SOLICITATION/CONTRACT 1. THIS CONTRACT IS A RATED

5. SOLICITATION TYPE2. CONTRACT NO. 4. SOLICITATION NUMBER

PAGE OF PAGES

7. ISSUED BY CODE 8. THIS ACQUISITION IS

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27

RATING

ORDER UNDER DPAS (15 CFR 700)

3. AWARD/

EFFECTIVE DATE ISSUE DATE

6. SOLICITATION

UNRESTRICTED OR SET ASIDE:

SMALL BUSINESS

SIZE STANDARD:

9. (AGENCY USE)

NO COLLECT CALLS

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN

CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A DIFFERENT

PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR

AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED

HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS

AND CONDITIONS STATED HEREIN.

CODE 12. ADMINISTERED BY

13. CONTRACTOR FACILITY 14. PAYMENT WILL BE MADE BY CODE CODE

OFFEROR CODE

TELEPHONE NO.

UNIQUE ENTITY IDENTIFER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:

15. PROMPT PAYMENT DISCOUNT 16. AUTHORITY FOR USING OTHER

THAN FULL AND OPEN COMPETITION

10 U.S.C. 2304 41 U.S.C. 253

NEGOTIATED

(RFP)

SEALED BIDS

(IFB)

1 46

01/12/2020

USDA ARS MWA AAO ACQ/PER PROP

1815 N UNIVERSITY STREET

PEORIA IL 61604

USDA ARS MWA AAO ACQ/PER PROP

1815 N UNIVERSITY STREET

PEORIA IL 61604

ARS-12505B

100.00

541330

% FOR:

X

X x x

ARS-12505B

Architect-Engineering Services for Midwest Area per SOW

$16.50

12505B20R0001

NAICS:

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS

8(A)

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

EDWOSB

17.

ITEM NO.

18.

SCHEDULE OF SUPPLIES/SERVICES

19.

QUANTITY

20.

UNIT

21.

UNIT PRICE

22.

AMOUNT

Delivery Location Code: ARS-12505A

USDA ARS MWA AAO OFFICE OF DIRECTOR

1815 N UNIVERSITY STREET

PEORIA IL 61604 US

Period of Performance: 09/01/2020 to 08/31/2025

Continued ...

27. SIGNATURE OF OFFEROR/CONTACTOR 28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

NAME AND TITLE OF SIGNER (TYPE OR PRINT) DATE SIGNED NAME OF CONTRACTING OFFICER DATE SIGNED

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET

FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION

NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS

OR CHANGES WHICH ARE SET FORTH HEREIN, IS

ACCEPTED AS TO ITEMS:

23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT

(FOR GOVERNMENT USE ONLY)

JOSHUA J. DOBEREINER

x

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION NOT USABLE

STANDARD FORM 1447 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.214(d)

COPIES TO

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include ZIP Code)

WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF ITEMS INVOLVEDWE DO

DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE OF ITEMS INVOLVED

CANNOT MEET DELIVERY REQUIREMENT

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS

PAGE

NO RESPONSE FOR REASONS CHECKED

46 2 OF

DATE AND LOCAL TIME

AFFIX

STAMP

HERE

TO:

FROM:

SOLICITATION NO.

USDA ARS MWA AAO ACQ/PER PROP

1815 N UNIVERSITY STREET

PEORIA IL 61604

ARS-12505B

12505B20R0001

STANDARD FORM 1447 (REV. 8/2016) BACK

(A)

ITEM NO.

