINTENANCE PRODUCTS

A. Furnish spare parts, maintenance, and extra products in quantities specified in individual Specification Sections.

B. Deliver to Project Site and place in location as directed by Owner; obtain receipt prior to final payment.

4.12 PRODUCT WARRANTIES AND PRODUCT BONDS

A. Obtain warranties and bonds executed in duplicate by responsible Subcontractors, suppliers, and manufacturers within ten days after completion of applicable item of Work.

B. Execute and assemble transferable warranty documents and bonds from Subcontractors, suppliers, and manufacturers.

C. Verify documents are in proper form, contain full information, and are notarized.

D. Co-execute submittals when required.

E. Include table of contents and assemble behind last tab of O&M binder.

F. Submit prior to final Application for Payment.

G. Time of Submittals:

1. For equipment or component parts of equipment put into service during construction with Owner's permission, submit documents within ten days after acceptance.

2. Make other submittals within ten days after date of Substantial Completion, prior to final Application for Payment.

3. For items of Work for which acceptance is delayed beyond Substantial Completion, submit within ten days after acceptance, listing date of acceptance as beginning of warranty or bond period.

PART 5 - PRODUCTS - Not Used

PART 6 - EXECUTION

6.1 EXAMINATION

A. Verify that existing Site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new Work being applied or attached.

C. Examine and verify specific conditions described in individual Specification Sections.

D. Verify that utility services are available with correct characteristics and in correct locations.

6.2 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance according to manufacturer's instructions.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer-required or -recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond.

6.3 EXECUTION

A. Comply with manufacturer's installation instructions, performing each step in sequence. Maintain one set of manufacturer's installation instructions at Project Site during installation and until completion of construction.

B. When manufacturer's installation instructions conflict with Contract Documents, request clarification from Architect/Engineer before proceeding.

C. Verify that field measurements are as indicated on approved Shop Drawings or as instructed by manufacturer.

D. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.

1. Secure Work true to line and level and within specified tolerances, or if not specified, industry-recognized tolerances.

2. Physically separate products in place, provide electrical insulation, or provide protective coatings to prevent galvanic action or corrosion between dissimilar metals.

3. Exposed Joints: Provide uniform joint width and arrange to obtain best visual effect. Refer questionable visual-effect choices to Architect/Engineer for final decision.

E. Allow for expansion of materials and building movement.

F. Climatic Conditions and Project Status: Install each unit of Work under conditions to ensure best possible results in coordination with entire Project.

1. Isolate each unit of Work from incompatible Work as necessary to prevent deterioration.

2. Coordinate enclosure of Work with required inspections and tests to minimize necessity of uncovering Work for those purposes.

G. Mounting Heights: Where not indicated, mount individual units of Work at industry recognized standard mounting heights for particular application indicated.

1. Refer questionable mounting heights choices to Architect/Engineer for final decision.

2. Elements Identified as Accessible to Handicapped: Comply with applicable codes and regulations.

H. Adjust operating products and equipment to ensure smooth and unhindered operation.

I. Clean and perform maintenance on installed Work as frequently as necessary through remainder of construction period. Lubricate operable components as recommended by manufacturer.

6.4 CUTTING AND PATCHING

A. Employ skilled and experienced installers to perform cutting and patching.

B. Submit written request in advance of cutting or altering elements affecting:

1. Structural integrity of element.

2. Integrity of weather-exposed or moisture-resistant elements.

3. Efficiency, maintenance, or safety of element.

4. Visual qualities of sight-exposed elements.

5. Work of Owner or separate contractor.

C. Execute cutting, fitting, and patching including excavation and fill to complete Work and to:

1. Fit the several parts together, to integrate with other Work.

2. Uncover Work to install or correct ill-timed Work.

3. Remove and replace defective and nonconforming Work.

4. Remove samples of installed Work for testing.

5. Provide openings in elements of Work for penetrations of mechanical and electrical Work.

D. Execute Work by methods to avoid damage to other Work and to provide proper surfaces to receive patching and finishing.

