Waste Water PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| solicitation_questions_and_answers.docx | DOCX document | |
| Attachment_1_Bid_Sheets_v2.xls | XLS spreadsheet | |
| Attachment_4_Facilties_Information_-_V2.pdf | ||
| FY19_SW_PWS_FY19_v2.pdf | ||
| FY19_RT_PWS__FY19_v2.pdf | ||
| FY19_GM_PWS_FY19_v2.pdf | ||
| FY19_WW_PWS_FY19_v2.pdf | ||
| 12487018R0002_LBL_Mainteance_v3.pdf | ||
| FY19_FM_PWS_FY19_v2.pdf | ||
| 12487018R0002_LBL_Mainteance.pdf | ||
| FY19_SW_PWS_FY19.pdf | ||
| Attachment_5_Visitation_by_month_FY13-FY171_-_Copy.pdf | ||
| FY19_FM_PWS_FY19-1.pdf | ||
| Attachment_1_Bid_Sheets__-_Copy.xls | XLS spreadsheet | |
| Attachment_3_2019_Collective_Bargaining_Agreement__-_Copy.pdf | ||
| Attachment_6_Deliverables_-_Copy.pdf | ||
| Attachment_4_Facilties_Information_-_Copy.pdf | ||
| Attachment_2_SCA_DBA_Wage_Determinations_-_Copy.pdf | ||
| FY19_General_and_GM_PWS_FY19.doc.pdf | ||
| Attachment_7_Government_Furnished_Equipment_-_Copy.pdf | ||
| FY19_RT_PWS_FY19.doc.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAND BETWEEN THE LAKES (LBL)
PERFORMANCE WORK STATEMENT (PWS)
WATER/WASTEWATER OPERATION AND MAINTENANCE SERVICES
FISCAL YEAR (FY) 19
C.1 GENERAL
For the purposes of the Performance Work Statement (PWS), the United States Department of
Agriculture (USDA) Forest Service (FS) Land Between The Lakes (LBL) National Recreation
Area (NRA) shall be referred to as either LBL or the Government. The Offeror(s) for work covered by this PWS shall be referred to as the Contractor.
All work shall be in compliance with all appropriate local, State, and Federal rules, regulations, codes, laws, the Forest Service Handbook (FSH), and the Forest Plan (FP). The Contractor shall at all times observe and comply with those laws and regulations in effect at contract award, as well as new legislation and amendments that become effective during the term of this contract.
Water Operators are required to have Level B and D from both states KY and TN, they also are required to have a Wastewater Operators License from both states KY and TN. Water Operators personnel and licenses are to be included in offeror’s bid proposal. See Attachment 6, Deliverables.
C.2 FACILITIES/AREAS TO BE MAINTAINED
Information on facilities/areas to be maintained can be found below, at www.landbetweenthelakes.us and within Attachment 4, Facility Information.
C.3 WATER/WASTEWATER PLAN
The Contractor shall propose a Water/Wastewater Management Plan that includes all management, operational, and compliance requirements of the State and Federal Government. As a minimum, it shall contain a list of facilities, a schedule of maintenance, operation, and testing required and planned, required reports and their preparation schedule. The contractor shall develop a contingency plan for all systems in the event of short and long term power outages and/or acts of God, including what actions shall be taken to re-establish State and/or Federal
Regulatory compliance.
C.4 SPECIFIC TECHNICAL TASKS
The Contractor shall provide all labor, supervision, equipment, tools, and other items, resources, and services necessary to schedule and provide routine, special response, preventive, cyclical, and non-routine operations and maintenance services for water/wastewater facilities, structures, programs, activities, and lands within LBL. The Contractor shall provide all personal protective equipment (PPE), chemicals, equipment, materials, and services to perform the requirements of this contract. Such equipment and the use of that equipment shall be subject to the inspection and approval of the Contracting Officer (CO), the Contracting Officer Representative (COR), and Inspectors.
