This is a Request for Quotation (RFQ) for commercial construction services issued by the U.S. Department of Agriculture (USDA) Office of Construction and A&E Division. The solicitation seeks qualified contractors to perform MSB Laboratory Floor Coating Repairs at the NEA Eastern Regional Research Center in Wyndmoor, Pennsylvania. The scope of work involves providing all labor and materials to re-coat approximately 2,700 square feet of floor area with approximately 450 linear feet of cove base. This is a Total Small Business set-aside competition under NAICS code 238330 (Flooring Contractors). The solicitation number is 124PCA27Q0008, with offers due December 1, 2026, at 0630 hours local time. A mandatory site visit is scheduled for November 17, 2026, at 10:00 AM EST, with registration required by November 16, 2026, at 12:00 PM EST. The performance period is 10 calendar days to begin work after receiving the notice to proceed and 90 calendar days to complete all work after award. A bid bond is required in an amount not less than 20 percent of the proposed price but not exceeding $3,000,000. Performance and payment bonds are required within 10 calendar days after award.

Award will be made to a single contractor representing the lowest priced, technically acceptable offer using Lowest Priced Technically Acceptable (LPTA) evaluation methodology. Offerors must submit a completed SF 1442, acknowledgment of all amendments, SF 24 Bid Bond, transmittal summary letter with point of contact and SAM UEI Number, and documented experience through at least two references demonstrating recent (past five years) and relevant epoxy flooring projects of similar size, scope, function, and complexity. The Government intends to award a firm fixed-price contract. Questions must be submitted by November 19, 2026, at 0900 AM Central Time, and all Requests for Information are due by the same date. Invoicing requires submission through the U.S. Department of Treasury Invoice Processing Platform (IPP) at www.ipp.gov after Contracting Officer approval. The contractor must comply with numerous FAR and AGAR clauses including construction wage rate requirements, Buy American requirements for construction materials, employment eligibility verification, and reporting of biobased products, among other federal contracting requirements.

View the file

Other files

File Type Posted
C04_SOWv2.docx DOCX document
C04_SOW.docx DOCX document
C04_Wage Determination.pdf PDF
C04_Drawing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1178606

OCP, CONSTRUCTION AND A&E DIVISION

2300 MAIN STREET

SUITE 6NE

KANSAS CITY MO 64108

124PCA

DAVID REYNOLDS 970-851-3646

111/09/2026

124PCA27Q0008

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

A. Project Title: MSB Lab Floor Coating Repairs

B. Competition is set aside for Total Small Business. Applicable NAICS code is

238330, Flooring Contractors.

C. Prospective offerors shall be registered with the Systems for Awards Management

(SAM), with an active registration at the time of solicitation closing.

D. All Requests for Information (RFIs) shall be submitted no later than 11/19/2026 at 0900 CST. RFIs received after this date/time will not be answered.

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 90 calendar days and complete it within ________________ ________________ calendar days after receiving

12/01/2026

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

OCP, CONSTRUCTION AND A&E DIVISION

2300 MAIN STREET

SUITE 6NE

KANSAS CITY MO 64108

124PCA

DAVID W. REYNOLDS

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 24

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

124PCA27Q0008

Delivery: 90 Days After Notice to Proceed

Delivery Location Code: ARS-123JL0

NEA EASTERN REGIONAL RESEARCH CENTE

600 EAST MERMAID LANE

WYNDMOOR PA 19038 US

0001 ERRC MSB laboratory Floor Coating Repairs

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

MSB Lab Floor Coating Repairs

124PCA27Q0008

Statement of Requirement - The project consists of providing all labor and materials to re-coat floors. Floor area to be recoated is approximately 2700 SF with approximately 450 linear feet of cove base.

Technical Data - Technical data and supporting documentation associated with this solicitation are available through the following sources:

1. Solicitation Attachments The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting.

C04 – Statement of Work C04 – Drawing C04 – Wage Determination

Project Location

NEA EASTERN REGIONAL RESEARCH CENTE

600 EAST MERMAID LANE

WYNDMOOR PA

Definitization of Equitable Adjustments for Change Orders

Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA under “Federal Acquisition Regulation 36.101-4”. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in AGAR

443.304 -70.

Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.

Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4

This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:

(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).