E. Cut masonry and concrete materials using masonry saw or core drill.

F. Restore Work with new products according to requirements of Contract Documents.

G. Fit Work tight to pipes, sleeves, ducts, conduits, and other penetrations through surfaces.

H. Maintain integrity of wall, ceiling, or floor construction; completely seal voids.

I. At penetrations of fire-rated walls, partitions, ceiling, or floor construction, completely seal voids with fire-rated material according to Section 078400 - Firestopping, to full thickness of penetrated element.

J. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for assembly, refinish entire unit.

K. Identify hazardous substances or conditions exposed during the Work to Architect/Engineer for decision or remedy.

6.5 PROTECTING INSTALLED CONSTRUCTION

A. Protect installed Work and provide special protection where specified in individual Specification Sections.

B. Provide temporary and removable protection for installed products. Control activity in immediate Work area to prevent damage.

C. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.

D. Use durable sheet materials to protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects.

E. Prohibit traffic or storage upon waterproofed or roofed surfaces. When traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.

F. Prohibit traffic from landscaped areas.

6.6 FINAL CLEANING

A. Execute final cleaning prior to final Project assessment.

1. Employ professional cleaning firm experienced with commercial construction projects.

B. Clean interior and exterior glass and surfaces exposed to view; remove temporary labels, stains, and foreign substances; polish transparent and glossy surfaces; and vacuum carpeted and soft surfaces.

C. Clean equipment and fixtures to sanitary condition with appropriate cleaning materials.

D. Replace filters of operating equipment.

E. Clean debris from roofs, gutters, downspouts, and drainage systems.

F. Clean Site; sweep paved areas, rake clean landscaped surfaces.

G. Remove waste and surplus materials, rubbish, and construction facilities from Site.

END OF SECTION 017000

DIVISION 03 – CONCRETE

SECTION 033053 – CAST-IN-PLACE CONCRETE

Cast-In-Place Concrete 033053-3

SECTION 033053

CAST-IN-PLACE CONCRETE

1.1 SUMMARY

A. Section Includes:

1. Cast-in-place structural concrete.

2. Slab on grade.

3. Footings.

4. Equipment pads.

5. Preparation of existing surfaces to receive concrete.

6. Preparation of existing surface to received concrete topping.

1.2 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this Section.

B. American Concrete Institute (ACI):

1. 117-15 - Tolerances for Concrete Construction, Materials and

Commentary.

2. 117M-10(R2015) - Tolerances for Concrete Construction, Materials and Commentary.

3. 211.1-91(R2009) - Proportions for Normal, Heavyweight, and Mass

Concrete.

4. 211.2-98(R2004) - Selecting Proportions for Structural Lightweight

Concrete.

5. 301/310M-10 - Structural Concrete.

6. 305.1-14 - Hot Weather Concreting.

7. 306.1-90(R2002) - Cold Weather Concreting.

8. 318/318M-14 - Building Code Requirements for Structural Concrete and SP-66-04-ACI Detailing Manual.

9. 347-04 - Guide to Formwork for Concrete.

Cast-In-Place Concrete 033053-4

C. ASTM International(ASTM):

1. A615/A615M-15ae1 - Deformed and Plain Carbon-Steel Bars for

Concrete Reinforcement.

2. A1064/A1064M-15 - Carbon-Steel Wire and Welded Wire

Reinforcement, Plain and Deformed, for Concrete.

3. C33/C33M-13 - Concrete Aggregates.

4. C94/C94M-15a - Ready-Mixed Concrete.

5. C150/C150M-15 - Portland Cement.

6. C171-07 - Sheet Material for Curing Concrete.

7. C260/C260M-10a - Air-Entraining Admixtures for Concrete.

8. C494/C494M-15 - Chemical Admixtures for Concrete.

9. C618-15 - Coal Fly Ash and Raw or Calcined Natural Pozzolan for

Use in Concrete.

10. C989/C989M-14 - Slag Cement for Use in Concrete and Mortars.

11. C1240-15 - Silica Fume Used in Cementitious Mixtures.

1.3 SUBMITTALS

A. Certificates: Certify products comply with specifications.

a. Each ready-mix concrete batch delivered to site.

1.4 DELIVERY

A. Deliver each ready-mixed concrete batch with mix certification in duplicate according to ASTM C94/C94M.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Portland Cement: ASTM C150/C150M, Type I or II.