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

(F)

AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 46

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12505B20R0001

0001 Architectural-Engineering Services - Base Year

Delivery: 08/31/2021

Period of Performance: 09/01/2020 to 08/31/2021

0002 Architectural-Engineering Services - Option Year 1

(Option Line Item)

08/01/2021

Delivery: 08/31/2022

Period of Performance: 09/01/2021 to 08/31/2022

0003 Architectural-Engineering Services - Option Year 2

(Option Line Item)

08/01/2022

Delivery: 08/31/2023

Period of Performance: 09/01/2022 to 08/31/2023

0004 Architectural-Engineering Services - Option Year 3

(Option Line Item)

08/01/2023

Delivery: 08/31/2024

Period of Performance: 09/01/2023 to 08/31/2024

0005 Architectural-Engineering Services - Option Year 4

(Option Line Item)

08/01/2024

Delivery: 08/31/2025

Period of Performance: 09/01/2024 to 08/31/2025

NSN 7540-01-218-4386 STANDARD FORM 1447 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.214(d)

SOLICITATION 12505B20R0001

Midwest Area

Architect-Engineer Services

B - SECTION B – SUPPLIES OR SERVICE AND PRICES/COSTS

B.1 SCOPE OF CONTRACT

B.2 MINIMUM GUARANTEE

B.3 PRICE SCHEDULE

C - SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

D - SECTION D – PACKAGING AND MARKING

D.1 SPECIFICATIONS

D.2 DRAWINGS

E - SECTION E – INSPECTION AND ACCEPTANCE

E.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

E.2 FINAL INSPECTION

F - SECTION F – DELIVERIES OR PERFORMANCE

F.1 EFFECTIVE PERIOD OF THE CONTRACT

F.2 CONTRACT CLAUSES INCLUDED BY REFERENCE

G - SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION DEFINITIONS

G.2 ARCHITECT-ENGINEER SELECTION UNDER INDEFINITE QUANTITY CONTRACTS ... 15

G.3 PAYMENTS UNDER INDEFINITE QUANTITY ARCHITECT-ENGINEER CONTRACTS ... 16

G.4 CONTRACTOR PERFORMANCE INFORMATION AND CONTRACTOR PERFORMANCE

ASSESSMENT REPORTING SYSTEM (CPARS)

G.5 6% FEE LIMITATION

H - SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

H.2 CONTRACT CLAUSES INCLUDED BY REFERENCE

H.3 SUBCONTRACTORS, OUTSIDE ASSOCIATES, AND CONSULTANTS

H.4 BIOBASED PRODUCTS

H.5 ENERGY EFFICIENCY

I - SECTION I – CONTRACT CLAUSES/PROVISIONS

I.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

I.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:

J - SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

K - SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS

K.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

K.2 CONTRACT PROVISIONS INCLUDED BY REFERENCE

K.3 DUPLICATION OF COST

L - SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L.1 CONTRACT PROVISIONS INCLUDED BY FULL TEXT

L.2 CONTRACT PROVISIONS INCLUDED BY REFERENCE

L.3 INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS

M - SECTION M – EVALUATION FACTORS FOR AWARD

M.1 CRITERIA FOR EVALUATING PROPOSALS

Architect-Engineer Services

B - SECTION B – SUPPLIES OR SERVICE AND PRICES/COSTS

B.1 SCOPE OF CONTRACT

The United States Department of Agriculture (USDA), Agricultural Research Service (ARS), Midwest Area (MWA) has a requirement for an Indefinite Quantity Contract (IQC) for Engineering Design and Construction Management/Administration Services for repair and maintenance, alteration, and/or new Modernization construction projects, including Design-Bid-Build (DBB), Design-Build (DB), and Construction Manager as Constructor (CMC) for its research laboratory facilities located throughout the MWA, which includes the states of Illinois, Indiana, Iowa, Kentucky, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. The Government intends to award multiple contracts. Specific requirements will be incorporated into individual task orders.

Services under the contract will include, but are not limited to, energy-related studies, environmental site assessments and studies, building and/or site investigations/studies, feasibility and conceptual studies, geotechnical investigations, radon testing, bio-containment, asbestos and other hazardous materials abatement, life cycle cost analyses, engineering design criteria development, statements of work/program of requirements development, design analyses, designs, construction drawings, specifications (including specifications for design-build), detailed cost estimates and analyses, bidding phase services, construction management/administration (including on-site construction management/administration, bid evaluations, shop drawings, and submittals review and approval), construction inspection and/or monitoring, design review, technical consultation, field surveys, engineering reports, and computer-aided drafting.

