Responses to Requests for Information 12505B19R0001 – Architect-Engineer Services – Midwest Area
Question: Will the SF330 page limit be 25 or 50 pages?
Answer: There is no page limit to the SF330.
Question: We believe this solicitation is a very similar sister solicitation to the Request for
Qualifications (RFQ) for 12405B-20-R-0004. In amendments to that request, they were told that Section L does not apply to the qualifications package they are to prepare, that Section L only applies to task orders solicited via awarded indefinite quantity contracts. We believe the same guidance applies to this RFQ, i.e., we are not required to provide any qualification responses to any requirements identified in Section L. Can you confirm?
Answer: Section L does not apply at this time.
Question: In Amendment 1 to the same sister RFQ, it states that the submission is not to be emailed. Our subject RFQ tells us to submit electronically and in hard copy. Can you confirm the required submission formats?
Answer: Submit as per the requirements of this solicitation (one copy via email and one sent on compact disc or USB drive).
Question: We sometimes see Section F projects provided in a MS Word format which allows us to go beyond one page and allows us to insert pictures and graphics.
Similarly, we sometimes see Section E resumes done in MS Word to allow more than one page for the five allowed projects. Are we required to use the SF 330 (Part I and II) directly as provided in the RFQ, without modifications?
Answer: The SF 330 that was included with the RFQ was provided in case a firm did not have access to the form. SF 330s can be submitted in any format as long as all of the information requested on the SF 330 is included.
Question: In conjunction with the previous question, are we to provide Section H supporting information in the referenced 25 pages using font no smaller than Times New Roman 10?
Answer: As per above response, there is no page limit for the SF 330. Font size needs to be no smaller than Times New Roman 12.
Question: We believe the only submission requirements are that we are to provide a standard response in an SF 330 format with special emphasis on the Section M evaluation factors. Can you confirm?
Answer: Correct.
Question: In RFQ Section M, paragraph M.1.3), it states, “Professional licenses of firms and team members in all the states included in the Midwest Area.” Can you please clarify what is meant by “Professional licenses in all the states included in the Midwest Area?” Does that mean the firm (and subconsultants) must be licensed in all of the Midwest Area states? Similarly, are the team members required to have licenses in all of the Midwest Area states?
Answer: The firm does not need to be licensed in each of the states in the Midwest area;
however, the firm (primary or subconsultants) must have the ability to seal the construction documents in all states of the Midwest Area.