Water/wastewater tasks include, but are not limited to, maintenance and operation of water/wastewater systems, cleaning, pumping and disposal of effluent for chemical toilets, vault toilet, septic tanks, and holding tanks. Tasks include managing, operating, compliance, remediation, planning, scheduling, operating, testing, report preparation, and maintaining records and files. The Contractor shall ensure that all chemical toilets, vault toilets, septic tanks, and holding tanks are clean, reasonably free of objectionable odors, are pumped on schedule, and the effluent is disposed of in an acceptable manner in accordance with State and Federal rules, regulations, permits, and laws.
C.4.1 POTABLE WATER SYSTEMS
The Contractor shall maintain and operate the LBL potable water distribution systems, including maintaining test results. At contract award, potable water is provided by wells in 20 water systems. See Section C.12 for a list of Potable Water Systems. When test results indicate that the water is not fit for human consumption, the Contractor shall immediately restrict access to the suspected contaminated water source in accordance with State laws and regulations, and the
Contractor shall provide the CO with the results of analysis within two hours.
C.4.2 WASTEWATER SYSTEMS OPERATION AND MAINTENANCE
All wastewater systems, including the United States (US) Environmental Protection Agency
(EPA) National Pollutant Discharge Elimination System (NPDES) permitted wastewater systems, shall be inspected, operated and maintained by the Contractor in accordance with the permit and all applicable State and Federal laws and regulations. See Section C.10 for a list of
NPDES permitted systems within LBL. Copies of current NPDES permits are available from the
Government. See Section C.11 for a list of all Non-NPDES permitted systems within LBL. The
Contractor shall notify the CO in writing within 24 hours of notice of any violation(s).
C.4.3 INACTIVE SYSTEMS
There are systems throughout LBL which are inactive at contract award. The inactive systems shall not be serviced unless directed by the COR and modified on contract. The Government may choose to activate or inactivate systems at will. Costs to deactivate or re-activate systems shall be negotiated. Costs to service systems shall be at current contract costs.
C.4.4 NONCOMPLIANCE
In the event of an occurrence of noncompliance, the Contractor shall take action in accordance with the appropriate State or Federal regulations. The Contractor shall notify the CO in writing within 24 hours of occurrence, and once compliance is achieved.
C.4.5 PUMPING
The Contractor shall be responsible for the pumping of sites listed in Sections C.10 and C.11.
The Contractor shall be responsible for all disposal pumped materials.
LBL has a lagoon with wetland located adjacent to the Elk and Bison Prairie. The lagoon is available for disposal of chemical toilet waste, vault toilet waste, septic tank pumped waste, holding tank waste, and, upon prior approval of the CO, treatment plant waste sludge. If the waste is disposed of outside LBL, the Contractor shall furnish the CO and COR with documentation of the location and approval from a state approved facility for such effluent.
C.4.5.1 SEWAGE LAGOON PUMPING
The Contractor shall propose the frequency and associated cost for pumping the sewage lagoon, which was emptied of solids as of June 2012. Pumping of the lagoon will be handled by a work order as needed.
C.4.5.2 SEPTIC AND HOLDING TANK PUMPING
Septic and holding tank pumping shall be initiated by the result of testing verifying that the total tank volume is being occupied by more than 1/3 of solid matter as a calculation of sludge and scum. As a result, the intent is to remove the solids at the 90th percentile. Effluent liquids shall remain in place at the 70th percentile.
C.4.5.3 VAULT TOILET PUMPING
Vault toilet pumping shall be triggered when the tank level is more than 1/2 full. The end result shall be total tank volume at less than 5% and vault wall generally free of solid matter. The manhole gasket area on the vault toilet must be thoroughly cleaned. The manhole cover must fit with an airtight seal for the unit to function properly. Manholes shall be locked immediately after service has been performed.
C.4.5.4 CHEMICAL TOILET PUMPING
Chemical Toilet pumping shall be emptied to less than 5% of total tank volume, recharge with a holding tank deodorizer at 5% of total tank volume.
