Forest Service Supplemental Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_12569R18Q0024_Amd_0001.pdf | ||
| General_Decision_Number_WI180010_01-05-2018_WI10.pdf | ||
| Schedule_of_Items.pdf | ||
| ConstructionRFQ_FAC97_01242018.pdf | ||
| Bridge_Quantity_Breakdown.pdf | ||
| ConstructionRFQ_FAC97_01242018.rtf | RTF text file | |
| Location_Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Service Supplemental Specifications 2018 CNNF Pavement Preservation
Great Divide, Medford-Park Falls, Eagle River-Florence, and Lakewood-Laona Ranger Districts Chequamegon-Nicolet National Forest
Bayfield, Sawyer, Ashland, Price, Florence and Forest Counties, Wisconsin
Table of Contents
Preface
101 - Terms¸ Format¸ and Definitions
102 - Bid¸ Award¸ and Execution of Contract
103 - Scope of Work
104 - Control of Work
106 - Acceptance of Work
107 - Legal Relations and Responsibility to the Public
108 - Prosecution and Progress
109 - Measurement and Payment
155 - Schedules for Construction Contracts
156 - Public Traffic
407 - Chip Seal
414 — ASPHALT PAVEMENT CRACK SEALING AND FILLING
Preface Preface_wo_03_28_2018
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
101 - Terms¸ Format¸ and Definitions 101.01_National_9_15_2016
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_4_7_2015
Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSAR — Forest Service Acquisition Regulations
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
MP — milepost location ppm — parts per million volume
STA station location
101.04_National_10_23_2016
Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid¸ Award¸ and Execution of Contract 102.00_National_9_15_2016
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_9_15_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05 and add the following.
Contractor shall furnish all equipment, labor, supplies, and misc. materials necessary to perform bridge pavement crack sealing and campground road chip sealing in accordance with the schedule, specifications, and contract clauses/provisions contained herein.
104 - Control of Work 104.00_National_9_15_2016
Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_9_16_2016
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
106 - Acceptance of Work 106.01_National_7_18_2017
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.
The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;
providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_10_23_2016
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017
Delete Subsection 107.05.
Delete Subsection 107.05.
108 - Prosecution and Progress 108.00_National_9_16_2016
Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment 109.00_National_9_16_2016
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.02_National_9_16_2016
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
155 - Schedules for Construction Contracts 155.00_National_9_14_2016
Delete Section 155 in its entirety and replace with the following:
All work shall be completed between May 15th and October 15th. Contractor shall closely coordinate work schedule with CO and campground hosts. Notify CO a minimum of 21 calendar days before work is to start in campgrounds.
156 - Public Traffic 156.00_National_9_14_2016
Delete Section 156 in its entirety and replace with the following:
Section 156. – PUBLIC TRAFIC Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Permanent Traffic Control 633
Traffic Signing and Marking Material 718
Concrete Barriers and Precast Guardwalls 618
Temporary plastic fence 710.11
Construction Requirements
156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays at bridges may not exceed 30 minutes at any one time followed by an open period of no less than 5 minutes. Campground closures shall be closely coordinated with the CO and campground host to ensure as little disturbance to campers as possible. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).
Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1 Temporary Road Closures
Road Number
From Terminus
To Terminus
Maximum Consecutive Days of Closure
Minimum Consecutive Days Open
NA NA NA NA NA
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See Subsection 109.05.
407 - Chip Seal 407.01_National_7_18_2017
Delete the first sentence of Subsection 407.01 and replace with the following:
407.01 Description.
407.01 This work consists of applying a single, double, or triple course chip seal with emulsified asphalt.
Equivalent material conforming to WisDOT Highway and Structure Specification 475 may be substituted with prior CO approval.
407.07_National_5_17_2017
Delete Subsection 407.07 (b) and (e) replace with the following:
407.07 Weather Limitations.
(b) Surface temperature in the shade is 60 °F (16 °C) and rising.
(e) Rain or temperatures below 40 °F (4 °C) are not forecast or anticipated for at least 24 hours after application;
407.08_National_5_17_2017
Delete the second paragraph of Subsection 407.08 and replace with the following:
407.08 Production Start-Up Procedures.
On the first day of placement of each surface treatment layer, or whenever there is a change in the surface texture or aggregate gradation, construct a 500-foot control strip that is one-lane wide.
Construct the control strip using material, lay-down, and compaction procedures intended for the remainder of the surface treatment according to subsection 407.09 and 407.10. Cease production after construction of the control strip until the material and the control strip are evaluated and accepted.
407.09_National_5_17_2017
Add the following to Subsection 407.09:
407.09 Asphalt Application.
On existing aggregate surfaces, prime the surface according to Section 411. Allow the primed surface to cure at least 5 days for cutback asphalt or 24 hours for asphalt emulsions. Ensure that the primed surface is dry for surface treatments using asphalt binder or slightly damp for surface treatments using emulsified asphalt.