(d) Changes. Changes will be handled in accordance with the following FAR clause(s):

☒ FAR 52.243-4, Changes (Nov 2025) ☒ FAR 52.243-5, Changes and Changed Conditions (Nov 2025)

(o) Warranty. FAR 52.246-21, Warranty of Construction is applicable to this contract.

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)

☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)

☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable if checked:

☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☒ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☐ 52.204-91 Contractor identification (Nov 2025) ☐ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☐ 52.209-9 Updates of Publicly Available Information Regarding Responsibility

Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)

☐ Alternate I (Mar 2020).

☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)

☐ Alternate III (Nov 2025) of 52.219-9.

☐ Alternate IV (Nov 2025) of 52.219-9

☐ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) ☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☐ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☐ 52.222-35 Equal Opportunity for Veterans (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-36 ☐ 52.222-37 Employment Reports on Veterans (Nov 2025) ☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☐ 52.222-41 Service Contract Labor Standards (Aug 2018) ☐ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

This Statement is for Information Only:

It is not a Wage Determination

Employee Class Monetary Wage -- Fringe Benefits

☐ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ☐ 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) ☐ 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ☐ 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (Nov 2025) ☒ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026)

☒ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov 2025) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

☐ Alternate I (May 2008) of 52.223-9 ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☒ 52.223-23 Sustainable Products and Services (Nov 2025) ☐ 52.224-3 Privacy Training (Jan 2017)

☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025)

☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)

☐ Alternate II (Nov 2025) of 52.225-3.

☐ Alternate III (Nov 2025) of 52.225-3.

☐ Alternate IV (Oct 2022) of 52.225-3

☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020) ☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025)

☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025) ☐ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)

☐ Alternate I (Apr 2023) of 52.247-64.

☐ Alternate II (Nov 2021) of 52.247-64

The Contractor shall comply with the following FAR Clauses for Commercial Construction.

52.222-6 Construction Wage Rate Requirements (Nov 2025) 52.222-7 Withholding of Funds (Nov 2025) 52.222-8 Payrolls and Basic Records (Nov 2025) 52.222-9 Apprentices and Trainees (Nov 2025) 52.222-10 Compliance with Copeland Act Requirements (Nov 2025) 52.222-11 Subcontracts (Labor Standards) (Nov 2025) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.

(May 2014) 52.222-14 Disputes Concerning Labor Standards (Nov 2025) 52.222-15 Certificate of Eligibility (May 2014) 52.236-5 Material and Workmanship (Jul 2025)

The following clauses are applicable when checked:

☐ 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method (Aug 2018) ☐ 52.222-31 Construction Wage Rate Requirements-Price Adjustment (Percentage Method) (Aug 2018) ☐ 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) (Nov 2025) ☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☐ Alternate I (Oct 2022) of 52.25-9 ☐ 52.225-11 Notice of Buy American Requirement-Construction Materials under Trade Agreements (Nov 2025) ☐ Alternate I (Nov 2025) (of 52.225-11 ☐ Alternate II (Oct 2022) of 52.225-11 ☐ 52.228-2 Additional Bond Security (Oct 1997) ☐ 52.228-5 Insurance-Work on Government Installation (Jan 1997) ☐ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☐ 52.228-13 Alternative Payment Protections (Jul 2020) ☐ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☐ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☐ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☒ 52.236-2 Differing Site Conditions (Jul 2025) ☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☒ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☒ 52.236-8 Other Contracts (Jul 2025) ☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Jul 2025)

☒ 52.236-10 Operations and Storage Areas (Jul 2025) ☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☒ 52.236-13 Accident Prevention (Jul 2025) ☐ Alternate I (Nov 1991) of 52.236-13 ☒ 52.236-14 Availability and Use of Utility Services (Jul 2025) ☐ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☐ 52.236-16 Quantity Surveys (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-16 ☒ 52.236-17 Layout of Work (Jul 2025) ☐ 52.236-21 Specifications and Drawings for Construction (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-21 ☐ Alternate II (Apr 1984) of 52.236-21 ☒ 52.242-14 Suspension of Work (Apr 1984) ☐ 52.248-3 Value Engineering (Oct 2025) ☐ Alternate I (Apr 1984) of 52.248-3

Other Applicable Clauses

AGAR Clauses This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf

AGAR 452.203-70 Unenforceable Supplier Terms (Sep 2026)

AGAR 452.204–70 Modification for Contract Closeout (Apr 2026)

AGAR 452.204‑71 Personal Identity Verification and Workforce Integrity of Contractor Employees (Apr 2026)

AGAR 452.232-71 Progress Payments for Commercial Construction Contracts (May 2026)

AGAR 452.236-70 Electronic Submission of Payment Requests (Sep 2026)

Special Contract Requirements

1. Directives, Instructions and References: Only the Contracting Officer shall issue directives/instructions defining the roles and responsibilities and appointment of a Contracting Officer Representative (COR); Location Monitor (LM); Project Manager (PM); Occupational Health & Safety Manager and/or any other functional appointment as deemed necessary for the scope of work.