C.4.6 HAZARDOUS WASTE
The Contractor shall provide hazardous waste response, when requested by the COR. Hazardous waste response typically stems from visitor’s actions resulting in effluent on roadways. Funds for this task will be pre-obligated on contract, with a work order issued upon need.
C.4.7 TESTING
The Contractor shall perform an initial testing of all tanks and vault toilets within 60 calendar days of contract award. The Contractor shall report any incidents that result in differing site conditions immediately in writing to the CO. The Contractor shall provide the CO with a copy of the results of the initial testing, and all subsequent testing within 10 business days of testing.
When testing results in a need for pumping, the Contractor shall test after pumping and provide before and after test results to the CO within 10 business days of testing.
C.4.8 WATER/WASTEWATER PLAN
The Contractor shall maintain a comprehensive Water/Wastewater Plan, as created and submitted during the solicitation phase. An updated copy of the Contractor’s Water/Wastewater
Plan shall be provided to the CO for approval as changes occur.
C.4.9 REPORTING
The Contractor shall utilize a computer-based water and wastewater data program with the necessary software and hardware. This system shall be used to collect, store, and generate reports for compliance reporting to State and Federal agencies. The Contractor shall submit a monthly report to the CO or COR.
The Contractor shall prepare and submit all required documents regarding water/wastewater programs under this PWS to the appropriate regulatory agencies no later than established reporting deadlines. The Contractor shall prepare and submit to the CO for approval and signature all necessary permits, reports, guidance documents, manifests, and supporting documents to support proposed or existing operations subject to provisions of Federal and State regulations. The Contractor shall maintain records and all necessary documentation that comply with permit conditions/agreements in an orderly and accessible manner.
C.4.10 INSPECTIONS
The Contractor shall accompany the CO or COR during inspections conducted by Federal or
State regulatory authorities. The Contractor shall prepare responses to requests for information concerning regulatory inspections, permits, or other regulatory issues, and submit a copy to the
CO. These actions shall be at no cost to the Government.
C.4.11 SPECIAL EVENTS
The Contractor shall provide chemical toilets for special events and activities within LBL. Funds for this task will be pre-obligated on contract, with a work order issued upon need. The COR will notify the Contractor of the event at least one week in advance of the scheduled event. See
Exhibit 2 for routine and special events, which require chemical toilets.
C.4.12 CLEANING TOILETS
The Contractor shall clean the vault toilets and chemical toilets after pumping. Cleaning shall include washing and sanitizing the inside and outside of the unit; disinfecting toilet bowls, risers, urinals, and seat covers to be free of deposits on surfaces; floors shall be free of standing water;
and deodorant sprayed as needed to reduce odors. The Contractor shall report any vandalism to vault toilets and chemical toilets to the COR immediately upon discovery.
Recurring cleaning of chemical toilets and vault toilets shall be performed by the Grounds
Maintenance contractor. Coordination between the Water/Wastewater contractor and the
Grounds Maintenance contractor will be required in order to prevent duplication of effort.
C.4.13 PREVENTIVE MAINTENANCE
The contractor shall inspect filters on lift station pumping systems and change filters as needed.
C.5 INITIAL INVENTORY
The Government will make available those items listed in this PWS and Attachment 7, Government Property. The current number of Vaults, Chemical Toilets and vault toilets are shown in Exhibit 1. All toilets are Government Furnished Property (GFP). Within 20 business days of the contract award, the Contractor shall conduct an independent inventory of all GFP.
Failure of the Contractor to conduct an inventory shall require the Contractor to accept the inventory as determined by the Government.
The Contractor shall specify in their bid whether they intend to use some or all GFP available.
The Government reserves the right to use GFP, upon coordination with the Contractor. The
Government shall be responsible for repair of the GFP if it breaks during Government use. All other repairs and maintenance shall be at the Contractor’s expense.
The Contractor shall not mark or affix decals, emblems or signs portraying the Contractor’s name or logo on GFP. The Contractor shall not use GFP for purposes other than those described in this PWS. All GFP shall remain on LBL property, unless prior approval is received in writing from the CO.