407.11_National_5_17_2017
Delete Table 407-1 and replace with the following:
407.11 Placing and Finishing. Table 407-1.
Table 407-1 Approximate Quantities of Material for
Single-Course Chip Seal
D es ig na tio n Nominal
Maximum Size of Aggregate
Aggregate Gradation (1)
Estimated Quantity of Aggregate (2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of Asphalt Binder (3) gallons/yd2
1A 3/4 inch B 40 – 49 0.40 – 0.55 0.27 – 0.38 1B 1/2 inch C 26 – 29 0.31 – 0.44 0.20 – 0.31 1C 3/8 inch D 20 – 26 0.20 – 0.35 0.13 – 0.24 1D No. 4 E 15 – 20 0.15 – 0.22 0.11 – 0.18
(1) See Table 703-7 for aggregate gradations.
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.
(3) Adjust the asphalt content for the condition of the road.
407.12_National_5_17_2017
Rename Subsection 407.12
407.12 Double and Triple Course Chip Seal.
Delete Table 407-2 in Subsection 407.12 and replace with the following:
407.12 Double and Triple Course Chip Seal. Table 407-2.
Table 407-2 Approximate Quantities of Material for
Double Course Surface Treatments
Designation (Thickness)
Nominal Maximum
Size of Aggregate
Aggregate Gradation(1)
Estimated Quantity of Aggregate(2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of Asphalt Binder (3) gallons/yd2
2A (3/4 inch) 1st Application 3/4 inch A 40 – 49 0.35 – 0.51 0.22 – 0.33 2nd Application 3/8 inch C 20 – 26 0.51 – 0.60 0.33 – 0.42 2B (5/8 inch) 1st Application 1/2 inch B 29 – 40 0.31 – 0.40 0.18 – 0.29 2nd Application No. 4 D 14 – 20 0.40 – 0.51 0.24 – 0.33 2C (1/2 inch) 1st Application 3/8 inch C 26 – 35 0.20 – 0.31 0.11 – 0.22 2nd Application No. 4 B 9 – 15 0.31 – 0.40 0.18 – 0.29
(1) See Table 703-7 for aggregate gradations.
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below
(3) Adjust the asphalt content of the first application for the condition of the road.
Add Table 407-2a to Subsection 407.12.
407.12 Double and Triple Course Chip Seal. Table 407-2a.
Table 407-2a
Approximate Quantities of Material for Triple Course Chip Seal
Designation (Thickness)
Nominal Maximum
Size of Aggregate
Aggregate Gradation(1)
Estimated Quantity of Aggregate(2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of
Asphalt Binder(3) gallons/yd2 3A (3/4 inch) 1st Application 3/4 inch A 35 – 46 0.24 – 0.35 0.15 – 0.27 2nd Application 3/8 inch C 20 – 26 0.31 – 0.40 0.18 – 0.29 3rd Application No. 4 D 9 – 15 0.24 – 0.35 0.15 – 0.27 3B (5/8 inch) 1st Application 1/2 inch B 29 – 40 0.20 – 0.31 0.11 – 0.22 2nd Application 3/8 inch C 15 – 20 0.31 – 0.40 0.18 – 0.29 3rd Application No. 4 D 9 – 15 0.20 – 0.31 0.11 – 0.22
(1) See Table 703-7 for aggregate gradations.
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65 as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below
(3) Adjust the asphalt content of the first application for the condition of the road.
407.15_National_5_17_2017
Delete Subsection 407.15 and replace with the following:
407.15 Payment.
407.15 The accepted quantities will be paid at the contract price per unit of measurement for the Section 407 pay items listed in the bid schedule. See Subsection 109.05.
414 — ASPHALT PAVEMENT CRACK SEALING AND FILLING
Description
414.01 This work consists of routing, cleaning, sealing, and filling cracks in asphalt pavement surfaces.
Material
414.02 Conform to the following Section and Subsection:
Asphalt concrete 403 Joint sealants and crack fillers (hot applied) 712.01(a)
Equivalent material conforming to WisDOT Highway and Structure Specification 475 may be substituted with prior CO approval.
Construction Requirements
414.03 Equipment. Furnish equipment with the following capabilities:
(a) Router. A power rotary impact router or vertical spindle router capable of creating a reservoir to the required depth and width without damaging adjacent pavement.
(b) Air lance. A hot compressed air lance capable of providing clean, oil-free compressed air at a volume of 100 cubic feet (2.8 cubic meters) per minute, a pressure of 120 pounds per square inch (830 kilopascals), and a temperature of 2000 °F (1100 °C).
(c) Application wand. A wand attached to a heated hose attached to a heated material chamber that maintains material temperature within manufacturer’s tolerances. Supply proper wand tips for desired application.
(d) Heating kettle. An indirect-heating double boiler capable of constant and effective agitation. Fill the space between the inner and outer shells with oil or other heat transfer medium. Provide an accurate and calibrated thermometer with a range from 200 to 600 °F in 5 °F graduations (90 to 320 °C in 2 °C graduations) located so the material temperature can be safely checked.