2. Work Management: The Contractor shall manage the total work effort associated with the services required to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.

3. Materials and Equipment: Materials and equipment may not be stored at the job-lay-down area after work hours unless approved in advance by the Contracting Officer. There will not be office space available at any location. All job site lay down areas are dependent upon the size and location of the work. Job site availability will be identified in the Scope of Work.

4. Service Interruptions/ Utility Outages: If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the Contracting Officer Representative ten calendar days in advance to allow notification of affected tenants and customers. If the discontinued service is due to an emergency breakdown the Contractor shall notify the Contracting Officer Representative as soon as practicable.

At a minimum, include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Once approved, and prior to beginning work on the utility system requiring shut down, attend a pre- outage coordination meeting with the Contracting Officer to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.

5. OSHA: Contractor must maintain a workplace and ensure that workplace conditions conform to applicable OSHA standards.

6. Prime Contract Site Superintendence: The Contractor shall provide an on-site superintendent on this contract. The site superintendent shall be employed and work directly for the Prime Contractor. On-site representation from the prime contractor during construction activities is mandatory, regardless of the type/magnitude of the work being performed by subcontractors. The prime contractor site superintendent may have other duties and may hold “dual hat” responsibilities, but superintendent duties are the first priority of the superintendent.

7. Employee Requirements: The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Competent personnel shall be provided as required by the contract. Contractor staff may be required to obtain a USDA Linc Pass badge. Contractors shall adhere to the most current USDA access or badging requirements.

Documents need to obtain the Linc Pass shall be provided by the Government after award, if required.

8. Employee Conduct/ Removal of Employees: Contractor employees and Subcontractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner. The Contractor shall remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of Agricultural Research Service. The Contracting Officers decision is final and not negotiable.

Additionally, reference FAR 52.236-5 Material and Workmanship “The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.”

9. Final Inspection:

a. A final inspection shall be made only when all the materials have been furnished, all the work has been performed, and all the construction provided for by the contract has been completed in accordance with the terms, conditions, specifications, and drawings set forth in this contract. If, upon examination by the Contracting Officer, his/her designated representative, and Government inspection personnel, the project is determined not sufficiently completed to have warranted a final inspection, the Contractor may be held financially liable for any additional cost of re-inspection when material and workmanship are not ready at the time specified by the Government for project inspection.

b. Contractor shall give the Contracting Officer ten (10) calendar days advance notice, in writing, of the date the work will be fully completed and ready for final inspection.

c. The Contracting Officer will notify the Contractor of any discrepancies and/or omissions noted at the final inspection by providing a "punchlist" as to the discrepancies/omissions, replacement of materials and performance or re-performance of any unsatisfactory work necessary for final acceptance. This notification shall not in any way be deemed an extension of the contract completion date. If all construction required by the contract is found completed and all contractual documents (i.e. payrolls, shop/as-builts/red-line drawings, release from claims, etc.) have been submitted, the Contracting Officer shall notify the Contractor of such in writing by processing the final payment for the project.

d. Acceptance shall be final and conclusive, except for latent defects, fraud, or such gross mistakes as may amount to fraud, or regarding the Government’s right under any warranty or guarantee.

10. Final Acceptance: Upon written notification that all deficiencies identified during the final inspection have been corrected, the Contracting Officer will schedule a final acceptance inspection of the work. If all construction required by the contract is determined to be complete and all requisite contract deliverables (e.g., certified payroll records, as- built drawings, warranty documents, etc.)

have been submitted and approved by the Government, the Contracting Officer shall notify the Contractor in writing of such acceptance. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

11. As-Built Drawings: On completion of the contract (if required), one set of paper specifications, and one hard copy and one set of digital PDF or AutoCAD format of each of the contract drawings accompanying those specifications shall be neatly and clearly marked in red to show all variations between the construction actually provided and that indicated or specified and delivered to the CO. Where a choice of materials and/or methods is permitted, the as-built drawings shall define the construction actually provided. Representation of such variation shall conform to standard drafting practice and include such supplementary notes, legends and details as may be necessary. The contractor shall stamp the term RECORD DOCUMENTS, date and sign all plastic reproducible, drawings and volumes of marked specifications. Legibility and clear portrayal of the as-built construction and marked prints shall be subject to approval by the Contracting Officer with the recommended approval of the Engineer.

