RFIs.pdf
PDF 81 KB Posted
- Attached to
- Electric Vehicle Charging Station Installation
- Solicitation number
- 12505B22R0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30 Amendment 01.pdf | ||
| Site Visit Sign In Sheets.pdf | ||
| Bollard Anchor Bolt Pattern Template.pdf | ||
| Specifications.pdf | ||
| ARS-372.pdf | ||
| COVID Vaccination Attestation.pdf | ||
| ARS-371.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Construction Signoff Form.pdf | ||
| Wage Determination.pdf | ||
| SF-1449.pdf | ||
| Statement of Work.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information Solicitation 12505B22R0002
Question 1: Have (or will) the commissioning fees from chargepoint been paid for by the
USDA?
Answer 1: The installer is responsible for the on station activation fees.
Question 2: Please confirm the CT4021 model is a dual, 32 A charger fed by two 40 A circuit breakers.
Answer 2: Yes.
Question 3: Please confirm that there is no striping work required to be done by the contractor.
Answer 3: Correct. No striping work.
Question 4: Please confirm that there is no ADA or State mandated ramp to be constructed.
Answer 4: Correct. No ADA ramps.
Question 5: Please confirm that EV Charger/ADA related pole mounted signage or floor stenciled signage is not included in the contractor scope.
Answer 5: Correct. No signage.
Question 6: Is vegetation and plant restoration and replacement included in the contractor scope?
Answer 6: Yes, just grass seed. Do not damage tree, it is the only one of it’s type on campus.