B. Coarse Aggregate: ASTM C33/C33M.

1. Size 467 for footings and walls over 300 mm (12 inches) thick.

2. Size 7 for coarse aggregate for applied topping and metal pan stair fill.

3. Size 67 for other applications.

C. Fine Aggregate: ASTM C33/C33M.

D. Mixing Water: Fresh, clean, and potable.

Cast-In-Place Concrete 033053-5

E. Air-Entraining Admixture: ASTM C260/C260M.

F. Chemical Admixtures: ASTM C494/C494M.

G. Vapor Barrier: ASTM E1745, Class A with a minimum puncture resistance of 2200 g (3000 lbs.); minimum 0.38 mm (15 mil) thick.

H. Reinforcing Steel: ASTM A615/A615M or ASTM A996/A996M, deformed.

See Structural Drawings for grade.

I. Forms: Wood, plywood, metal, or other materials, approved by

Contracting Officer, of grade or type suitable to obtain type of finish specified.

1. Plywood: Exterior grade, free of defects and patches on contact surface.

2. Lumber: Sound, grade-marked, S4S stress graded softwood.

3. Form coating: As recommended by Contractor.

J. Welded Wire Fabric: ASTM A1064/A1064M, plain; Grade 65; sized as indicated.

K. Sheet Materials for Curing Concrete: ASTM C171.

2.2 CONCRETE MIXES

A. Design concrete mixes according to ASTM C94/C94M, Option C.

B. Compressive strength at 28 days: minimum 3,000 psi.

C. Maximum Slump for Vibrated Concrete: 4 inches tested according to

ASTM C143.

D. Cement and Water Factor (See Table I):

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete: Strength Non-Air-Entrained Air-Entrained Min. 28 Day Comp.

Str.

psi

Min. Cement lbs./cu. yd.

Max. Water Cement Ratio

Min.

Cement lbs./cu. yd.

Max. Water Cement Ratio

5000 1,3 630 0.45 650 0.40 4000 1,3 550 0.55 570 0.50 3000 1,3 470 0.65 490 0.55 3000 1,2 500 * 520 *

Cast-In-Place Concrete 033053-6

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete: Strength Non-Air-Entrained Air-Entrained Min. 28 Day Comp.

Str.

psi

Min. Cement lbs./cu. yd.

Max. Water Cement Ratio

Min.

Cement lbs./cu. yd.

Max. Water Cement Ratio

Footnotes:

1. If trial mixes are used, achieve a compressive strength 1,200 psi in excess of f'c.

For concrete strengths greater than 5,000 psi, achieve a compressive strength 1,400 psi in excess of f’c.

2. Lightweight Structural Concrete: Pump mixes may require higher cement values as specified in ACI 318/318M.

3. For Concrete Exposed to High Sulfate Content Soils: Maximum water cement ratio is 0.44.

* Laboratory Determined according to ACI 211.1 for normal weight concrete or ACI 211.2 for lightweight structural concrete.

E. Air-entrainment as specified, and conform with the following for air content table:

TABLE II - TOTAL AIR CONTENT

FOR VARIOUS SIZES OF COARSE AGGREGATES

Nominal Maximum Size of Coarse Aggregate

Total Air Content, percent

3/8 inches 6 Moderate exposure; 7.5 severe exposure

1/2 inches 5.5 Moderate exposure; 7 severe exposure

3/4 inches 5 Moderate exposure; 6 severe exposure 1 inch 4.5 Moderate exposure; 6 severe exposure 1 1/2 inches 4.5 Moderate exposure; 5.5 severe exposure

2.3 BATCHING AND MIXING

A. Store, batch, and mix materials according to ASTM C94/C94M.

1. Job-Mixed: Batch mix concrete in stationary mixers as specified in

ASTM C94/C94M.

2. Ready-Mixed Concrete: Comply with ASTM C94/C94M, except use of non-agitating equipment for transporting concrete to Site is not acceptable.

Cast-In-Place Concrete 033053-7

3. When aggregate producer's instructions deviate from specifications, submit proposed resolution for Contracting Officer’s Representative

(COR) consideration.

PART 3 - EXECUTION

3.1 FORMWORK

A. Installation: Conform to ACI 347. Construct forms to obtain concrete of the shapes, dimensions and profiles indicated, with tight joints.