12. Invoice Preparation and Submission: Based upon acceptance of required contract deliverables, the contractor shall submit an original invoice and one copy to the Contracting Officer and the COR:

The contractor shall include the following information on each invoice in order to be considered a proper invoice:

Name and address of contractor. Invoice number and Invoice date. Contract number.

Description of work and period of performance.

Name, title, phone number, and complete mailing address of official to whom payment is to be sent.

Name, title, phone number, and complete mailing address of person to notify in the event of a defective invoice.

Taxpayer Identification Number (TIN) and SAM UEI Number.

Invoices must be submitted with ARS-371 and ARS-372, along with certified payroll records, Contractor certification, and updated CPM Schedule.

Once the paper invoice has been approved by the Contracting Officer, the Contractor shall submit the invoice electronically through the U.S. Department of Treasury Invoice Processing Platform (IPP) at www.ipp.gov. This is a mandatory requirement.

13. State Taxes and State Tax Exemptions: The Contractor is responsible to include any state taxes into the contract pricing as necessary. The Contractor shall be responsible for knowing the state tax exemption process for the state in which they are proposing. The USDA will not navigate the process or seek out guidance/clarification for the state tax exemption process. The USDA will limit their involvement in the state tax exemption process to simple signature approval of documents and/or submission of Contractor completed documents to an email address, etc. Contractor shall include the state taxes into their proposed offer pricing as necessary. The USDA will not entertain any request for equitable adjustment based upon state tax requirements.

14. Payments for Stored Materials Under Construction Contracts: Payment to a contractor for stored materials is approved on a case-by-case basis, but certain conditions must first be met. Stored material considered acceptable for payment would include equipment and/or material of large dollar value and that will be incorporated into the specific project, such as boilers, transformers, windows, concrete block, brick, steel, etc. Smaller items, such as screws, nails, wiring, conduit, fittings, fasteners, and other items that are readily available from suppliers or other materials that are delivered on an ongoing basis, are not eligible for payment as stored material off-site.

a. Stored Materials on the Job Site: In order to be eligible for payment for materials stored on the job site, the contractor must provide the following to the CO:

1. Identify the specific materials, including a full description, manufacturer, model numbers, quantity, etc.;

2. Demonstrate clear title to the material (e.g., submission of paid invoice(s)); and,

3. Provide a written acknowledgement that they, the construction contractor, are fully responsible and liable for the security of the materials.

The CO does not have to modify the contract to authorize payment for stored materials on the job site; however, the materials and their value must be itemized on the ARS Form 372, Contractor’s Request for Payment Transmittal. The Contracting Officer’s Representative (COR) or other personnel designated by the CO (e.g., Resident Inspector) must verify the presence and quantity of the materials on site to the CO.

b. Stored Materials Off-Site: Payment for material delivered to the Contractor at off-site location(s) is authorized in accordance with FAR Clause 52.232-5 (b)(2) (however this is under the sole discretion of the Contracting Officer who will either approve or disapprove payments for stored materials off-site, the Contractor is not entitled to payments for stored material off-site); provided, the Contractor fully complies with the following conditions:

1. Contractor furnishes evidence to the Contracting Officer that it has acquired title to such material (e.g., paid invoice(s), bill(s) of sale, etc.);

2. Contractor fully identifies the material (description, manufacturer, model number, quantities, etc.) in storage and certifies that said material will be used to perform this contract;

3. Contractor furnishes the exact location of the storage facility and material within it;

4. Contractor furnishes evidence that the storage facility is bonded and insured;

5. Contractor furnishes a written certified acknowledgment from the storage facility that they recognize the USDA Agricultural Research Service, as the owner of the materials;

6. Contractor provides written acknowledgment that it is fully responsible and liable for the security of the materials; and,

7. Contractor furnishes photographs of the material and the storage facility. The contractor must include on each invoice the address of the storage facility and an itemized breakdown of the stored materials. Only the cost for the materials will be paid. The cost for installation must be excluded from the invoiced amount since it will occur at a later time. The costs associated with storing the materials in a storage facility (e.g., rent, lease, etc.) shall not be charged to or paid for by the Government.

