This is a Statement of Work (SOW) for floor repair and recoating services at the USDA Eastern Regional Research Center (ERRC) Mechanical Services Building in Wyndmoor, Pennsylvania. The contractor shall provide all labor and materials to repair and recoat flooring on the second floor laboratory, addressing damaged epoxy coating that no longer meets BSL-2 laboratory sanitation requirements. The scope encompasses approximately 2,700 square feet of floor area and approximately 450 linear feet of cove base. Work includes surface preparation per manufacturer specifications, treatment of cracks and control/expansion joints, application of a pure epoxy base coat, and installation of a chemical-resistant polyaspartic finish coat with non-skid texturing additive. All finishes must meet UFGS 09 67 23.14 Chemical Resistant Resinous Floors standards and withstand repeated washdown cleaning with chlorinated cleansers and disinfectants. The contractor must warranty all materials and labor for a minimum of one year.

Work shall be performed during normal business hours (Monday through Friday, 7:30 AM to 3:00 PM) and completed within 60 days after contract award (DAC). Color selection will be determined during material submittal. All contractors and subcontractors must present picture identification for security badge issuance at the main lobby and are authorized access only to areas designated by the Contracting Officer's Representative or Facility Contractor. This is a Total Small Business Set-Aside acquisition under NAICS code 238330 Flooring Contractors with a small business size standard of $19.0 million, issued as Request for Quotation (RFQ) 124PCA27Q0008.

View the file

Other files

File Type Posted
C04_SOWv2.docx DOCX document
C04_Sol_124PCA27Q0008.pdf PDF
C04_Wage Determination.pdf PDF
C04_Drawing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

ERRC Mechanical Services Building Environmental Box Machinery Mods Statement of Work

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Deliverables / Schedule3
5.0 Security3

Project USDA, Eastern Regional Research Center, Wyndmoor, PA, Mechanical Services Building Environmental box Machinery Mods

General Information

1.0 Scope of Work

The Eastern Regional Research Center (ERRC), 600 East Mermaid Lane, Wyndmoor Pa requires repairs and recoating of flooring in the Mechanical Services Building (MSB) second floor laboratory. The existing epoxy floor coating is damaged and no longer meets the sanitary requirement for a BSL-2 laboratory. The work includes preparing existing floor and cove base surfaces for recoating, treating cracks, control and expansion joints, applying a base coat of pure epoxy and a chemical resistant polyaspartic finish coat with a texturing additive providing a non-skid surface.

2.0 Background

The Eastern Regional Research Center (ERRC) is one of four Regional Research Centers of the Agricultural Research Service, U.S. Department of Agriculture. The ERRC is home to the nation’s leading scientists and engineers who solve problems facing the U.S. today and tomorrow with fundamental, applied, and developmental research on agricultural commodities. Most of this research is conducted in the main building within two laboratory wings. The original building was constructed in 1940. Due to continuous upgrades and renovations, ERRC is very modern with respect to laboratory design and system condition.

Contractor Requirements

3.0 Technical Requirements / Tasks

1. The contractor shall provide all labor and materials to recoat floors identified in Atch 2, MSB Floor Repair Mods. Existing surfaces shall be prepared in accordance with manufacturer’s recommendations. Finishes shall meet sanitation requirements for a BSL-2 laboratory and withstand repeated washdown cleaning with chlorinated cleansers and disinfectants.

2. Floor area to be recoated is approximately 2700 SF with approximately 450 linear feet of cove base.

3. All work shall meet the requirements of UFGS 09 67 23.14 Chemical Resistant Resinous Floors.

4. Color to be determined during material submittal.

4.0 Deliverables / Schedule

1. The contractor shall provide and install epoxy and polyaspartic coatings in areas identified in Atch 2.

2. The contractor shall warranty material and labor for a period not less than one year.

Project shall be completed during normal business hours, Monday thru Friday, 7:30AM-3:00PM. The work shall be completed within 60 DAC

5.0 Security

1. Contractors and their Subcontractors shall provide a picture ID to Security at the main lobby before visitor badges are issued, unless a site badge or linkpass has been approved.

2. Contractors and their subcontractors shall be allowed access to only those areas authorized by the Contracting Officer’s Representative (COR) or Facility Contractor.