B. Design and construct forms to prevent bowing-out of forms between supports and to be removable without prying against or otherwise damaging fresh concrete.

C. When patching formed concrete, seal form edges against existing surface to prevent leakage; set forms so that patch is flush with adjacent surfaces.

D. Treating and Wetting: Treat or wet concrete contact surfaces:

1. Coat plywood and lumber forms with non-staining form sealer.

2. Wet wood forms thoroughly when they are not treated with form release agent.

3. Prevent water from accumulating and remaining within forms.

4. Clean and coat removable metal forms with light form oil before reinforcement is placed.

5. In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.

6. Prevent water from accumulating and remaining within forms.

E. Inserts, Sleeves, and Similar Items: Install flashing reglets, masonry ties, anchors, inserts, wires, hangers, sleeves, boxes for floor hinges, and other cast-in items specified in other Sections. Place where indicated, square, flush and secured to formwork.

F. Construction Tolerances - General: Install and maintain concrete formwork to assure completion of work within specified tolerances.

G. Adjust or replace completed work exceeding specified tolerances before placing concrete.

Cast-In-Place Concrete 033053-8

3.2 REINFORCEMENT

A. Install concrete reinforcement according to ACI 318 and ACI SP-66.

B. Support and securely tie reinforcing steel to prevent displacement during placing of concrete.

C. Drilling for Dowels in Existing Concrete: Use sharp bits, drill hole slightly oversize, fill with epoxy grout, inset the dowel, and remove excess epoxy.

3.3 VAPOR BARRIER

A. Except where membrane waterproofing is required, place interior concrete slabs on a continuous vapor barrier.

B. Lap joints 150 mm (6 inches) and seal with a compatible pressure-sensitive tape.

C. Patch punctures and tears.

3.4 PLACING CONCRETE

A. Remove water from excavations before concrete is placed. Remove hardened concrete, debris and other foreign materials from interior of forms, and from inside of mixing and conveying equipment. Obtain approval from COR before placing concrete.

B. Install screeds at required elevations for concrete slabs.

C. Roughen and clean free from laitance, foreign matter, and loose particles before placing new concrete on existing concrete.

1. Blow-out areas with compressed air and immediately coat contact areas with adhesive in compliance with manufacturer's instructions.

D. Place structural concrete according to ACI 301 and ACI 318.

E. Convey concrete from mixer to final place of deposit by method that will prevent segregation or loss of ingredients. Do not deposit, in Work, concrete that has attained its initial set or has contained its water or cement more than 1 1/2 hours. Do not allow concrete to drop freely more than 1500 mm (5 feet) in unexposed work nor more than 900 mm (3 feet) in exposed work.

F. Place and consolidate concrete in horizontal layers not exceeding

12 inches in thickness. Consolidate concrete by spading, rodding, and

Cast-In-Place Concrete 033053-9 mechanical vibrator. Do not secure vibrator to forms or reinforcement.

Continuously vibrate during placement of concrete.

G. Hot Weather Concrete Placement: As recommended by ACI 305.1 to prevent adversely affecting properties and serviceability of hardened concrete.

H. Cold Weather Concrete Placement: As recommended by ACI 306.1, to prevent freezing of thin sections less than 12 inches and to permit concrete to gain strength properly.

1. Do not use calcium chloride without written approval from COR.

3.5 TOLERANCES

A. Slab on Grade Finish Tolerance: Comply with ACI 117, FF-number and

FL-number method.

1. Paragraph 4.8.3, Class A 1/8 inches for offset in form-work.

2. Table R4.8.4, "Flat" 1/4 inch in 10 feet for slabs.

3.6 PROTECTION AND CURING

A. Protect exposed surfaces of concrete from premature drying, wash by rain or running water, wind, mechanical damage, and excessive hot or cold temperatures.

B. Curing Methods: Cure concrete with curing compound using wet method with sheets.

C. Formed Concrete Curing: Wet the tops and exposed portions of formed concrete and keep moist until forms are removed.

1. If forms are removed before 14 days after concrete is cast, install sheet curing materials as specified above.

D. Concrete Flatwork Curing:

1. Install sheet materials according to the manufacturer's instructions.

a. When manufacturer's instructions deviate from specifications, submit proposed resolution for COR consideration.