(e) Squeegee or screed. A hand-held squeegee or screed of appropriate configuration for filling cracks flush with the surface, underfilling cracks to recess below the surface, or overfilling cracks to an overband shape.
(f) Compressor. A compressor capable of producing oil- and water-free air at a minimum rate of 100 cubic feet (2.8 cubic meters) per minute with a minimum continuous line pressure of 125 pounds per square inch (860 kilopascals).
414.04 Routing. Rout, clean, and seal cracks in a continuous operation. Do not allow traffic to close or damage routed cracks.
Rout ⅛- to ½-inch (3- to 13-millimeter) wide cracks to produce vertical, intact walls and a flat bottom with a reservoir centered over the crack. Make the reservoir two to three times the width of the crack.
Rout cracks to a depth of ½ to ¾ inches (13 to 19 millimeters).
414.05 Cleaning. Prevent debris from entering waterways, travel lanes open to public traffic, or areas designated not to be disturbed. Remove dirt, dust, and other deleterious material from the crack walls and cavity using a stream of air or other approved methods. Blow or brush dry material off the pavement surface.
414.06 Sealing and Filling. Dry the crack surfaces with the hot air lance before sealing or filling.
Do not seal or fill cracks when the pavement surface temperature is below 35 °F (2 °C) and weather conditions are rainy or foggy.
(a) Sealing (routed cracks or cracks averaging ¼ to 1 inch (6 to 25 millimeters) wide).
Submit a copy of and adhere to the manufacturer’s recommendations for heating and applying the hot applied crack material. Heat the material to pouring temperature in a heating kettle and continuously agitate the material.
Discard sealant when:
(1) Heated above the safe heating temperature recommended by the manufacturer;
(2) Held at pouring temperature for more than 12 hours;
(3) Reheated more than once; or
(4) Not consistent or uniform in appearance.
Warm and dry the crack surfaces using a hot-compressed air lance if the pavement temperature is lower than 50 °F (10 °C) or moisture is present. Keep the lance moving to prevent burning the pavement surface. Place and finish the material within 5 minutes after heating the pavement surface with the lance.
Use an application wand to place material in each crack from the bottom up. Insulate the wand to maintain pouring temperature while placing material. Return the wand to the heating kettle immediately after sealing each crack. Use a squeegee or screed to strike off the material.
(b) Filling (cracks averaging more than 1 inch (25 millimeters) wide). Fill each crack with an asphalt mix according to Section 403. Use a squeegee, screed, or other suitable equipment to force the mix into the crack. Fill each crack flush with the pavement surface and compact the asphalt mixture.
Do not allow traffic on sealed or filled cracks until the sealant or filler has cured or is treated with debonding material recommended by the manufacturer and approved by the CO.
414.07 Resealing Cracks. Reseal cracks exhibiting adhesion failure, damage, incomplete filling, foreign objects in the sealant, or otherwise rejected by the CO.
414.08 Acceptance. Material for asphalt pavement crack sealing or filling will be evaluated under Subsections 106.02 and 106.03.
Asphalt pavement crack sealing and filling will be evaluated under Subsections 106.02 and 106.04.
Measurement
414.09 Measure the Section 414 pay items listed in the bid schedule according to Subsection 109.02.
Payment
414.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 414 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
| Forest Service Supplemental Specifications |
| 2018 CNNF Pavement Preservation |
| Preface |
| 101 - Terms¸ Format¸ and Definitions |
| 101.01 Meaning of Terms. |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid¸ Award¸ and Execution of Contract |
| Delete Section 102. |
| 103 - Scope of Work |
| Delete Subsections 103.02, 103.03, 103.04, 103.05 and add the following. |
| 104 - Control of Work |
| Delete Subsections 104.01, 104.02, 104.04. |
| 104.06 Use of Roads by Contractor. |
| 106 - Acceptance of Work |
| 106.01 Conformity with Contract Requirements. |
| 106.02 Visual Inspection. |
| 107 - Legal Relations and Responsibility to the Public |
| Delete Subsection 107.05. |
| 108 - Prosecution and Progress |
| Delete Section 108. |
| 109 - Measurement and Payment |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. |
| 109.02 Measurement Terms and Definitions. |
| 155 - Schedules for Construction Contracts |
| 156 - Public Traffic |
| Section 156. – PUBLIC TRAFIC |
| 407 - Chip Seal |
| 407.01 Description. |
| 407.07 Weather Limitations. |
| 407.08 Production Start-Up Procedures. |
| 407.09 Asphalt Application. |
| 407.11 Placing and Finishing. Table 407-1. |
| 407.12 Double and Triple Course Chip Seal. |
| 407.12 Double and Triple Course Chip Seal. Table 407-2. |
| 407.12 Double and Triple Course Chip Seal. Table 407-2a. |
| 407.15 Payment. |
414 — ASPHALT PAVEMENT CRACK SEALING AND FILLING