B.2 MINIMUM GUARANTEE

The Government will obligate the minimum guarantee of $1,000 with the first task order issued under this contract, as the minimum for the entire contract period, including all option periods, if exercised. Minimum and maximum ordering limits shall be in accordance with FAR 52.216-19, Order Limitations.

B.3 PRICE SCHEDULE

If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce.

For other specialized disciplines not listed below, rates and qualifications must be submitted and approved by the Government to be negotiated with each task order.

Note: The Government’s need for specialized disciplines are anticipated to be relatively minor in size.

Architect-Engineer Services

B.3.1 INITIAL PERIOD OF PERFORMANCE – 09/01/2020-08/31/2021

FIRM

LABOR DISCIPLINES

FULLY

BURDENED

RATE

BURDENED

RATE

Project Principal LEED Structural Engineer

Project Manager Senior Structural

Construction Manager Structural Engineer Construction Inspector Junior Structural

Specification Writer Structural Designer Clerical Structural CADD LEED Architect Plumbing Engineer Senior Architect Commissioning Engineer Architect Fire Protection Engineer Junior Architect Fire/Safety Engineer Architectural Designer Value Engineer Architectural CADD Senior Estimator LEED Mechanical

Engineer Estimator

Senior Mechanical Engineer

Senior Scheduler

Mechanical Engineer Scheduler Junior Mechanical

Engineer Land Surveyor

Mechanical Designer Landscape Architect Mechanical CADD

Operator BioContainment

Specialist

LEED Electrical

Certified Industrial Hygienist

Senior Electrical

Industrial Hygienist

Electrical Engineer Industrial Ventilation

Junior Electrical

Telecommunication & Data (RCDD)

Electrical Designer Interior Designer Electrical CADD

Operator Interior Assistant

LEED Civil Engineer Lab Planner Senior Civil Engineer Civil Engineer Junior Civil Engineer Civil Designer Civil CADD Operator

Architect-Engineer Services

B.3.2 OPTION YEAR 1 PERIOD OF PERFORMANCE – 09/01/2021-08/31/2022

BURDENED

RATE

LEED Architect Plumbing Engineer Senior Architect Commissioning Engineer Architect Fire Protection Engineer Junior Architect Fire/Safety Engineer Architectural Designer Value Engineer Architectural CADD Senior Estimator LEED Mechanical

Engineer Estimator

Senior Mechanical Engineer

Senior Scheduler

Mechanical Engineer Scheduler Junior Mechanical

Engineer Land Surveyor

Mechanical Designer Landscape Architect Mechanical CADD

Operator

Industrial Hygienist

Operator Interior Assistant

LEED Civil Engineer Lab Planner Senior Civil Engineer Civil Engineer Junior Civil Engineer

Architect-Engineer Services

B.3.3 OPTION YEAR 2 PERIOD OF PERFORMANCE – 09/01/2022-08/31/2023

BURDENED

RATE

LEED Architect Plumbing Engineer Senior Architect Commissioning Engineer Architect Fire Protection Engineer Junior Architect Fire/Safety Engineer Architectural Designer Value Engineer Architectural CADD Senior Estimator LEED Mechanical

Engineer Estimator

Senior Mechanical Engineer

Senior Scheduler

Mechanical Engineer Scheduler Junior Mechanical

Engineer Land Surveyor

Mechanical Designer Landscape Architect Mechanical CADD

Operator

Industrial Hygienist

Operator Interior Assistant

LEED Civil Engineer Lab Planner Senior Civil Engineer Civil Engineer Junior Civil Engineer

