About this file

This document is a solicitation for a pre-engineered, post frame, metal open ended building on an existing pad located at the Stratford, Wisconsin USDA-ARS Environmentally Integrated Dairy Management Research Unit (EIDMRU).

The solicitation is a 100% Small Business Set-Aside with a NAICS code of 236210 and a $45 million size standard. The magnitude of construction is estimated to be between $250,000 and $500,000, with a 60-day period of performance after notice to proceed. The solicitation requires the use of biobased products to the maximum extent practicable. Site visits are scheduled for August 13 and 14, 2024, and all questions must be submitted by August 20, 2024. The agency is the USDA Agricultural Research Service.

View the file

Other files for this federal contract opportunity

Other files attached to Prefabricated Metal Building, newest first.
File Type Posted
WD WI20240002-8 dated 8-16-2024.pdf PDF
12505B24R0024 - 0001 Amendment with Q-A Attached.pdf PDF
2024-04-25 Pre-engineered Metal Building-- SOW.pdf PDF
AS BUILT- RED RECTANGLES DRAWINGS.pdf PDF
ARS-371.pdf PDF
ARS-372.pdf PDF
Past Performance Questionnaire.pdf PDF
WD WI20240002-7 dated 6-28-2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1127791

USDA ARS MWA AAO ACQ/PER PROP

1815 N UNIVERSITY STREET

PEORIA IL 61604

ARS-12505B

JEFFERY KATHMAN 515-667-0841

1x 08/02/2024

12505B24R0024

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Pre-engineered Metal Building at the Environmentally Integrated Dairy Management

Research Unit, in Stratford, Wisconsin per the attached Statement of Work and drawings.

The North American Industry Classification System (NAICS) Code is 236210. The Small

Business Size Standard is $45 Million.

This is a 100% Total Small Business Set-Aside

The magnitude of construction is estimated to be between $250,000 and $500,000.

NOTE: Email responses in Adobe PDF format are hereby authorized for the submittal of offers and proposal information.

POC: Jeffery L. Kathman

Phone: 515-667-0841

Email: jeffery.kathman@usda.gov

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

FAR 52.211-10

09/03/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA ARS MWA AAO ACQ/PER PROP

1815 N UNIVERSITY STREET

PEORIA IL 61604

ARS-12505B

JOSHUA J. DOBEREINER

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 41

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12505B24R0024

Delivery: 60 Days After Notice to Proceed

Delivery Location Code: ARS-12569S-1

MWA ENVIRONMENTALLY INTEGRATED DAIR

208356 DRAKE AVENUE

STRATFORD WI 54484 US

Period of Performance: 09/30/2024 to 11/29/2024

0001 Pre-engineered Metal Building, EIDMRU, Stratford, WI

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SOLICITATION 12505B24R0024

Stratford, WI

Pre-engineered Metal Building

B - SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCOPE OF CONTRACT

B.2 SCHEDULE OF ITEMS

B.3 PERFORMANCE TIME

C - SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GENERAL INTENTION

C.2 DESCRIPTION OF WORK

C.3 BIOBASED REQUIREMENTS

C.4 CONTRACT CLAUSES INCLUDED BY FULL TEXT

D - SECTION D – PACKAGING AND MARKING

E - SECTION E – INSPECTION AND ACCEPTANCE

E.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

E.2 CONTRACT CLAUSES INCORPORATED BY REFERENCE

E.3 FINAL INSPECTION

E.4 FINAL ACCEPTANCE

F - SECTION F – DELIVERIES OR PERFORMANCE

F.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

F.2 CONTRACT CLAUSES INCORPORATED BY REFERENCE

G - SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACTING OFFICER'S REPRESENTATIVE

G.2 CONTRACTOR PERFORMANCE INFORMATION AND CONTRACTOR PERFORMANCE

ASSESSMENT REPORTING SYSTEM (CPARS)

