Industry Questions and Government Responses.pdf
PDF 36 KB Posted
- Attached to
- Lateral Move Precision Irrigation System Federal contract opportunity
- Solicitation number
- 12505B24Q0184
About this file
This document contains the Industry Questions and Government Responses related to RFQ 12505B24Q0184 for a Lateral Move Precision Irrigation System. The solicitation is a 100% Small Business Set-Aside for the USDA Agricultural Research Service Midwest Area, with a NAICS code of 334290 (Water Supply and Irrigation Systems). The Government has provided responses to industry questions regarding field coordinates, dimensions, water source, flow rate, and communication restrictions. The Statement of Work requires the contractor to provide one fully functional lateral irrigation system, delivered, installed, and with training provided to the USDA location by March 1, 2025. The contract will be a Firm Fixed Price award based on the Lowest Price Technically Acceptable criterion. Quotes must be submitted electronically by the due date, and shall include price, technical specifications, and a completed FAR 52.212-3 provision.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12505B24Q0184 P0002 Industry Questions.pdf | ||
| 12505B24Q0184 Lateral Move Precision Irrigation System.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Questions and Government Responses
RFQ 12505B24Q0184
Lateral Move Precision Irrigation System
1. Could I request an on-site visit? Response: No
2. What are the Field Coordinates Response: There are several small fields. 38 55’ 44.75”N, 92 21’ 13.22”W will get you in the field area.
3. What are the field limitations in Width and Length Response: We need the wheels to be 214’ apart in distance (as stated in the SOW). The fields are about 200’ X500’. These fields vary in width so some will have the wheels on the edge of the field.
4. What is the Water Source- Well, Pond Response: Well
5. Average expected GPM Water flow Response: 200 GPM
6. Can I talk to someone from the design-build team for the project to ask questions? Response: No, all questions shall be in writing to the Contracting POC to allow every contractor to have access to the same information.
File details come from the government source that posted it. Updated .