Duct_Bank_Clarification.pdf

PDF 69 KB Posted

Attached to
North Campus Electric Distribution Upgrade Federal contract opportunity
Solicitation number
12505B19R0003
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

Duct Bank Clarification

View the file

Other files for this federal contract opportunity

Other files attached to North Campus Electric Distribution Upgrade, newest first.
File Type Posted
RFIs.pdf PDF
12505B19R0003_Amend_3.pdf PDF
26_13_14_-_PAD_MOUNTED_MEDIUM_VOLTAGE_SWITCHGEAR.pdf PDF
DUCT_BANK_DETAIL_(2x1).pdf PDF
Q&A.pdf PDF
ADDEN_1_20190722.pdf PDF
12505B19R0003_Amend_02.pdf PDF
Site_Visit_Sign-In_June_25.pdf PDF
Site_Visit_Sign-In_June_27.pdf PDF
12505B19R0003_Amendment_01.pdf PDF
ARS371.pdf PDF
SOW-North_Campus_Electric_Disribution_Upgrade.pdf PDF
12505B19R0003.pdf PDF
Wage_Determination.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
ARS372.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: The bottom left call out states “4” minimum compacted aggregate base. [precast pads on undisturbed earth under each spacer].” Is the contractor required to install compacted aggregate base and/or precast concrete pads under duct spacers?

Typically, duct bank spacers are placed directly on undisturbed earth.

Answer: Yes. Install per detail.

Question 2: Is the #4 rebar in the duct bank detail continuous for all duct bank, including in grassed areas, or just under pavement?

Answer: Continuous for all duct bank, including grassed areas.