G.3 INVOICE PREPARATION AND SUBMISSION

H - SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

H.2 CONTRACT CLAUSES INCORPORATED BY REFERENCE

H.3 CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE

H.4 UTILITIES OUTAGE

H.5 COOPERATION WITH OTHER CONTRACTORS

H.6 SUBMITTALS AND SHOP DRAWINGS

H.7 LIST OF MATERIALS

H.8 PROPERTY DAMAGE LIABILITY INSURANCE

H.9 SUBCONTRACTORS, OUTSIDE ASSOCIATES AND CONSULTANTS

H.10 BIOBASED PRODUCTS

I - SECTION I – CONTRACT CLAUSES

I.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

I.2 CONTRACT CLAUSES INCORPORATED BY REFERENCE:

J - SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

K - SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS

K.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

K.2 CONTRACT PROVISIONS INCORPORATED BY REFERENCE

K.3 DUPLICATION OF COST

L - SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L.1 CONTRACT PROVISIONS INCLUDED BY FULL TEXT

L.2 CONTRACT PROVISIONS INCORPORATED BY REFERENCE

L.3 INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS

M - SECTION M – EVALUATION FACTORS FOR AWARD

M.1 CRITERIA FOR EVALUATING PROPOSALS

M.2 BASIS FOR AWARD

Pre-engineered Metal Building

B - SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCOPE OF CONTRACT

The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, and supervision for complete construction of a pre-engineered, post frame, metal open ended building on an existing 194' x 63' concrete pad located at the Stratford EIDMRU - USDA farm, in accordance with the clauses, specifications, drawings, attachments, and other terms and conditions set forth herein.

B.2 SCHEDULE OF ITEMS

Item # Description Price/Cost

1 Pre-engineered Metal Building, Stratford, WI $

B.3 PERFORMANCE TIME

60 calendar days after Notice to Proceed is issued.

End of Section

Pre-engineered Metal Building

C - SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GENERAL INTENTION

C.1.1 It is the intention of this contract to Construct a pre-engineered, post frame, metal open ended building on an existing 194’ x 63’ pad located at the Stratford EIDMRU – USDA farm.

C.2 DESCRIPTION OF WORK

C.2.1 Permits and Licenses. Pursuant to FAR 52.236-7 Permits and Responsibilities, the Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state, and local laws and regulations.

C.2.2 Directives, Instructions and References. Only the Contracting Officer shall issue directives/instructions defining the roles and responsibilities and appointment of a Contracting Officer Representative (COR); Location Monitor (LM); Project Manager (PM); Occupational Health & Safety Manager and/or any other functional appointment as deemed necessary for the scope of work.

C.2.3 The Contractor shall manage the total work effort associated with the services required to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.

The Contracting Officer may at any time require samples, Material Safety Data Sheets (MSDS) or manufacturer’s data cut sheets of materials used in this contract.

C.2.4 Management. The Contractor shall manage the total work effort associated with the services required to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.

C.2.5 Service Interruptions/Utility Outages. If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the Contracting Officer Representative at least three business days in advance to allow notification of affected tenants and customers.

If the discontinued service is due to an emergency breakdown the Contractor shall notify the Contracting Officer Representative as soon as practicable. At a minimum, include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Once approved, and prior to beginning work on the utility system requiring shut down, attend a pre-outage coordination meeting with the Contracting Officer to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.

C.2.6 Key Personnel. The Contractor shall confirm to the Contracting Officer the List of Key Personnel and their qualifications provided as part of the proposal. The contractor will provide any additional information requested by the Contracting Officer to certify their qualifications.

C.2.7 Employee Requirements. The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Competent personnel shall be provided as required.

C.2.8 OSHA training requirements shall be strictly enforced prior to the commencement of work. The job superintendent must be an OSHA certified “competent person” with 30 hours of training and all other employees working on the project must have a minimum of 10 hours of OSHA training.

C.2.9 The job superintendent/OSHA certified competent person needs to be on site at all times when work is being done.

Pre-engineered Metal Building

C.2.10 Employee Conduct. Contractor employees and Subcontractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

C.2.11 Employee Appearance. The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The Contracting Officer reserves the right to determine the acceptability of any clothing worn. All Contractor/Subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment.

Employee identification shall not be substituted for required passes or badges.