Payment for stored materials off-site shall be made only when in the best interest of the Government (USDA). The Contracting Officer has the sole authority to make this decision in which payment(s) will or will not be made for stored materials off-site. At no time will the Contractor have any “right” to demand payment for stored materials off-site.

15. Daily Construction Reports: The Contractor shall maintain a daily record of quality control measures performed for each shift of Contractor or Subcontractor operations on an appropriate format. These records shall provide factual evidence that continuous quality control inspections have been performed, including but not limited to the following: job progress, problems encountered;

problems resolved; type and number of inspections; results of inspections or tests including all computations; nature of defects; causes for rejection; safety violations; proposed remedial action;

and corrective action taken. These records shall cover both conforming and defective items and shall include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. The Contractor shall maintain a current record of all inspections and shall furnish to the Contracting Officer on a daily basis (or as often as agreed upon with the Contracting Officer), legible copies of all inspection records for his permanent retention. The daily records of inspections shall cover all work placement subsequent to the previous report, and shall be verified by the Contractor's designated representative.

16. Use of Premises: Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. Unless accepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the workforce at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

17. Control of Erosion, Sedimentation and Pollution: Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, and impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.

18. Key Personnel: The Contractor shall assign to this contract the following key personnel: Site Superintendent and Project Manager

19. Submittals and Shop Drawings: The Contractor shall submit for approval (if required), copies (minimally) of shop drawings of all manufactured products required in the construction for which such drawings are required. When approved, the Government will forward one set to the Contracting Officer's Representative (COR), one set to the Construction Manager (CM), and one set to the Contractor. If the Contractor requires more than one approved set, additional copies of this document must be forwarded in the number needed.

Shop drawings and submittals shall be marked with the Purchase Order Number, Project Description, Name of the Contractor, and accompanied by a letter of transmittal. If the shop drawings show variations from the contract requirements because of standard shop practice or other reasons, the Contractor shall make specific mention of such variations in his/her letter of transmittal or directly on the drawing/submittal.

Approval of shop drawings will be general and will not relieve the Contractor of the responsibility of furnishing material and work required by the contract.

Shop drawings shall be submitted for approval in ample time to permit checking of the drawings, allow the Contractor to make any corrections and resubmit drawings prior to the time construction is started on work covered by any drawings.

Non-approval of equipment due to failure to meet specifications or non-approval of the Contractor's drawings due to submission of incomplete or incorrect information shall not be considered as a basis for extension of time for completion of the contract.

The quantity of shop drawings required may be subject to change due to construction management surveillance needs and/or the complexity of the project. Quantities of shop drawings and submittals will be finalized at the preconstruction conference.

20. Construction Progress and Payment Schedule: Within 14 (fourteen) calendar days after the date of receipt of contract, the Contractor shall prepare and submit to the Contracting Officer for approval and signature, a copy of ARS Form 371, "Construction Progress and Payment Schedule."

This form, in conjunction with ARS Form 372, "Contractor's Request for Payment Transmittal" (or an acceptable facsimile), will be the basis for partial payments to the Contractor. The values employed in making the schedule will be used only for determining partial payments and will not be considered as fixing a basis for additions to or deductions from the contract. Upon the Contracting Officer's approval and signature, a copy of the Form 371 (with original signatures) will be given to the Contractor. No work may be performed onsite unless and until the ARS Form 371 has been approved by the Contracting Officer.

21. List of Materials: The Contractor shall submit for approval a complete list, in duplicate, of brands, type, and make of various equipment and materials proposed to be used. If the Contractor fails to submit such a list, or names of equipment which does not comply with the specifications, or if the manufacturers named are unsatisfactory, the Government reserves the right to reject same and to select satisfactory substitute materials. This selection shall be final and finding upon the Contractor, and the work shall be installed on this basis without change in contract price.

In order to properly identify and to prove compliance with the requirements of the specifications, the Contractor shall give the following data for each product included in the list of materials.

Section heading of the specifications under which material is specified. Manufacturer’s name and address.

Grade, type, trade or catalog number. Size, capacity, and other pertinent data.

