Bridge_Quantity_Breakdown.pdf
PDF 56 KB Posted
- Attached to
- Pavement Preservation - Bayfield, Sawyer, Ashland, Price, Florence and Forest Counties, Wisconsin
- Solicitation number
- 12569R18Q0024
About this file
Bridge Quantity Breakdown
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_12569R18Q0024_Amd_0001.pdf | ||
| General_Decision_Number_WI180010_01-05-2018_WI10.pdf | ||
| Schedule_of_Items.pdf | ||
| FSSS.pdf | ||
| ConstructionRFQ_FAC97_01242018.pdf | ||
| ConstructionRFQ_FAC97_01242018.rtf | RTF text file | |
| Location_Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bridge Name LNFT Crack Sealing 136-1.6 270 144-4.1 60 149-1.8 525 152-5.9 60 153-2.6 285 173-8.3 260 183-4.3 100 187-1.8 120 189-2.6 372 * 196-4.7 700 198-1.0 231 * 199-6.5 340 2131-4.6 1530 2131-13.1 1170 2134-1.5 265 2134-8.0 220 2141-10.0 165 2169-1.5 210 2174-18.9 360 2371-1.2 104 * 2398-2.4 80 390-0.85 66
Total 7493
*All quanities are field measured except those marked with an asterisk. Those quanities are estimated, based off the average cracks / square foot of the other bridges.
Bridge Crack Seal Quantity Breakdown
Bridge QTY
File details come from the government source that posted it.