Architect-Engineer Services

B.3.4 OPTION YEAR 3 PERIOD OF PERFORMANCE – 09/01/2023-08/31/2024

BURDENED

RATE

LEED Architect Plumbing Engineer Senior Architect Commissioning Engineer Architect Fire Protection Engineer Junior Architect Fire/Safety Engineer Architectural Designer Value Engineer Architectural CADD Senior Estimator LEED Mechanical

Engineer Estimator

Senior Mechanical Engineer

Senior Scheduler

Mechanical Engineer Scheduler Junior Mechanical

Engineer Land Surveyor

Mechanical Designer Landscape Architect Mechanical CADD

Operator

Industrial Hygienist

Operator Interior Assistant

LEED Civil Engineer Lab Planner Senior Civil Engineer Civil Engineer Junior Civil Engineer

Architect-Engineer Services

B.3.5 OPTION YEAR 4 PERIOD OF PERFORMANCE – 09/01/2024-08/31/2025

BURDENED

RATE

LEED Architect Plumbing Engineer Senior Architect Commissioning Engineer Architect Fire Protection Engineer Junior Architect Fire/Safety Engineer Architectural Designer Value Engineer Architectural CADD Senior Estimator LEED Mechanical

Engineer Estimator

Senior Mechanical Engineer

Senior Scheduler

Mechanical Engineer Scheduler Junior Mechanical

Engineer Land Surveyor

Mechanical Designer Landscape Architect Mechanical CADD

Operator

Industrial Hygienist

Operator Interior Assistant

LEED Civil Engineer Lab Planner Senior Civil Engineer Civil Engineer Junior Civil Engineer

End of Section

Architect-Engineer Services

C - SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

AGAR 452.211-72 – Statement of Work/Specifications (Feb 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

(End of Clause)

AGAR 452.211-73 – Attachments to Statements of Work/Specifications (Feb 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

(End of Clause)

Architect-Engineer Services

D - SECTION D – PACKAGING AND MARKING

D.1 SPECIFICATIONS

Specification shall be prepared as specified in Section J, Attachment 1, Statement of Work, Architectural- Engineering Services (November 2019).

D.2 DRAWINGS

Drawings shall be prepared as defined in Section J, Attachment 1, Statement of Work, Architectural- Engineering Services (November 2019)

Architect-Engineer Services

E - SECTION E – INSPECTION AND ACCEPTANCE

E.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

AGAR 452.246-70 – Inspection and Acceptance (Feb 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at: individually, per each task order.

(End of clause)

E.2 FINAL INSPECTION

Each deliverable shall be reviewed by the Government to ensure compliance with the project requirements.

The Government may include, as part of its review, the services of another A-E firm to perform design review services and/or value engineering.

Acceptability of deliverables shall be based on the Government’s satisfaction that the Project Requirements specified in the task orders have been fulfilled in accordance with the terms and conditions of the basic contract and subsequent task order.

Architect-Engineer Services

F - SECTION F – DELIVERIES OR PERFORMANCE

F.1 EFFECTIVE PERIOD OF THE CONTRACT

The effective period of this contract is as follows:

Base Year: September 01, 2020 through August 31, 2021 Option Year 1: September 01, 2021 through August 31, 2022 Option Year 2: September 01, 2022 through August 31, 2023 Option Year 3: September 01, 2023 through August 31, 2024 Option Year 4: September 01, 2024 through August 31, 2025

F.2 CONTRACT CLAUSES INCLUDED BY REFERENCE

FAR 52.242-14 Suspension of Work (Apr 1984) FAR 52.242-15 Stop-Work Order (Aug 1989)

Architect-Engineer Services

G - SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION DEFINITIONS

The contract (and task orders) will be formally administered through the structure explained below. The delegation of authorities and responsibilities will be in accordance with ARS directives on acquisition responsibilities and authorities as outlined below.