Cast-In-Place Concrete 033053-10

3.7 FORM REMOVAL

A. Maintain forms in place until concrete is self-supporting, with construction operation loads.

B. Remove fins, laitance and loose material from concrete surfaces when forms are removed. Repair honeycombs, rock pockets, sand runs, spalls, or otherwise damaged surfaces by patching with the same mix as concrete minus the coarse aggregates.

C. Finish to match adjacent surfaces.

3.8 FINISHES

A. Slab Finishes:

1. Allow bleed water to evaporate before surface is finished. Do not sprinkle dry cement on surface to absorb water.

2. Broom Finish: Finish exterior slabs, ramps, and stair treads with bristle brush moistened with clear water after surfaces have been floated.

3. Finished Slab Flatness (FF) and Levelness (FL):

a. Slab on Grade: Specified overall value FF 25/FL 20. Minimum local value FF 17/FL 15.

b. Test flatness and levelness according to ASTM E1155.

- - E N D OF SECTION - -

DIVISION 22 – PLUMBING

SECTION 220500 – COMMON WORK RESULTS FOR PLUMBING

SECTION 221353 – HOLDING TANK SYSTEM

Common Work Results for Plumbing 220500-12

SECTION 220500

COMMON WORK RESULTS FOR PLUMBING

1.1 DESCRIPTION

A. The requirements of this Section shall apply to all sections of Division 22.

B. Abbreviations/Acronyms:

1. ABS: Acrylonitrile Butadiene Styrene

2. AISI: American Iron and Steel Institute

3. AWG: American Wire Gauge

4. COR: Contracting Officer’s Representative

5. CPVC: Chlorinated Polyvinyl Chloride

6. CWP: Cold Working Pressure

7. DN: Diameter Nominal

8. DWV: Drainage, Waste and Vent

9. EPDM: Ethylene Propylene Diene Monomer

10. EPT: Ethylene Propylene Terpolymer

11. FNPT: Female National Pipe Thread

12. GPM: Gallons Per Minute

13. HDPE: High Density Polyethylene

14. ID: Inside Diameter

15. IPS: Iron Pipe Size

16. lb: Pound

17. MAWP: Maximum Allowable Working Pressure

18. MAX: Maximum

19. MFG: Manufacturer

20. NPTF: National Pipe Thread Female

21. NPS: Nominal Pipe Size

22. NPT: Nominal Pipe Thread

23. OD: Outside Diameter

24. PP: Polypropylene

Common Work Results for Plumbing 220500-13

25. PPM: Parts per Million

26. PSIG: Pounds per Square Inch

27. PTFE: Polytetrafluoroethylene

28. PVC: Polyvinyl Chloride

29. PVDF: Polyvinylidene Fluoride

30. SPEC: Specification

31. STD: Standard

32. TFE: Tetrafluoroethylene

33. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire

34. THWN: Thermoplastic Heat & Water-Resistant Nylon Coated Wire

35. T/P: Temperature and Pressure

1.2 APPLICABLE PUBLICATIONS

A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Society for Testing and Materials (ASTM):

F1760-01(R2011) .............. Standard Specification for Coextruded Poly

(Vinyl Chloride) (PVC) Non-Pressure Plastic

Pipe Having Reprocessed-Recycled Content

D2737 - 12 .......................... Standard Specification for Polyethylene Pipe

(HDPE)

C. International Code Council, (ICC):

IBC-2015 ........................... International Building Code

IPC-2015 ........................... International Plumbing Code

D. Manufacturers Standardization Society (MSS) of the Valve and Fittings

Industry, Inc:

E. National Fire Protection Association (NFPA):

70-2014 ............................. National Electrical Code (NEC)

Common Work Results for Plumbing 220500-14

F. NSF International (NSF):

14-2012 ............................. Plastic Piping System Components and

Related Materials

G. American Water Works Association (AWWA):

C901-17 ............................ Polyethylene (PE) Pressure Pipe and Tubing ¾

in. Through 3 in., for Water Service

M55 ................................... Manual for the Design and Installation of

Polyethylene Pipe in Water Applications

1.3 QUALITY ASSURANCE

A. Products Criteria:

1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture,…