The Contractor shall supply all fuel, lubricants, and spare parts, repair and maintenance as necessary to keep GFP in good operating condition. The Contractor shall notify the CO in writing as GFP becomes unusable or otherwise not needed by the Contractor. When GFP becomes unusable, it shall be replaced by the Contractor at the Contractor’s expense, if required for the performance of the Contract. Any replaced GFP shall become the property of the
Contractor and shall be removed at the termination of the Contract. GFP furnished by the
Government and not replaced shall revert to the Government at the expiration or termination of the contract.
C.5.1 INVENTORY DOCUMENTATION
The Contractor shall prepare, certify, and submit a detailed electronic copy of the Property
Inventory within 5 business days after completion of the inventory. The inventory shall be jointly approved by the Government and the Contractor. The Contractor shall maintain the inventory in a current status throughout the contract. Inventory data should include the location, asset number, condition, and description (including manufacturer, model, serial number, and
USFS ID numbers when applicable).
Government property not desired for use by the Contractor shall be identified by written notification prior to submission of the Government property inventory report. Yearly property inventory must be completed by 30 September and the final document submitted within 5 business days.
C.5.2 INVENTORY DISCREPANCIES
Throughout the term of the contract, the Contractor shall report inventory discrepancies upon discovery. Inventory discrepancies shall be forwarded to the CO within 5 business days of discovery.
C.5.3 ADDITIONS TO INVENTORY
Additional toilets, tanks, or systems may be put into service at the Government’s discretion. The cost for service for additional units shall be at the current contract rates.
C.5.4 FINAL JOINT PROPERTY INVENTORY (FJPI)
The Contractor and Government shall complete a Final Joint Property Inventory (FJPI) of all
Government Furnished Property (GFP) and Government Furnished Facilities (GFF), if applicable, not later than 30 calendar days prior to expiration or termination of the contract. See
Section C.23 for information on GFF. The Contractor shall prepare, certify, and submit a detailed electronic inventory report to the CO within 5 business days after the completion of the joint inventory.
C.6 TOILET MAINTENANCE
The Contractor shall notify the COR when vault toilets are found to be inoperable or aesthetically unappealing. The Contractor shall maintain Chemical Toilets to serviceable standards. The Contractor may be requested to remove and replace chemical toilets, via modification to the contract.
When chemical toilets become unserviceable, the Government will determine the method of replacement in consultation with the Contractor. The new toilets shall be equal to or better than the existing toilets. The Contractor may be requested to purchase toilets, with reimbursement made at cost. Purchases shall be requested via modification, which shall include the brand name, specifications, and the price to be paid for the toilet(s). The Contractor shall submit receipts to the CO. All toilets shall remain the property of the Government at the expiration or termination of this contract.
C.7 GENERAL SERVICES ADMINISTRATION (GSA)
The Contractor shall be authorized to purchase equipment and other supplies and materials for performance of work described in this PWS through General Services Administration (GSA) and other Government sources.
C.8 SCHEDULE
The schedule for pumping shall be determined by testing, as described in Section C.4.7. As a result of visitation, pumping may be required on holidays and weekends. Annual visitation can be found in Attachment 5, Visitation.
The Government may request additional service on a “Special Response” (hourly) basis.
C.9 CLEAN UP
Contractor-generated debris and rubbish shall be removed from the work site daily. The
Contractor shall not dispose of Contractor-generated debris in dumpsters located on LBL. The
Contractor may utilize dumpsters located at the Maintenance Complex, with prior permission provided by the CO. Debris and effluent shall be removed and transported in a manner to prevent spillage on the roads, parking areas, and adjacent areas. The Contractor shall notify the
CO and COR within 2 hours of any spills or leaks caused by the Contractor’s (employees or subcontractors) actions.