Contracting Officer (CO): The CO is the legal Government representative to the Contractors. S/he is authorized to enter, administer, and terminate contracts on behalf of the Government. The CO is the only member of the Project team with the authority to obligate Government funds or change the contract. The CO is responsible for ensuring that the contract performance complies with all contractual provisions, including, but not limited to, scope, budget, and schedule. The CO is responsible for ensuring adequate contract performance and contract management, overseeing and conducting negotiations, and other actions necessary to protect the Government’s interest.

Contracting Officer’s Representative (COR): The assignment as COR is made at the beginning of the project by an official designation letter from the CO outlining the responsibilities, authority, and limitations. The COR is responsible for interpreting technical data in the A-E, construction, and CIC contracts. The COR is responsible for the review of progress and pay requests for these contracts and making acceptance/rejection recommendations to the CO. The COR may approve minor changes to the project that do not affect the program requirements, price, scope, and performance time of the contract.

Engineering Project Manager (EPM): Identified with each task order as the principal technical authority. The EPM will serve as the lead point of contact and shall disseminate information to the appropriate Project Team members for their action and involvement and also to the contractors for day-to-day business, working within the terms of the contract. It is the responsibility of the EPM to see that all Project Team members are kept advised of the actions, plans, and progress of the projects.

Research Program Representative (RPR): The RPR serves as a resource to the Project Team and is expected to notify the CO, EPM, and COR if s/he becomes aware of unusual or important circumstances pertinent to the construction project. The RPR has no responsibility for construction inspection or supervision.

Location Monitor (LM): The LM is an ARS representative at the construction site and is formally designated by the CO. The LM serves as a point of contact for the A-E, CIC, or the CC to provide information regarding location rules and regulations.

Facility Engineer (FE): The FE will provide assistance to the Project Team and is invited to participate in progress meetings, equipment testing, and final inspections. The FE may serve as the COR on some projects.

G.2 ARCHITECT-ENGINEER SELECTION UNDER INDEFINITE QUANTITY CONTRACTS

The following procedures shall apply only when multiple IQC awards have been made. In accordance with the Acquisition and Property Division (APD) Acquisition Alert 2016-01, placement of all task orders must be consistent with FAR 36.6, meaning that the Contracting Officer must:

1. Evaluate the entire pool of IQC awardees in accordance with Selection Criteria identified in FAR 36.602-1(a)(1)-(6).

2. Utilize an Evaluation Board and Functions in accordance with FAR 36.602-1 and 36.602-2.

3. Hold discussions after the evaluation with at least three (3) of the most highly rated firms.

4. Evaluation Board prepares a recommendation report for the Source Selection Authority (SSA).

5. SSA makes final selection decision.

6. CO conducts negotiations with selected firm in accordance with FAR Part 15.

Source Selection Authority FAR 36.602-4 states the selection authority will review the evaluation board recommendation and, with technical advice, make the final selection decision (listing of all firms in order of precedence).

Architect-Engineer Services

G.3 PAYMENTS UNDER INDEFINITE QUANTITY ARCHITECT-ENGINEER CONTRACTS

1. Payment terms will be negotiated with the contractor for each task order.

2. As agreed upon by the contractor and the Government, payment shall be made in accordance with one of the following methods:

a. FAR Clause 52.232-10, “Payments Under Fixed-Price Architect-Engineer Contracts” or

b. Payment submittal schedule where the contractor is authorized to request payment for the amount indicated in the task order “Price Schedule” upon completion and acceptance of each design submittal. The payment submittal schedule applies only to pre-design and design services. Any other services shall be paid in accordance with FAR Clause 52.232-10.

3. Prior to final payment under the Task Order, or prior to settlement upon termination of the Task Order, and as a condition precedent thereto, the A-E shall execute and deliver to the Contracting Officer a release of all claims against the Government arising under or by virtue of the task order other than such claims as the Contractor may exempt. The final payment request shall be accompanied by the Final Release Form, which shall contain the Contractor’s Corporate Seal. A corporate officer shall sign the release and be certified by a corporate secretary. The Contractor shall describe and state the amount of each excepted claim.

