12505B23Q0018 - Diesel Generator Maintenance QAs_2.7.23.pdf

PDF 473 KB Posted

Attached to
Diesel Generator Maintenance Service Contract, Ames, IA
Solicitation number
12505B23Q0018
Issued by

About this file

This combined synopsis and solicitation requests quotes for diesel generator maintenance services. The Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area is seeking a contractor to provide OEM authorized service and maintenance for generators, automatic transfer switches, and related equipment located at a facility in Ames, Iowa. The base year of performance is one year with four optional one-year extensions. Quotes are due by February 15, 2023 and must include technical and price submissions. Award will be made to the lowest priced technically acceptable offeror. The contractor must have a minimum of 10 years' experience servicing the equipment described and be an OEM authorized service provider.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12505B23Q0018 – Diesel Generator

Maintenance Questions dated 2/7/2023

Regarding the SOW

• What certifications/licenses are required to be submitted with our quote?

All technicians need to be certified diesel mechanics.

• 2.0 Background: Only OEM Caterpillar parts from the Caterpillar distribution system may be used on the Caterpillar Generators. The contractor needs to have 10 years’ experience servicing Caterpillar generators and operating generators via an ISO control system.

- Are their similar requirements to the Cummins units? And if so, please state them.

None for Cummins.

• Regarding (5) CAT generators’ roof-mounted radiators:

- What is the capacity of the remote radiators on the roof for these units?

47.6 gallons.

- How is the current installed system filled?

I have not watched Caterpillar do it. Probably pumped in from below. We can lift equipment on to the roof of the generator building using the telehandler if needed.

• Regarding load bank of (5) CAT units:

- A step-down transformer is required since the units are medium voltage. Will this be furnished by the government or by the contractor?

We usually use campus electrical load.

• Regarding the use of OEM suppliers:

- Is there an option to quote only the Cummins or CAT?

No.

- During the load bank test, are we able to use existing load then supplement with external equipment?

Yes.

- Is the Scope of Work able to be negotiated? This is a CAT scope, and we think it does not apply to the Cummins units.

No.

• Please confirm if thermal images are required on the ATS reports or is documentation of the readings sufficient.

Documentation is sufficient.

• Are there isolation breakers at the switchgear for the BLDG 153 CAT generators?

Not sure what they are asking. The breakers can be locked out or racked out.

• Are there any known pre-existing conditions that will require immediate attention if we are the successful offeror?

No.

• Should the cost of labor for corrective action discovered during PM be included in the proposal?

No.

• Should the costs of materials and/or equipment for corrective action discovered during PM be included in the proposal?

No.

• Should the cost for labor for emergency responses be included in the proposal?

No.

• Should the cost for labor for corrective actions identified during an emergency response be included in the proposal?

No.

• Should the cost for materials and/or equipment for corrective actions identified during an emergency response be included in the proposal?

No.

• Will there be a threshold to cap the expenditure by the successful offeror for work performed outside of the PM requirements?

No. Work performed outside of the contract will be quoted and approved, case by case.

• Is it possible to quote just the base year at this point?

No.

Regarding Contract Management & Execution

• What is expected for deliverables?

This is in the contractor requirements in the statement of work.

• What is expected for the quality control plan?

It’s in the Qasp which is essentially the same as the statement of work.

• What is expected for the risk management plan?

N/A

• What is the expected PPE for this requirement?

Perform a risk assessment for the required task and wear the appropriate PPE. Minimum PPE would be uniform shirt, long pants, safety toe shoes, safety glasses. Hearing protection and additional PPE as needed by tasks.

• What is expected for Government Furnished Equipment?

120 volt electricity and 100 psi compressed air for contractor equipment and tools.

• What is expected for Contractor Furnished Equipment?

All other equipment not provided by the Government.

• What is the process for delivery of materials directly to the facility for this requirement?

Contractor notifies the Government 2 weeks before the contractor is to be on site.

• What is the available onsite storage capacity for Contractor Furnished Equipment and materials?

Temporary storage space is available.

• What trainings are required?

Contractor internal trainings for safety, risk assessment, PPE choice and usage, hazardous materials handling and proper disposal are sufficient.