C.2.12 Removal of Employees. The Contractor shall remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of Agricultural Research Service.

C.3 BIOBASED REQUIREMENTS

The United States Department of Agriculture (USDA) designates certain biobased products for federal procurement and specifies minimum biobased content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred’s minimum biobased content level. Visit the BioPreferred website (www.biopreferred.gov) for the complete list of designated products and the associated minimum biobased content level requirements.

The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002, the Food Conservation and Energy Act of 2008, the Agricultural Act of 2014, and the Federal Acquisition Regulation to provide biobased products. The Contractor shall also comply with the clause at FAR 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts, contained in Section I. The Contractor shall also comply with the provision at FAR 52.223-1, Biobased Product Certification, contained in Section K.

The Contractor shall utilize products and material made from biobased materials (e.g. biobased erosion control materials, biobased composite panels, biobased roof coatings, biobased insulating foam, biobased interior paints and coatings, and biobased wood and concrete sealers). All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).

Reporting is required by Sections 9002 of the Food Conservation and Energy Act of 2008 and the Agricultural Act of 2014. The Contractor shall provide quantities, product types, and dollar value of any USDA-designated biobased product purchased by the Contractor. This important data shall be submitted to the COR for the current quarter and current contract year. A brief explanation shall include the methodology used to calculate the dollar value of USDA-designated products used or supplied.

The Contractor should also note that USDA-designated biobased products are available for purchase through the AbilityOne Program (formerly known as the Javits-Wagner-O’Day (JWOD) Program). Under this program, members of organizations including the National Industries for the Blind (NIB) and the National Institute for the Severely Disabled (SourceAmerica) offer products and services that are mandatory by Federal agencies. A search of the AbilityOne Program’s online catalog (www.abilityone.gov) indicated biobased products that include but are not limited to cleaners (glass, hand, and multipurpose), graffiti removers, and sorbents.

C.4 CONTRACT CLAUSES INCLUDED BY FULL TEXT

AGAR 452.211-72 – Statement of Work/Specifications (Feb 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

(End of Clause) http://www.biopreferred.gov/ http://www.abilityone.gov/

Pre-engineered Metal Building

AGAR 452.211-73 – Attachments to Statements of Work/Specifications (Feb 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

AGAR 452.211-74 – Period of Performance (Feb 1988)

The period of performance of this contract is 60 days after notice to proceed.

Pre-engineered Metal Building

D - SECTION D – PACKAGING AND MARKING

(For this Solicitation, there are NO Clauses in this Section)

Pre-engineered Metal Building

E - SECTION E – INSPECTION AND ACCEPTANCE

E.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

AGAR 452.246-70 – Inspection and Acceptance (Feb 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at: Stratford, WI

(End of clause)

E.2 CONTRACT CLAUSES INCORPORATED BY REFERENCE

FAR 52.246-12 Inspection of Construction (Aug 1996)

E.3 FINAL INSPECTION

(a) A final inspection shall be made only when all the materials have been furnished, all the work has been performed, and all the construction provided for by the contract in accordance with the terms has been completed. If, upon examination by the Contracting Officer and/or Government inspection personnel, the project is determined not sufficiently completed to have warranted a final inspection, the contractor may be charged with any additional cost of re-inspection when material and workmanship are not ready at the time specified by the Contractor for its inspection.

(b) The contractor shall give the Contracting Officer ten (10) calendar days advance notice, in writing, of the date the work will be fully completed and ready for final inspection.

(c) The Contractor's request for final inspection will not be approved unless all documentation required below, and all other contract requirements have been provided to the Contracting Officer:

-Guarantees and warranty schedule and contacts -Certified payroll records for all prime and subcontractor employees

(d) As soon as practicable, following final inspection, the Contracting Officer will inform the contractor, in writing, of any discrepancies and/or omissions noted at the final inspection. The Contracting Officer shall also state the time allowable for replacement of material and performance or re-performance of any unsatisfactory work necessary for final acceptance.