Release of Claims: Before final payment, the contractor must release the Government from claims. This release states:

“For and in consideration of the receipt of final payment in the amount of $__________ under and pursuant to Contract Number __________, the undersigned hereby releases the Government from any and all obligation whatsoever arising under said Contract.

Signature: __________________________ Date: __________”

G.4 CONTRACTOR PERFORMANCE INFORMATION AND CONTRACTOR

PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)

(a) General. Past performance evaluations shall be prepared at least annually and at the time the work under a contract or order is completed. Past performance evaluations are required for contracts and orders as specified in paragraphs (b) through (e) of this section, including contracts and orders performed outside the United States. These evaluations are generally for the entity, division, or unit that performed the contract or order. Past performance information shall be entered into CPARS, the Government wide evaluation reporting tool for all past performance reports on contracts and orders. Instructions for submitting evaluations into CPARS are available at http://www.cpars.gov/.

(b) The Government will register each contractor in the CPARS system at time of award. This registration will require that contractors provide the Contracting Officer the name of the company’s primary contact, Contractor Representative (CR), and who will be authorized access to the evaluation for review and comment. In addition, the contractor will be required to identify a secondary contract who will be responsible for notifying the Contracting Officer in the event the primary contact is unavailable to process the evaluation within the required 60-day time period. Once the contractor is registered and a performance evaluation has been prepared and is ready for comment, the CPARS system will send an email to the CR notifying that individual that a performance evaluation is electronically available for review and comment.

(c) Contractors will access evaluation through a secure website for review and comment at the following site, http://www.cpars.gov.

(d) Interim and final evaluations will be available to the contractor in the CPARS system and notification from the CPARS system will be sent to the contractor. The final performance evaluation will be entered in the CPARS system at the time of completion of the contract. Any disagreement between the parties regarding an evaluation will be referred to an individual one level above the Contracting Officer, whose decision is final.

(e) Past performance evaluations shall be prepared for each architect-engineer services contract of $35,000 or more and for each architect-engineer services contract that is terminated for default regardless of contract value. Past performance evaluations may also be prepared for architect-engineer services contracts below $35,000.

http://www.cpars.gov/ http://www.cpars.gov/

Architect-Engineer Services

G.5 6% FEE LIMITATION

For architect-engineer services for public works or utilities, the contract price or the estimated cost and fee for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent of the estimated cost of construction of the public work or utility, excluding fees.

Architect-Engineer Services

H - SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

AGAR 452.236-73 – Archaeological or Historic Sites (Feb 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

(End of clause)

AGAR 452.236-80 – Firms Ineligible for Award—Construction (Nov 1996)

The firm(s) and its subsidiaries or affiliates signatory to this contract shall be ineligible for award of any construction contract resulting from the design work performed under this contract.

(End of clause)

AGAR 452.237-74 – Key Personnel (Feb 1988)

(a) The contractor shall assign to this contract the following key personnel:

Project Executive/Principal (Signatory Authority) Project Manager Senior Architect Senior Structural Engineer Senior Civil Engineer Senior Mechanical Engineer Senior Electrical Engineer

(b) During the first ninety (90) days of performance, the contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-period, the contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the person(s) being replaced. The Contracting Officer will notify the contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.2 CONTRACT CLAUSES INCLUDED BY REFERENCE

FAR 52.236-22 Design Within Funding Limitations (Apr 1984) FAR 52.236-23 Responsibility of the Architect-Engineer Contractor (Apr 1984) FAR 52.236-24 Work Oversight in Architect-Engineer Contracts (Apr 1984) FAR 52.236-25 Requirements for Registration of Designers (Jun 2003)

H.3 SUBCONTRACTORS, OUTSIDE ASSOCIATES, AND CONSULTANTS

TASK ORDER KEY PERSONNEL

o During negotiations of each task order, key personnel shall be identified by the contractor. No substitutions shall be made without the written approval of the Contracting Officer.

o The contractor shall submit resumes for the proposed substitutes in advance of the occurrence, where possible, or no later than 15 calendar days after the substitutions. Additional information applicable thereto shall be included in the submission to the Contracting Officer. Proposed substitutes shall have comparable qualifications to those persons being replaced.

