View the file

Other files

File Type Posted
SF-30 Amendment 01.pdf PDF
Site Visit Sign In Sheets.pdf PDF
Bollard Anchor Bolt Pattern Template.pdf PDF
Specifications.pdf PDF
ARS-372.pdf PDF
COVID Vaccination Attestation.pdf PDF
ARS-371.pdf PDF
Past Performance Questionnaire.docx DOCX document
Construction Signoff Form.pdf PDF
Wage Determination.pdf PDF
SF-1449.pdf PDF
Statement of Work.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information Solicitation 12505B22R0002

Question 1: Have (or will) the commissioning fees from chargepoint been paid for by the

USDA?

Answer 1: The installer is responsible for the on station activation fees.

Question 2: Please confirm the CT4021 model is a dual, 32 A charger fed by two 40 A circuit breakers.

Answer 2: Yes.

Question 3: Please confirm that there is no striping work required to be done by the contractor.

Answer 3: Correct. No striping work.

Question 4: Please confirm that there is no ADA or State mandated ramp to be constructed.

Answer 4: Correct. No ADA ramps.

Question 5: Please confirm that EV Charger/ADA related pole mounted signage or floor stenciled signage is not included in the contractor scope.

Answer 5: Correct. No signage.

Question 6: Is vegetation and plant restoration and replacement included in the contractor scope?

Answer 6: Yes, just grass seed. Do not damage tree, it is the only one of it’s type on campus.