RFIs.pdf
PDF 76 KB Posted
- Attached to
- Demolish Facility Slab, and Outlying Buildings at Biological Control of Insects Research Laboratory (BCIRL)
- Solicitation number
- 12505B24R0014
About this file
This document is a Request for Information (RFI) Solicitation 12505B24R0014 related to the demolition of a facility slab, and outlying buildings at the Biological Control of Insects Research Laboratory (BCIRL) in Columbia, Missouri. The solicitation is issued by the United States Department of Agriculture (USDA), Agricultural Research Service (ARS).
The key details are: The solicitation is for a firm-fixed price order to demolish the facility slab and outlying buildings. The NAICS code is 238910, Site Preparation Contractors, with a small business size standard of $19.0 million. The magnitude of construction is between $250,000 and $500,000, with a period of performance of 150 days after receipt of the Notice to Proceed. Bid, payment, and performance bonds are required. Organized site visits are scheduled for April 24 and April 25, 2024, and all questions must be submitted by May 2, 2024. This requirement is set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will only be available through the Contract Opportunities page on SAM.gov, and no paper copies will be provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 - Amendment 01.pdf | ||
| Site Visit Sign In 04242024.pdf | ||
| Site Visit Sign In 04252024.pdf | ||
| ARS-372.pdf | ||
| ARS-371.pdf | ||
| Material Submittal Form.pdf | ||
| SF-1442.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Final Environmental Assessment.pdf | ||
| Utilities Survey.pdf | ||
| Statement of Work and Specifications.pdf | ||
| Wage Determination.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information Solicitation 12505B24R0014
Question 1: Will the steam lines and adjacent pit be part of the demolition scope? If so, how far back from the pit do the water lines need to be removed and do they need to be capped?
Answer 1: No.
Question 2: Will the refrigerators in all the structures be removed prior to demolition?
Answer 2: Most refrigerators will still be there.
Question 3: Can existing gravel presumed to be under the elevated slab be used as backfill material?
Answer 3: No. Haul off gravel