All materials, fixtures, and equipment furnished and installed under this contract shall be new and of the best quality; shall be standard cataloged products or reputable manufacturers products or of special manufacture, satisfying completely the contract requirements.

Similar items, unless otherwise specified herein or approved by the Contracting Officer, shall be the product of the same manufacturer, and those fulfilling the same requirements as to size and construction shall be identical.

Substitutions and/or Approved Equal: Where particular make, brand or type of material or equipment is mentioned in these specifications, it is to denote quality standard of article desired, but does not restrict contractor to brand specified; however, any substitution must be met with approval of the Contracting Officer. Other products comparable in type, quality, utility, and price are acceptable if approved by the Contracting Officer. Burden of proof of equality shall rest with the Contractor. The Contracting Officer shall be sole judge of paralleled quality.

22. Cooperation With Other Contractors: During the period of construction for the work covered by this contract, other contractors performing work for the Government may be operating concurrently at the site. To minimize interference and delay to the construction progress of all concerned, all contractors shall cooperate with each other and coordinate their construction operations to the fullest extent. As far as practicable, all contractors performing work for the Government at the site shall have equal rights to the use of all referenced facilities. In a dispute regarding the use of such facilities, the matter shall be referred to the Contracting Officer.

23. Non-Excepted Activity During a Government Shutdown Due to Absence of an Appropriation or Continuing Resolution (CR): Work under this contract has been determined NOT TO BE an Excepted Activity in the absence of an appropriation or CR. Activities under this contract do not support the preservation and protection of life and property and do not support law enforcement, health and safety functions. In the event of shutdown, you will be notified by the cognizant contracting officer (CO) of the Government status and directed to suspend performance/stop work under this contract. For details on the procedures, see Federal Acquisition Regulation (FAR) Clause 52.242-14, Suspension of Work or FAR Clause 52.242-15, Stop Work Order, as included in this contract.

24. Architect and Engineering (A&E) Construction Management Services: Prior to award, by virtue of submitting an offer on this solicitation, the offeror agrees and acknowledges that submitted offer documents (technical proposal, etc.) may be reviewed by the USDA’s Third party (independent designer of record) contracted Architect and Engineering (A&E) firm.

After award, by virtue of receiving this contract, the awardee (Contractor) may be subject to Construction Management oversight by the USDA’s construction management team. This team consists of USDA Third party (independent designer of record) contracted Architect and Engineering (A&E) personnel who may manage the entire construction management process on behalf of the USDA. The awardee (Contractor) will be subject to the construction management process imposed by the construction management team. The construction management team is an extension of the USDA, and as such, the Contractor shall comply with the software usage, website requirements, processes, etc. established by the construction management team to provide oversight of this contract. This may include (but not limited to) USDA A&E imposed construction inspection services, building commissioning, payroll review, record drawings and specifications, preconstruction conferences, construction contractor submittals review, construction contract changes and clarifications, construction progress payment review, submittal software process, commissioning checklists and processes, physical onsite inspection and acceptance on behalf of the CO, final acceptance on behalf of the CO, etc. The contractor will comply with the delegated authority provided to the A&E construction management team. At no time will the A&E construction management team modify or direct contract changes, this authority remains solely with the Contracting Officer.

Invoices: To invoice, a vendor must first enroll in the Invoice Processing Platform (IPP) by visiting https://www.ipp.gov/vendors/index.htm. Once enrolled, all invoices must be submitted electronically through IPP. The IPP is a government-wide secure web-based payment information service offered free of charge to government agencies and their suppliers by the U.S. Department of Treasury’s Financial Management Service (FMS).

One-time enrollment in IPP means that you will receive a series of e-mails from Treasury services.

The first email will have the IPP Logon ID and link to the IPP application. A second e-mail, containing the password will be sent within 24 hours. Once you receive these emails, please login to the IPP application and complete the registration process.

Benefits of registering with IPP include the ability for your company to create invoices directly from a contract award and submit them electronically, as well as:

• E-mail notification when invoice(s) are paid

• Online payment history

• Remittance download

E-mail notifications of payments are sent when a payment is distributed to your bank account and will include all pertinent payment information. The IPP Customer Support Desk is available to assist users Monday through Friday (excluding bank holidays) from 8:00AM - 6:00PM ET, including answering any questions related to accessing IPP or completing the registration process.

Their toll- free number is (866) 973-3131 or they can be reached at:

IPPCustomerSupport@fms.treas.gov.