Architect-Engineer Services o The Contracting Officer will provide written notification to the contractor within 15 calendar days after receipt of all required data of the decision on the substitutions.

SUBCONTRACTOR KEY PERSONNEL

During negotiations of each task order, subcontractor key personnel shall be identified by the contractor. The contractor shall provide written notification to the Contracting Officer of substitutions in advance of the occurrence, where possible, or no later than 15 calendar days after the substitutions.

H.4 BIOBASED PRODUCTS

The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA Bio-Preferred’s minimum bio-based content level. Visit the BioPreferred web site https://biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.

H.5 ENERGY EFFICIENCY

As required in clause 52.223-15 Energy Efficiency in Energy-Consuming Products, the contractor shall only provide products that earn the ENERGY STAR label and meet ENERGY STAR specifications for energy efficiency. The contractor is encouraged to visit http://www.energystar.gov for complete product specifications and updated lists of qualifying products.”

http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml https://biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1194323 http://www.energystar.gov/

Architect-Engineer Services

I - SECTION I – CONTRACT CLAUSES/PROVISIONS

I.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT

FAR 52.204-21 – Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)

(a) Definitions. As used in this clause–

“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

“Safeguarding” means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

i. Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

ii. Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

iii. Verify and control/limit connections to and use of external information systems.

iv. Control information posted or processed on publicly accessible information systems.

v. Identify information system users, processes acting on behalf of users, or devices.

vi. Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

vii. Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

viii. Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

ix. Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

x. Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

xi. Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

xii. Identify, report, and correct information and information system flaws in a timely manner.

xiii. Provide protection from malicious code at appropriate locations within organizational information systems.

xiv. Update malicious code protection mechanisms when new releases are available.

xv. Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

Architect-Engineer Services

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of Clause)

FAR 52.216-18 – Ordering (Oct 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from September 01, 2020 through August 31, 2025.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of Clause)

FAR 52.216-19 – Order Limitations (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $1,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The contractor is not obligated to honor-

(1) Any order for a single item in excess of $4,000,000.00;

(2) Any order for a combination of items in excess of $20,000,000.00; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph

(b) of this section.

(d) Notwithstanding paragraphs(b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of Clause)

FAR 52.216-22 – Indefinite Quantity (Oct 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

Architect-Engineer Services

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after completion of the work/option issued during the effective period of this contract for negotiated options not exercised by the Government within 30 days of the previously completed and accepted work/option.

(End of Clause)

FAR 52.217-8 – Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

(End of Clause)

FAR 52.217-9 – Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days;

provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

(End of Clause)

FAR 52.219-13 – Notice of Set-Aside of Orders (Nov 2011)

The Contracting Officer will give notice of the order or orders, if any, to be set aside for small business concerns identified in 19.000(a)(3) and the applicable small business program. This notice, and its restrictions, will apply only to the specific orders that have been set aside for any of the small business concerns identified in 19.000(a)(3).

FAR 52.222-35 – Equal Opportunity for Veterans (Oct 2015)

(a) Definitions. As used in this clause--

“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.

https://www.acquisition.gov/?q=/browse/far/22

Architect-Engineer Services

FAR 52.222-36 – Equal Opportunity for Workers With Disabilities (Jul 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

FAR 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA Designated Items (May 2008)

(a) Definitions. As used in this clause-

“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall-

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to TBD.

FAR 52.223-20 – Aerosols (Jun 2016)

“Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide’s global warming potential is defined as 1.0.