The Contractor is solely responsible for remediation of any and all spills or leaks which occur as a result of or are contributed to by the actions of its agents, employees, or subcontractors. The
Contractor shall remediate such spills or leaks to the satisfaction of the Government. The cost for all remediation shall be at the Contractor’s expense.
C.10 NPDES PERMITTED SITES
Facility Name
NPDES#
Design
Flow
Latitude
Longitude
Treatment
Type
Hillman Ferry
Area C
KY0020192
10-1-94
0.061
MGD
Package
Plant
Piney
Toilets & Toilet
Showers 3B
TN0020231
12-1-96
0.0126
MGD
36/29/15 88/02/30 Sand
Filter
Piney
Area C
TN0020249
12-1-96
0.045
MGD
36/29/00 88/02/30 Sand
Filter
Brandon Spring
Resident Center
TN0020273
12-1-96
0.018
MGD
36/33/45 87/54/15 Package
Plant
C.11 NON-NPDES PERMITTED SITES
Facility Name Number of
Systems
Administrative Office Building 1
Boarding House Restroom 1
Central Check Station 1
Central Dump Station 1
Cravens Bay: T#1 1
Energy Lake Campground: Area A (T&S #1) 1
Energy Lake Campground: Area B (T&S #2) 1
Energy Lake Campground: Area C (T&S #3) 1
Energy Lake Campground: Area D (T&S #4) 1
Golden Pond Visitor Center 1
Hillman Ferry: Area A (T#1) 1
Hillman Ferry: Area B (T#2) 1
Hillman Ferry: Fish Cleaning Station 1
Lagoons (Chemical Toilet Lagoon and Central
Lagoon)
Maintenance Complex 1
The Nature Station 1
Piney Campground: Maintenance Building and
Trailer
Piney Campground: Outpost 1
South Welcome Station: Dumping Station 1
South Welcome Station: Visitors Building 1
Wrangler Camp: Sand Filter 1
Wrangler Camp: Area D 1
Wrangler Camp: Front Area 1
Wrangler Camp: North Section 1
C.12 POTABLE WATER SITES
KENTUCKY
TENNESSEE
FACILITY
NAME
PWISD #
FACILITY
NAME
PWSID #
Camp Energy
1112365
Brandon Spring
Group Camp
0004186
Cravens Bay
1112212
The Homeplace B
0004193
Fenton
1112486
Piney Campground
(A,B,C,D)
0004188
Golden Pond
Visitor Center
1112871
Piney Campground
(E)
0004184
Hillman Ferry
(A, B, C)
1112211
South Welcome 004195
Maintenance
1112364
Nature Station 1112213
North Welcome
1112210
Wranglers
1112837
Off Highway
Vehicle
1113460
C.13 SUBMITTALS - A list of documents required is provided in Attachment 6, Deliverables.
C.14 ENVIRONMENTAL LAWS AND REGULATIONS
Asbestos Hazard Emergency Response Act (AHERA)
Clean Air Act (CAA)
Clean Water Act
Energy Policy and Conservation Act
EO 12844 Federal Alternative Fueled Vehicles
Federal Facilities Compliance Act
Government Performance Results Act (GPRA)
Hazardous Material Transportation Act
National Emission Standards for Hazardous Air Pollutants
National Environment Policy Act (NEPA)
National Pollutant Discharge Elimination System (NPDES)
National Pollutant Discharge Elimination System (NPDES) - Phase II
National Primary Drinking Water Regulations
Occupational Safety and Health Act (OSHA)
Pollution Prevention Act (PPA)
Resource Conservation and Recovery Act (RCRA)
Safe Drinking Water Act
Sikes Act
Surface Water Treatment Rule
Toxic Substances Control Act
Water Quality Control Act
Wetlands Directives
Handbook
C.15 INDUSTRIAL STANDARDS AND CODES
Air Moving and Conditioning Association (AMCA)
American Association of State Highway and Transportation Officials (AASHTO)
American Society for Testing and Materials (ASTM)
American National Standards Institute (ANSI)
American Water Works Association (AWWA)
Americans with Disabilities Act (ADA)
Federal Specifications (FS)
Gypsum Association, Inc.
