Duct Bank Clarification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs.pdf | ||
| 12505B19R0003_Amend_3.pdf | ||
| 26_13_14_-_PAD_MOUNTED_MEDIUM_VOLTAGE_SWITCHGEAR.pdf | ||
| DUCT_BANK_DETAIL_(2x1).pdf | ||
| Q&A.pdf | ||
| ADDEN_1_20190722.pdf | ||
| 12505B19R0003_Amend_02.pdf | ||
| Site_Visit_Sign-In_June_25.pdf | ||
| Site_Visit_Sign-In_June_27.pdf | ||
| 12505B19R0003_Amendment_01.pdf | ||
| ARS371.pdf | ||
| SOW-North_Campus_Electric_Disribution_Upgrade.pdf | ||
| 12505B19R0003.pdf | ||
| Wage_Determination.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| ARS372.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1: The bottom left call out states “4” minimum compacted aggregate base. [precast pads on undisturbed earth under each spacer].” Is the contractor required to install compacted aggregate base and/or precast concrete pads under duct spacers?
Typically, duct bank spacers are placed directly on undisturbed earth.
Answer: Yes. Install per detail.
Question 2: Is the #4 rebar in the duct bank detail continuous for all duct bank, including in grassed areas, or just under pavement?
Answer: Continuous for all duct bank, including grassed areas.