E.4 FINAL ACCEPTANCE

Upon written notification that all deficiencies identified during the final inspection have been corrected, the Contracting Officer will schedule a final acceptance inspection of the work. If all construction required by the contract is determined to be complete and all requisite contract deliverables (e.g., certified payroll records, as-built drawings, warranty documents, etc.) have been submitted and approved by the Government, the Contracting Officer shall notify the Contractor in writing of such acceptance. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

Pre-engineered Metal Building

F - SECTION F – DELIVERIES OR PERFORMANCE

F.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

52.211-10 – Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to:

(a) commence work under this contract within ten calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 60 days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

F.2 CONTRACT CLAUSES INCORPORATED BY REFERENCE

FAR 52.242-14 Suspension of Work (Apr 1984)

Pre-engineered Metal Building

G - SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACTING OFFICER'S REPRESENTATIVE

A Contracting Officer's Representative (COR) may be designated after contract award. The contractor will be notified by letter of the name and duties of the COR.

G.2 CONTRACTOR PERFORMANCE INFORMATION AND CONTRACTOR

PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)

(a) General. Past performance evaluations shall be prepared at least annually and at the time the work under a contract or order is completed. Past performance evaluations are required for contracts and orders as specified in paragraphs (b) through (f) of this section, including contracts and orders performed outside the United States. These evaluations are generally for the entity, division, or unit that performed the contract or order. Past performance information shall be entered into CPARS, the Government wide evaluation reporting tool for all past performance reports on contracts and orders. Instructions for submitting evaluations into CPARS are available at http://www.cpars.gov/.

(b) Past performance evaluations shall be prepared for each construction contract of $750,000 or more, and for each construction contract terminated for default regardless of contract value. Past performance evaluations may also be prepared for construction contracts below $750,000.

G.3 INVOICE PREPARATION AND SUBMISSION

Based upon acceptance of required contract deliverables, the contractor shall submit an original invoice via email to jeffery.kathman@usda.gov.

The contractor shall include the following information on each invoice in order to be considered a proper invoice:

1. Name and address of contractor.

2. Invoice number and Invoice date.

3. Contract number.

4. Description of work and period of performance.

5. Name, title, phone number, and complete mailing address of official to whom payment is to be sent.

6. Name, title, phone number, and complete mailing address of person to notify in the event of a defective invoice.

7. Taxpayer Identification Number (TIN) and Unique Entity Identifier (UEI) Number.

8. Invoices must be submitted with ARS-371 and ARS-372, along with certified payroll records, Contractor Certification, and updated CPM Schedule.

Once the paper invoice has been approved by the Contracting Officer, the Contractor shall submit the invoice electronically through the Invoice Processing Platform (IPP) at www.ipp.gov.

http://www.cpars.gov/ http://www.ipp.gov/

Pre-engineered Metal Building

H - SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

AGAR 452.236-71 – Prohibition Against the Use of Lead-Based Paint (Nov 1996)

Neither the Contractor nor any subcontractor performing under this contract shall use paints containing more than 0.06 of 1 percent lead by weight (calculated as lead metal) in the total nonvolatile content of the paint, or the equivalent measure of lead in the dried film of paint already applied, or both.

AGAR 452.236-72 – Use of Premises (Nov 1996)

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall(i)provide and maintain sanitation facilities for the workforce at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

AGAR 452.236-73 – Archaeological or Historic Sites (Feb 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

AGAR 452.236-74 – Control of Erosion, Sedimentation, and Pollution (Nov 1996)

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in flowing streams without written approval by the

Contracting Officer.

AGAR 452.237-74 – Key Personnel (Feb 1988)

(a) The contractor shall assign to this contract the following key personnel:

Site Superintendent

(b) During the first ninety (90) days of performance, the contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-period, the contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the person(s)

Pre-engineered Metal Building being replaced. The Contracting Officer will notify the contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.2 CONTRACT CLAUSES INCORPORATED BY REFERENCE