National Fire Protection Association (NFPA)
National Forest Products Association (NFPA)
Underwriter’s Laboratories, Inc. (UL)
C.16 ATTACHMENTS AND EXHIBITS
Attachments referenced and made a part of this PWS are as follows:
Exhibit 1 Vault Toilet, and Chemical Toilet Inventory
Exhibit 2 Routine and Special Events Requiring Chemical Toilets
Exhibit 3 2017 KY, TN Well Usage (Blue represents highs)
Attachment 1 Bid Sheets/Schedule of Items
Attachment 2 Wage Determination
Attachment 3 Collective Bargaining Agreement
Attachment 4 Facility Facts/Information
Attachment 5 Visitation
Attachment 6 Deliverables
Attachment 7 Government Property, where applicable
C.17 METHOD OF PAYMENT
The Contractor shall be paid once per month after work has been accomplished.
C.18 PERFORMANCE STANDARDS
No required shutdowns of drinking water systems for Notice of Violations.
Receive zero notices of non-compliance (NON) on NPDES permitted systems.
Water/wastewater systems operational 100% of the time when power is available.
Pumping is completed per testing and per standards established.
Proper disposal at approved facility.
All State and Federal reports required are submitted on time and are 100% accurate.
Chemical toilets are placed as requested.
Cleanliness of systems and sites after performance of service.
Maintain Chemical Toilets and report inoperable toilets to the CO/COR.
Appearance and maintenance condition of collection vehicles.
Response time for emergency and special response work on water/wastewater systems is in accordance with this PWS.
C.19 PERFORMANCE REQUIREMENTS SUMMARY
REQUIRED
SERVICES
PARAGRAPH
NUMBER
STANDARD ACCEPTABLE
QUALITY
LEVEL
METHOD OF
SURVEILLANCE
DEDUCTS
Compliance with Safety and Environmental
Requirements
C.1, C.11, C.12, C.17
Perform IAW the
PWS
100% 100% Inspection 5% per month
Timely Submittal of all
Required Plans, Reports, and Other Data
C.3, C.4.7, C.4.9, C.5, C.15, C.16, C.17, C.18, C.19, C.22, C.23.2
On Time and
Accurate 100% 100% Inspection 5% per month
Operate Drinking Water
Systems
C.4.1 No required shutdowns
100% 100% Inspection 5% per month
Operate Wastewater
Treatment Systems
C.4.2 Zero notices of non-compliance or violations
100% 100% Inspection 5% per month
Perform Pumping
Procedures C.4.5, C.4.7 Per testing standards
100% Random Sampling 5% per month
Proper Disposal at
Approved Facility C.4.5 Perform IAW PWS 100% Random Sampling 5% per month
Placement of Chemical
Toilets
C.4.11 Perform IAW
Work order
95% 100% Inspection 5% per work order
Cleanliness of Systems and Sites After Service
C.4.12, C.9 Perform IAW PWS 90% Random Sampling 5% per month
Conduct and
Maintenance of
Property Inventories
C.5 Perform IAW the
PWS
90% 100% Inspection 5% per month
Maintain Chemical
Toilets C.6 Maintain to serviceable standards
100% Random Sampling 5% per month
Condition of Collection
Vehicles
C.14.5 Perform IAW PWS 95% Random Sampling 5% per month
Response for
Emergencies and
Special Response Tasks
C.21 Perform IAW PWS 95% 100% Inspection 5% per work order
EXHIBIT 1, VAULT AND CHEMICAL TOILET INVENTORY
LOCATION QUANTITY SIZE
Cravens Bay RA Site 1 500
Energy Lake Assembly Building 1 500
Maintenance Complex Garage 4 1 750
Boarding House (NS restrooms) 1 1000
Brandon Springs Intern Site 1 1000
