12505B24R0024 - 0001 Amendment with Q-A Attached.pdf

PDF 323 KB Posted

Attached to
Prefabricated Metal Building Federal contract opportunity
Solicitation number
12505B24R0024
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This document is an amendment to a Request for Proposals (RFP) for a Prefabricated Metal Building solicitation (12505B24R0024) issued by the United States Department of Agriculture (USDA), Agricultural Research Service (ARS). The amendment provides answers to questions received from potential offerors and extends the proposal due date to September 10, 2024. The solicitation is a 100% Small Business Set-Aside with a NAICS code of 236210 (Industrial Building Construction) and an estimated magnitude of construction between $250,000 and $500,000. Key details include:

  • Allows for a post frame structure built outside the existing concrete pad instead of on top of it
  • Confirms the project is exempt from taxes and requires permits
  • Clarifies that a bid bond is required, and a performance bond will be required if awarded the contract
  • Provides guidance on loading requirements, foundation work, and minority requirements
  • States the period of performance can be extended to cover material/equipment lead times
  • Confirms gutter and downspout requirements, but no plans for high-moisture storage in the building
  • Specifies the Superintendent, SSHO, and QC Manager can be the same individual

View the file

Other files for this federal contract opportunity

Other files attached to Prefabricated Metal Building, newest first.
File Type Posted
WD WI20240002-8 dated 8-16-2024.pdf PDF
WD WI20240002-7 dated 6-28-2024.pdf PDF
AS BUILT- RED RECTANGLES DRAWINGS.pdf PDF
ARS-371.pdf PDF
ARS-372.pdf PDF
SF 1442 - 12505B24R0024.pdf PDF
2024-04-25 Pre-engineered Metal Building-- SOW.pdf PDF
Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12505B24R0024 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12505B

PEORIA IL 61604

1815 N UNIVERSITY STREET

USDA ARS MWA AAO ACQ/PER PROP

09/03/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/02/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. Add Questions and Answers received as of 20 Aug 2024.

2. Extend proposal due dates until 10 Sep 2024.

3. All other terms and conditions remain unchanged.

Period of Performance: 09/30/2024 to 11/29/2024

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JOSHUA J. DOBEREINER

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Questions and Answers – 125B24R0024 Prefabricated Metal Building

Q1: After the pre-bid site visit, I discussed this project with our Engineering/Design Team, and they do not feel that the existing concrete do not have the strength for the size of structure needed to cover the concrete pad. Would it be acceptable to construct a post frame structure along the outside of the concrete walls, with posts offset from the existing piers and set into the perimeter soil? I wanted to confirm with you that bidding the project this way will meet the expectations, since I am aware the original intent was to build the structure on top of the concrete walls. This solution will still provide all the same coverage and primary elements while decreasing the amount of concrete and earthwork required to build on top of the existing concrete structure.

A1: A proposal to build a post frame outside of the concrete pad is acceptable, the design must ensure proper drainage around the perimeter while diverting flow away from the manure lagoon. In addition, the frame posts on the east and west sides must be sheathed unlike the north and south sides which are open ends. Note that the existing pier reinforcements footings sizes (see the attachment drawings on the solicitation) . This does not change any requirements in the solicitation.

Q2: Can you verify we are to bid without taxes?

A2: This is a federal project and is exempt from state and federal taxes.

Q3: Are we to include permits (local, state, etc.)

A3: Yes. (Contract Performance, Permits on page 12 of SOW).

Q4: Please verify a bid bond and a performance/payment bond is required?

A4: A bid bond is required when submitting a proposal. Performance bonds are required if you are awarded the contract

Q5 What kind of loading do you want on the trusses?

A5 Use loading as identified by current federal, state, and local codes.

Q6 Are we to include any foundation work?

A6 Yes, if the structure is built on the existing foundation wall, the foundation must be reinforced.

Q7 Is this considered a commercial project, or does it fall under the Agricultural exempt code in Wisconsin?

A7 No, Agricultural exempt code does not apply.

Q8 Are there any minority requirements?

A8 Yes, please see Provision – FAR 52.222-23 of the Construction Clauses

Q9 Can the period of performance be extended after award once the material/equipment lead times are confirmed due to the current market conditions for the equipment this project?

A9 The period of performance can only be extended to cover material and equipment lead time, the contractor must provide written vendor confirmation to the Government.

Q10 Since the structure will no longer be built on top of the concrete walls, do I need to figure repairing the existing cracks in the concrete or can this be left alone?

A10 If post frame is constructed outside the concrete pad, concrete crack repairs are not required.

Q11 Will this building require gutters and downspouts, since the hoop frame didn’t have any form of run-off control, I am wondering if that caused issues with the site drainage or if it is fine to build without?

A11 The SOW listed gutter and downspouts as requirements (see Design and

Structural Requirements c. Roof Design pg 8, SOW)

Q12 Will there be any high-moisture storage in the new building (salt sand, fresh waste, mulch, liquids, etc.)? I am asking since if this building will be used for high-moisture items at any point in the future the structural components will need to have an epoxy coating applied.

A12 We do not plan to store high moisture materials in the building

Q13 Do the Superintendent, SSHO, and the QC Manager need to be 3 separate individuals?

A13 No