“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables of alternatives available at (http://www.epa.gov/snap/).

“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.

(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, or emissions of high global warming potential hydrofluorocarbons, when feasible, from aerosol propellants or solvents under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as–

(1) In-use emission rates, energy efficiency;

(2) Safety, such as flammability or toxicity;

http://www.epa.gov/snap/

Architect-Engineer Services

(3) Ability to meet technical performance requirements; and

(4) Commercial availability at a reasonable cost.

(c) The Contractor shall refer to EPA's SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables available at http://www.epa.gov/snap/.

(End of Clause)

FAR 52.223-21 – Foams (Jun 2016)

“Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide’s global warming potential is defined as 1.0.

“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables of alternatives available at (http://www.epa.gov/snap/).

“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.

(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, and emissions of high global warming potential hydrofluorocarbons and refrigerant blends containing hydrofluorocarbons, when feasible, from foam blowing agents, under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as–

(1) In-use emission rates, energy efficiency, and safety;

(2) Ability to meet performance requirements; and

(3) Commercial availability at a reasonable cost.

(c) The Contractor shall refer to EPA’s SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables available at http://www.epa.gov/snap/.

(End of Clause)

FAR 52.252-2 – Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.htm

(End of Clause)

AGAR 452.216-73 – Minimum and Maximum Contract Amounts (Feb 1988)

During the period specified in FAR clause 52.216-18, Ordering, the Government shall place orders totaling a minimum of $1,000.00 but not in excess of $20,000,000.00.

(End of Clause)

AGAR 452.224-70 – Confidentiality of Information (Feb 1988)

(a) Confidential information, as used in this clause, means –

(1) information or data of a personal nature, proprietary about an individual, or

(2) information or data submitted by or pertaining to an organization.

http://www.epa.gov/snap/ http://www.epa.gov/snap/ http://www.epa.gov/snap/ https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.htm

Architect-Engineer Services

(b) In addition to the types of confidential information described in (a)(1) and (2) above, information which might require special consideration with regard to the timing of its disclosure may derive from studies or research, during which public disclosure of primarily invalidated findings could create an erroneous conclusion which might threaten public health or safety if acted upon.

(c) The Contracting Officer and the Contractor may, by mutual consent, identify elsewhere in this contract specific information and/or categories of information which the Government will furnish to the Contractor or that the Contractor is expected to generate which is confidential. Similarly, the contracting Officer and the Contractor may, by mutual consent, identify such confidential information from time to time during the performance of the contract. Failure to agree will be settled pursuant to the "Disputes" clause.

(d) If it is established that information to be utilized under this contract is subject to the Privacy Act, the Contractor will follow the rules and procedures of disclosure set forth in the Privacy Act of 1974, 5 U.S.C. 552a, and implementing regulations and policies, with respect to systems of records determined to be subject to the Privacy Act.

(e) Confidential information, as defined in (a)(1) and (2) above, shall not be disclosed without the prior written consent of the individual, institution or organization.

(f) Written advance notice of at least 45 days will be provided to the Contracting Officer of the Contractor's intent to release findings of studies or research, which have the possibility of adverse effects on the public or the Federal agency, as described in (b) above. If the Contracting Officer does not pose any objections in writing within the 45 day period, the contractor may proceed with disclosure. Disagreements not resolved by the Contractor and Contracting Officer will be settled pursuant to the "Disputes" clause.

(g) Whenever the Contractor is uncertain with regard to the proper handling of material under the contract, or if the material in question is subject to the Privacy Act or is confidential information subject to the provisions of this clause, the Contractor shall obtain a written determination from the Contracting Officer prior to any release, disclosure, dissemination, or publication.

(h) The provisions of paragraph (e) of this clause shall not apply when the information is subject to conflicting or overlapping provisions in other Federal, State or local laws.

(End of Clause)

AGAR 452.228-71 – Insurance Coverage – Alt I (Nov 1996)

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in…