Central Dump 2 1000
Cravens Bay Bathhouse 1 1000
Energy Lake A-Loop 2 1000
Energy Lake B-Loop 2 1000
Energy Lake D-Loop 2 1000
Energy RA Site 1 1 1000
Energy RA Site 2 1 1000
Hillman Ferry A-3 2 1000
Hillman Ferry B-1 4 1000
Hillman Ferry Fish Cleaning Station 1 1000
Hillman Ferry Outpost 1 1000
Homeplace 1 1000
Intern House 3 2 1000
Intern House 4 1 1000
Intern House 5 1 1000
LEO 1 1000
Live Well Center 1 1000
Maintenance Complex Office
(LBLA) 1 1000
Maintenance Garage 1 1000
Maintenance Shops 1 & 2 1 1000
Maintenance Warehouse 1 1000
Nature Station 2 1000
North Welcome Visitor 2 1000
Piney Chaplin Site 1 1000
Piney Gatehouse 1 1000
Piney Outpost 1 1000
Wranglers C Loop 3 1000
Wranglers D Loop 3 1000
Wranglers Day Use 1 1000
Wranglers Dump Station 2 1000
Wranglers Gatehouse 1 1000
Brandon Springs Grease Trap 1 1500
LOCATION QUANTITY SIZE
Energy RA Gatehouse 1 1500
Homeplace 1850 1 1500
Wranglers A 1 1500
Wranglers B sites 2 1500
Wranglers C-50 Site, Ferrier 1 1500
Wranglers C RA/Chaplin 1 1500
Wranglers C sites 1 1500
Wranglers Outpost Grease 1 1500
Wranglers Outpost Restroom 1 1500
Wranglers Playground 1 1500
Central Hunt Station 1 2000
Energy Lake C loop 1 2000
Golden Pond Visitor Center 1 2000
South Welcome 2 2000
South Welcome Dump Station 1 2000
Wranglers C lift station 1 3000
Wranglers D bath 1 3000
Wranglers Dump Station 1 4000
Administration Building 1 4250
North Welcome 1 4250
Wranglers A bath 1 5000
Wranglers B bath 1 5000
Wranglers C bath 1 5000
Wranglers D bath 1 5000
LIFT STATIONS
LOCATION QUANTITY
Brandon Springs 1
Energy lake 1
Hillman Ferry 7
Piney 11
Wranglers 1
CHEMICAL TOILETS & Vault toilets
North End
Number Location Number Location
2 VTs Birmingham Ferry Campground 1 VT Pisgah Point Camping Area
2 VTs Cravens Bay Campground 1 VT Gordon Hill Trailhead
1 VT Demumbers Camping Area 1 VT Smith Bay Campground
1 VT Devil's Elbow Day Use Area 1 VT Golden Pond Trailhead
1 CT EBP Corral 1 VT Star Camp Picnic Area
1 VT
Energy Lake Dam Day Use
Area 1 VT Blue Hole Trailhead
3 VTs Fenton Campground 1 VT Sugar Bay Campground
1 VT Golden Pond Shooting Range 1 VT Taylor Bay Campground
1 VT Hematite Lake Picnic Area 1 VT Twin Lakes Campground North
1 CT Jenny Ridge Picnic Area 1 CT Twin Lakes Campground South
1 VT Moss Creek Day Use Area 3 VTs Wranglers Campground
1 CT Nature Station 5 CTs Wranglers Campground
1 VT Nickell Branch Campground 6TWs* Maintenance Yard
1 VT North Welcome Station
12CTs* Maintenance Yard
South End
Number Location Number Location
1 VT Boswell Landing Campground 1 VT Neville Bay Camping Area
2 CTs Brandon Spring Resident Center 1 VT Redd Hollow Campground
1 CT Cedar Pond Picnic Area 1 CT South Bison Range Picnic Area
1 VT Colson Hollow Group Use Area 1 VT South Welcome Station
1 VT Colson Overlook Picnic Area 2 VTs
Turkey Bay Off-Highway Vehicle
Area
2 VTs Gatlin Point Campground 4 CTs
Turkey Bay Off-Highway Vehicle
Area
1 CT* Homeplace
*This is an accessible chemical toilet
**The Toilet Wagons and Chemical Toilets are for special events and emergencies. One CT is currently at Sugar Bay Campground and one CT currently at the Sewage Lagoon. The CT inventory includes one accessible chemical toilet and 11 non-accessible chemical toilets.