FAR 52.236-2 Differing Site Conditions (Apr 1984) FAR 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) FAR 52.236-6 Superintendence by the Contractor (Apr 1984) FAR 52.236-8 Other Contracts -- (Apr 1984) FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (Apr 1984) FAR 52.236-10 Operations and Storage Areas (Apr 1984) FAR 52.236-11 Use and Possession Prior to Completion (Apr 1984) FAR 52.236-12 Cleaning Up (Apr 1984) FAR 52.236-13 Accident Prevention (Nov 1991) FAR 52.236-14 Availability and Use of Utility Services (Apr 1984) FAR 52.236-15 Schedules for Construction Contracts (Apr 1984) FAR 52.236-17 Layout of Work (Apr 1984) FAR 52.236-21 Specifications and Drawings for Construction (Feb 1997)

H.3 CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE

(a) Within 14 days after the date of receipt of award, the contractor shall prepare and submit to the Contracting Officer for approval, the original copy of ARS Form 371, Construction Progress and Payment Schedule. This form will serve as a Schedule of Estimates, Progress Schedule, and when used with ARS Form 372, it will be the basis for Requests for Partial Payment. The values employed in making the schedule will be used only for determining partial payments and will not be considered as establishing a basis for additions to or deductions from the contract. A copy of the approved schedule will be returned to the contractor.

(b) Samples of both ARS Forms 371 and 372 are available upon request. A supply of these forms together with instruction for completion of ARS Form 371 will be mailed to the contractor with the Notice of Award.

(c) ARS Form 371 is required even though progress or partial payments are not requested.

(d) The need by an offeror for partial or progress payments, when authorized in the payment provisions of this request for proposals, will not be treated as a handicap in making the award.

H.4 UTILITIES OUTAGE

Any interruption of utilities or services that would interfere with the operation of the facility will be permitted only with prior written approval from the Contracting Officer. Any utilities or service connections made at other than normal working hours will be at no additional cost to the Government. Permission to make such an interruption shall be requested in writing to the Contracting Officer, at least three (3) business days prior to the day of interruption. Failure by the Contractor to comply with this requirement will cause the Contractor to be subject to liability for actual damages.

H.5 COOPERATION WITH OTHER CONTRACTORS

During the period of construction for the work covered by this contract, other contractors performing work for the Government may be operating concurrently at the site. To minimize interference and delay to the construction progress of all concerned, all contractors shall cooperate with each other and coordinate their construction operations to the fullest extent. As far as practicable, all contractors performing work for the Government at the site shall have equal rights to the use of all referenced facilities. In a dispute regarding the use of such facilities, the matter shall be referred to the Contracting Officer.

H.6 SUBMITTALS AND SHOP DRAWINGS

(a) The Contractor shall submit for approval shop drawings of all manufactured products required in the

Pre-engineered Metal Building construction for which such drawings are hereinafter required. When approved, one set will be retained; one set forwarded to the Government representative on the job and two sets forwarded to the Contractor. When changes or corrections are necessary, two sets will be returned to the Contractor with such corrections noted thereon, and he shall resubmit revised prints.

(b) Shop drawings shall be marked with the contract number and Work Order Number, project description, name of the Contractor, and accompanied by a letter of transmittal. If the shop drawings show variations from the contract requirements because of standard shop practice or other reason, the Contractor shall make specific mention of such variations in his letter of transmittal.

(c) Approval of shop drawings will be general and will not relieve the Contractor from the responsibility of furnishing material and work required by the contract.

(d) Shop drawings shall be submitted for approval in ample time to permit checking of the drawings, allow the Contractor to make any corrections and resubmit drawings prior to the time construction is started on work covered by any drawings.

(e) Non-approval of equipment due to failure to meet specifications, or non-approval of the Contractor’s drawings due to submission of incomplete or incorrect information cannot be considered as a basis for extension of time for completion of the contract.

(f) The quantity of shop drawings required are subject to change. This will occur only when the Government is under contract with an A-E firm to approve shop drawings. In this respect, A-E will coordinate final quantity required between all interested parties.

H.7 LIST OF MATERIALS

(a) The Contractor shall submit for approval a complete list, in duplicate, of brands, type, and make of various equipment and materials proposed to be used. If the Contractor fails to submit such a list, or names of equipment which does not comply with the specifications, or if the manufacturers named are unsatisfactory, the Government reserves the right to reject same and to select satisfactory substitute materials. This selection shall be final and binding upon the Contractor, and the work shall be installed on this basis without change in contract price.

