Q and A for PO 12505B23Q0186.pdf
PDF 203 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- 12505B23Q0186
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12505B23Q0186 Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for Solicitation # 12505B23Q0186
Q: Is this a new or a follow-on effort? What is the name of current contractor? Is there an incumbent for this requirement? Who is the incumbent on this contract? Can you provide the contractor’s name and contract number? Is this a new requirement? If not, can the government please provide details about the incumbent contractor (name, contract number, and value of the contract)?
A: There is no current contract in place. The prior contract holder was Anthony Hoberg Cleanrite.
Q: Can you provide the prior contract number? How much was the previous award? What is the current yearly value?
A: The prior contract # 12505B21C0003 had a total value of $124,407.00.
Q: The announcement says the square footage of the lab is 21,000 square feet, but it also mentions there are lavatories in 3 buildings. Are there other areas to be cleaned in the other buildings?
A: Please see the facility map below. The complex includes buildings 11, 1, 8, 2, 3, 4 and 9. The rest rooms are in buildings 11, 1 and 2. The estimated 21,000 square feet is inclusive of the whole area shown.
Q: What is the frequency of cleaning? How many days a week?
A: This information has already been provided in the description section of the solicitation and on the performance work statement (PWS) included in the attachments to the solicitation. Please read the solicitation description and the review all attachments for the answer(s).
Q: Has there been a definite time established between the 6pm-6am timeframe for the janitorial work to be completed?
A: No, there is not a definite time. The time will be scheduled with the location staff after an award has been made.
Q: Referring to Section 2 - General Conditions: Work will be performed between 6 PM and 6 AM, or weekends as scheduled with Location for necessary cleaning. What is the expected number of hours per year?
A: The expected number of hours is however many it takes to completed the work outlined in the solicitation description and on the Performance Work Statement included in the attachments to the solicitation.
Q: Referring to Section 2 - General Conditions: The Contractor shall furnish only qualified and competent work staff who are proficient in performing janitorial work. Which positions are needed and what are the number of FTEs required? Does the government expect offerors to submit resumes for proposed staff?
A: There are no specified positions that need to be filled or a number of required FTEs. We are not expecting vendors to submit resumes for proposed staff. It is up to the vendor to ensure their staff are qualified and competent.
Q: Referring to Section 2 - General Conditions: For Subcontractors, we require work experience references. Notification of sub-contractor selection is required prior to approval. What number of references are required from all bidders?
A: As many references as you are able to provide.
Q: Does the government expect only a Price Quote, or does it expect both a technical solution and Price Quote?
A: Only a price quote is required. You may also provide a technical solution if you wish to do so.
Q: Are there any specific instructions for submitting the quote?
A: Yes, see the solicitation description as it provides clear instructions for submitting quotes.
Q: Is it possible for the government to provide a template for pricing?
A: No, it is up to vendors to determine pricing for the outlined services for the base and all four option years.
Q: Is there a scheduled site visit?
A: No, there is not a site visit scheduled.
Q: Would the government be able to accept the request to extend the deadline?
A: No, a request to extend the quote submission deadline would not be accepted at this time.
Shop Carpentry Shop
Machine Storage
Threshing Room
Soil Processing
Growth Chamber
102 103 104 105
118 116B 114
Greenhouse
38 3240
Machine Repair
#4 #3 #2 #1
Greenhouse Corridor
Soil Mixing Room
Head House
H al l
16 21 24A
27 25
Library
Hall 12
Hall 44
34 33
15A
A108
Conference Room A123
A118
H al l3
Hall 126
120 121
H al l
A120
A114
A112 A111
A110
A113
H al l 1
Lunch Room
17 18 19 20
10 9 8 7 6 5 4
A116
A107
A106
A105
A104
RL
A103
Office
A109
13A
24E
24B 24C
24D
Plant Biochem Lab
Boiler Room
Middle Chem Lab
East Chem Lab
West Chem Lab
Micro- Biology Lab
Instru-ment Room
Erosion Lab
Photo Lab
Men’s Restroom
Shop Office
Agronomy Lab
Soil Physics Lab
Plant Phys Lab
Weed Lab
Visual Aids
Restroom
Women’s Restroom
Janitor
Chroma-tography Lab
Bldg #4
Bldg #1
Bldg #11
Bldg #2
Bldg #8
116C
116A
118A
47 46
60 57 Soil Grinding Soil Storage #1 56E
56D 56F 56G
56C
56B56A55
Plant Weighing Plant Grinding
Plant Processing
Bag Storage
45B 45C
45A
D
E
Gas Cylinder Storage
Storage
Soil Weighing
Soil Storage #2
Electronics
Ovens
GreenhouseGreenhouseGreenhouse
A122
Scale: Approx. 100 ft.
Bldg #9
Bldg #3 Shop
Carpentry Shop
Machine Storage
Threshing Room
Soil Processing
Growth Chamber
102 103 104 105
118 116B 114
Greenhouse
38 3240
Machine Repair
#4 #3 #2 #1
Greenhouse Corridor
Soil Mixing Room
Head House
H al l
16 21 24A
27 25
Library
Hall 12
Hall 44
34 33
15A
A108
Conference Room A123
A118
H al l3
Hall 126
120 121
H al l
A120
A114
A112 A111
A110
A113
H al l 1
Lunch Room
17 18 19 20
10 9 8 7 6 5 4
A116
A107
A106
A105
A104
RL
A103
Office
A109
13A
24E
24B 24C
24D
Plant Biochem Lab
Boiler Room
Middle Chem Lab
East Chem Lab
West Chem Lab
Micro- Biology Lab
Instru-ment Room
Erosion Lab
Photo Lab
Men’s Restroom
Shop Office
Agronomy Lab
Soil Physics Lab
Plant Phys Lab
Weed Lab
Visual Aids
Restroom
Women’s Restroom
Janitor
Chroma-tography Lab
Bldg #4
Bldg #1
Bldg #11
Bldg #2
Bldg #8
116C
116A
118A
47 46
60 57 Soil Grinding Soil Storage #1 56E
56D 56F 56G
56C
56B56A55
Plant Weighing Plant Grinding
Plant Processing
Bag Storage
45B 45C
45A
D
E
Gas Cylinder Storage
Storage
Soil Weighing
Soil Storage #2
Electronics
Ovens
GreenhouseGreenhouseGreenhouse
A122
Scale: Approx. 100 ft.Scale: Approx. 100 ft.
Bldg #9
Bldg #3
Exits
North
Tornado Shelter Area
Fire Extinguishers
At bottom of stairs Boiler Room
Fire Pull Alarms
Preferred Tornado Shelter Area
Current Location
File details come from the government source that posted it. Updated .