EXHIBIT 2, ROUTINE AND SPECIAL EVENTS
REQUIRING CHEMICAL TOILETS
HOMECOMINGS AND REUNIONS (W/WW)
DATE EVENT COUNTY ROAD
First Saturday in May Boyd Memorial Stewart 206
First Sunday in May Pinnegar Trigg 139
Second Sunday in May Dickerson Lyon 117
Third Sunday in May Paradise Lyon 112
Third Sunday in May Bethlehem Trigg 174
Last Saturday in May Hematite Lyon 136
Fourth Sunday in May Smith Lyon 120
Last Sunday in May Oakley Reunion Trigg Fenton Pavilion
First Saturday in June Oakley Lyon 147
First Saturday in June Golden Pond Schools Trigg Fenton Pavilion
First Sunday in June Newby Lyon 130
Second Sunday in June Lone Pine Stewart 219
Second Sunday in June Sardis Lyon 126
Third Sunday in June Lee-Dodds Lyon 111A
Fourth Sunday in June Bethlehem Lyon 122
First Sunday in July Woodson Chapel Lyon 129
First Sunday in August Acree Family Reunion Stewart Homeplace
Pavilion
Second Sunday in August Trigg County Reunion Trigg Fenton Pavilion
Third Saturday in August Saint Stephens Lyon 415 & 122
Saturday of
Labor Day Weekend
Stewart County Reunion Stewart South Bison Range
Picnic Area
Labor Day Weekend Pleasant Hill Trigg 166
Second Sunday in Sept. Bethlehem Trigg 174
Second Sunday in Sept. Lady Lyon 128
Third Saturday in Sept. Lyon County Reunion Lyon Star Camp Picnic
Area
First Saturday in October Boyd Memorial Stewart 206
First Saturday in October Oakley Lyon 147
Second Saturday in Oct. Ferguson Springs Trigg 147
Third Saturday in October Dixon Trigg 344
SPECIAL EVENTS
DATE EVENT LOCATION NUMBER OF
UNITS
Memorial Day
Weekend
Pickin’ Party Homeplace 2 single units
Saturday in June Special Populations
Fishing Tournament
Honker Dam Two needs accessible units
Sunday in June White Lightening
MT Bike Race
KY Lake Drive One toilet Wagon
3 Days in June Cheryl’s Little House Colson Hollow One toilet wagon
Three days in June Drag Boat Races Birmingham Ferry Two toilet wagons
Weekend in July Drag Boat Races Birmingham Ferry Two toilet wagons
Weekend in August Drag Boat races Birmingham Ferry Two toilet wagons
Weekend in July Rodeo Wranglers One toilet wagon
Weekend in August State Archery
Tournment
68/80 Range Toilet wagon
Labor Day Weekend Special Event Homeplace One toilet wagon
Week in September Campers Fair Piney Two toilet wagons
Weekend in
September
Mountain Bike Race Kentucky Lake
Drive
One toilet wagon
HOLIDAY WEEKEND NEEDS FOR CHEMICAL TOILET UNITS
DATE LOCATION UNITS
Memorial Day Weekend – Thur-Mon OHV 2 single units
Memorial Day Wranglers Move and charge on-site units
Week of July 4th Wranglers Move and charge on-site units
Labor Day Weekend – Thur-Mon OHV 2 single units
Labor Day Weekend Wranglers Move and charge on-site units
Thanksgiving Wed-Sun OHV 2 single units
Each toilet wagon has two trash cans. The trash cans will be emptied by Contractor into the nearest dumpster when cleaned and/or when removed from event.