(b) In order to properly identify and to prove compliance with the requirements of the specifications, the Contractor shall give the following data for each product included in the list of materials.

Section heading of the specifications under which material is specified. Manufacturer’s name and address.

Grade, type, trade or catalog number. Size, capacity, and other pertinent data.

(c) All materials, fixtures, and equipment furnished and installed under this contract shall be new and of the best quality; shall be standard cataloged products or reputable manufacturers products or of special manufacture, satisfying completely the contract requirements.

(d) Similar items, unless otherwise specified herein or approved by the Contracting Officer, shall be the product of the same manufacturer, and those fulfilling the same requirements as to size and construction shall be identical.

(e) Substitutions and/or Approved Equal: Where particular make, brand or type of material or equipment is mentioned in these specifications, it is to denote quality standard of article desired, but does not restrict contractor to brand specified; however, any substitution must be met with approval of the Contracting Officer.

Other products comparable in type, quality, utility, and price are acceptable if approved by the Contracting Officer. Burden of proof of equality shall rest with the Contractor. The Contracting Officer shall be sole judge of paralleled quality.

H.8 PROPERTY DAMAGE LIABILITY INSURANCE

The Contractor shall ensure that the property damage liability insurance policy (or rider) required by FAR 52.228-5, Insurance-Work on a Government Installation, is in full compliance with all the terms and conditions of this contract. The policy shall not contain any exclusions or exceptions that would limit or adversely affect the Government’s rights and remedies under any other clause in this contract or other Federal regulation or law.

Pre-engineered Metal Building

Should there be any exclusions or exceptions contained in the policy that limits or adversely affects the Government’s rights, the Contractor shall be responsible for the full amount of any damages that occur to the immediate facilities, adjacent facilities/property, and other Government property under the control of the Contractor due to fraud, negligence, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes and laws. The Contractor shall have full responsibility and is liable for these facilities and properties until the Government has accepted the contract as being completed in full and a release from claims has been received from the Contractor. For those areas where the Government has taken "beneficial occupancy" prior to completion and acceptance of the whole contract, the contractor shall not be responsible for those specific areas under Government control, except in such instances where damage occurs to those areas as a result of negligence, fraud, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes, or laws in those areas under the control of the Contractor. This liability and responsibility includes the activities of all the Contractor’s personnel, their subcontractors and suppliers.

H.9 SUBCONTRACTORS, OUTSIDE ASSOCIATES AND CONSULTANTS

Any subcontractors, outside associates or consultants required by the Contractor in connection with the services covered by the contract will be limited to individuals or firms that were specifically identified at time of award or agreed upon during negotiations. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these individuals or firms.

H.10 BIOBASED PRODUCTS

The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA Bio-Preferred’s minimum bio-based content level. Visit the BioPreferred web site https://biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.

http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml https://biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml

Pre-engineered Metal Building

I - SECTION I – CONTRACT CLAUSES

I.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

FAR 52.222-35 – Equal Opportunity for Veterans (Jun 2020)

(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.

(End of Clause)

FAR 52.222-36 – Equal Opportunity for Workers With Disabilities (Jun 2020)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

FAR 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA Designated Items (May 2008)

(a) Definitions. As used in this clause— “Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall—

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and

(2) Submit this estimate to the contracting officer.

FAR 52.225-9 – Buy American–Construction Materials (Oct 2022)

Pre-engineered Metal Building

(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Critical component” means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

“Critical item” means a domestic construction material or domestic end product that is deemed critical to U.S.

supply chain resiliency. The list of critical items is at FAR 25.105.

“Domestic construction material” means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of “cost of components”.

“Fastener” means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

“Foreign construction material” means a construction material other than a domestic construction material.

“Foreign iron and steel” means iron or steel products not produced in the United States. Produced in the Unites States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Pre-engineered Metal Building

“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

“Steel” means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: None

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

Pre-engineered Metal Building

(1)

(i)…