Solicitation Information

Award Type

It is anticipated that a firm fixed-priced contract will be awarded as a result of this synopsis/solicitation.

The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.

Organized Site Visit

A mandatory site visit is scheduled for 11/17/26 @10:00 AM EST. Registration is required to participate in the site visit. To register for the mandatory site visit, an email shall be sent to the Contracting Officer (david.reynolds2@usda.gov) with the name(s) of the personnel attending, company name, and state of residence. The RFQ number and title shall be placed in the subject line of the email. A Government issued ID is also required to gain access to the facility.

The deadline to register is 11/16/26 @12:00 PM EST. Registrations received after this date/time will not be accepted.

Link up for the site visit is at the entrance to the facility.

NEA EASTERN REGIONAL RESEARCH CENTE

600 EAST MERMAID LANE

WYNDMOOR PA

Attendance by the Prime Contractor is mandatory.

Evaluation and Basis for Award

The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation. In lieu of this provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below. Award will be made to the offeror representing the best value to the Government.

Submission Documents:

Submissions shall emailed to david.reynolds2@usda.gov with the subject line “RFQ 124PCA27Q0008, and project title.” It is the Contractor’s responsibility to ensure the Government is in receipt of the quote by the deadline. Contractors shall not wait until the last minute and assume the email will be received by the Government before the time of closing.

Offerors shall provide all requested information referenced in this section. Failure to provide all requested information may result in the quote being found non-responsive, thus ineligible for award.

1. Transmittal Summary Letter. A summary cover letter to the submission should provide at minimum the following (i) Identification of the Point of Contact, current phone number, and email address. (ii) SAM UEI Number, Tax Identification Number (iii) A list of the submission package contents. The Unique Entity ID (UEI) Sam code provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate SAM UEI has been created for a joint venture it must be also submitted, along with SAM UEI for each joint venture member.

2. Fully completed and Signed SF 1442. Original fully completed and signed SF 1442 Offer page, and acknowledgement of all amendments with via entering data in block 19 of the SF1442 or completing blocks 15a,b, and c of the Amendment(s) and attaching to the SF 1442 offer page.

Complete blocks 14, 15, 17, 20a, 20b and 20c. Failure to acknowledge all amendments may result in the offer to be found Non-Responsive and not eligible for award. Pricing shall be entered on page 3 for line items 0001.

3. SF 24 Bid Bond. Completed/signed SF 24 Bid Bond (if required). A bid guarantee is required in an amount not less than 20 percent of the proposed price but shall not exceed $3,000,000 (for offers of $35,000 or more). Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of proposals, shall require rejection of the proposal in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds shall be provided using Standard Form 24 (see FAR 28.106-1) and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety. Other forms of offer security are acceptable as denoted in solicitation provision FAR Part 28.203-2. (Original Bid Bond copy not required, reference FAR Class Deviation to Eliminate Hard Copy Originals…. dated May 19, 2023) Offerors that provide “bid bonds” that are not an official sealed/signed SF24 will be found non-responsive.

4. Documented Experience. Offerors shall provide at least two (2) references that demonstrate recent and relevant experience performing similar epoxy flooring projects, in size, scope, function, and complexity. Recent is defined as federal, state, or commercial contracts completed within the past five (5) years. Relevant is similar epoxy flooring projects in size, scope, complexity. The Prime Contractor shall have the required past performance. Reference information shall include a brief project description, location of work, dollar value, contract period dates, and current point of contact information (phone and email) for an individual with knowledge of the project.

Evaluation

The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation. In lieu of this provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below. Award will be made to the offeror representing the best value to the Government:

The Government shall make an award utilizing Lowest Priced Technically Acceptable (LPTA) evaluation methodology. The Government shall award a contract to the responsible offeror who offers the lowest priced proposal that is found to be technically acceptable, as set forth in the solicitation with price and other factors considered. In order to be considered acceptable, an offeror and its offer must conform to the material terms of the solicitation (e.g. contract clauses, specifications, etc). The Government shall not award any contract that does not propose a fair and reasonable price.

The Government intends to select a single contractor; however, it reserves the right to award no contract at all, depending on the availability of funds and other extenuating circumstances. The contract award shall be made on an “all” or “none” basis. Offerors submitting deviations or alternatives to the solicitation requirements shall be considered non-compliant and not considered for award.

Offeror Compliance: Offers will be reviewed…