FY19_GM_PWS_FY19_v2.pdf
PDF 2 MB Posted
- Attached to
- Grounds Maintenance Contract Federal contract opportunity
- Solicitation number
- 12487018R0002
About this file
Updated Grounds Maint V2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| solicitation_questions_and_answers.docx | DOCX document | |
| Attachment_4_Facilties_Information_-_V2.pdf | ||
| FY19_SW_PWS_FY19_v2.pdf | ||
| FY19_RT_PWS__FY19_v2.pdf | ||
| Attachment_1_Bid_Sheets_v2.xls | XLS spreadsheet | |
| FY19_WW_PWS_FY19_v2.pdf | ||
| 12487018R0002_LBL_Mainteance_v3.pdf | ||
| FY19_FM_PWS_FY19_v2.pdf | ||
| Attachment_6_Deliverables_-_Copy.pdf | ||
| Attachment_4_Facilties_Information_-_Copy.pdf | ||
| Attachment_2_SCA_DBA_Wage_Determinations_-_Copy.pdf | ||
| FY19_General_and_GM_PWS_FY19.doc.pdf | ||
| Attachment_7_Government_Furnished_Equipment_-_Copy.pdf | ||
| 12487018R0002_LBL_Mainteance.pdf | ||
| FY19_SW_PWS_FY19.pdf | ||
| Attachment_5_Visitation_by_month_FY13-FY171_-_Copy.pdf | ||
| FY19_FM_PWS_FY19-1.pdf | ||
| Attachment_1_Bid_Sheets__-_Copy.xls | XLS spreadsheet | |
| Attachment_3_2019_Collective_Bargaining_Agreement__-_Copy.pdf | ||
| FY19_WW_PWS_FY19.pdf | ||
| FY19_RT_PWS_FY19.doc.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAND BETWEEN THE LAKES NRA (LBL)
PERFORMANCE WORK STATEMENT (PWS)
GENERAL/GROUNDS MAINTENANCE AND FACILITIES CLEANING
FISCAL YEAR (FY19)
C.1 GENERAL
For the purposes of the Performance Work Statement (PWS), the United States
Department of Agriculture (USDA) Forest Service (FS) Land Between the Lakes (LBL)
National Recreation Area (NRA) shall be referred to as either LBL or the Government.
The Offeror(s) for work covered by this PWS shall be referred to as the Contractor.
All work shall be in compliance with all appropriate local, State, and Federal rules, regulations, codes, laws, the Forest Service Handbook (FSH), and the Forest Plan (FP).
The Contractor shall at all times observe and comply with those laws and regulations in effect at contract award, as well as new legislation and amendments that become effective during the term of this contract.
C.2 FACILITIES/AREAS TO BE MAINTAINED
Information on facilities/areas to be maintained can be found at www.landbetweenthelakes.us, and within Attachment 4, Facilities Information. This information is not intended to be all-inclusive. Additional facilities or programs may be added at the Government’s discretion. The cost for service shall be at the current contract rates.
C.3 WORKMANSHIP
All services covered under this PWS shall be done in such a manner so that all items covered shall be kept in a safe, neat, clean, healthy, and aesthetically pleasing way on a schedule that compliments each facility’s and facility event’s use. Response time for emergency grounds maintenance services shall be no more than 2 hours. Emergency grounds needs will be requested per work order. See Section C.18 regarding work orders.
C.4 MATERIALS/SUPPLIES
The Contractor shall supply all materials and supplies required under this scope of work.
Materials and supplies include, but are not limited to: cleaning products, toilet paper, toilet seat covers where dispensers are present, soap in provided dispensers, trash can liners, and sanitary products where dispensers are present. Materials and supplies shall be purchased by the Contractor and reimbursed at cost by the Government. The historical average cost of supplies is $50,000 per year. See section C.20, Receipts, for documentation requirements.
C.5 SPECIFIC TECHNICAL TASKS
The Contractor shall provide all labor, supervision, equipment, tools, and other items, resources, and services necessary to schedule and provide routine, special response, preventive, cyclical, and non-routine services for grounds maintenance services. The
Contractor shall provide all personal protective equipment (PPE), chemicals, equipment, materials, and services to perform the requirements of this contract. Such equipment and the use of that equipment shall be subject to the inspection and approval of the
Contracting Officer (CO), the Contracting Officer Representative (COR), and Inspectors.
Grounds Maintenance services include, but are not limited to: facility and grounds cleaning, mowing, landscaping, edging, trimming, weeding, herbicide application, leaf removal, cleaning and sanitizing floors, drinking fountains and restrooms, cleaning ceiling and door vents and fans, emptying trash and garbage receptacles, cleanups due to leaks, cleaning pavilions, porches, stairs, steps, campsites, fire rings, cleaning light fixtures and replacing light bulbs, cleaning interior/exterior of buildings, cleaning, removing litter and other debris at campsites, tightening loose fixtures, cleaning gutters and removing debris from building roofs, cleaning and maintaining picnic tables, laundry machines and areas, playgrounds/equipment, beach and other recreation areas, policing grounds and buildings for litter, and other services as necessary. All cleaning services shall include the use of necessary and proper detergent or cleaner, disinfectant and furniture wax or polish, etc.
C.5.1 MOWING
Mowing shall be completed per the attached Mowing Plan, Exhibit 1.
Mowing shall be completed in a safe manner without adversely affecting the quality of experience of visitors
Grass and weeds trimmed around trees, fences, ditches, walks, parking areas and buildings during mowing season. Herbicide treatments are only done after consultation with the Facility Manager, and in accordance with the Herbicide
Management Plan, Exhibit 7. All Herbicide applicators must have current applicators license furnished by the respective state they are applying herbicide.
The contractor must have an individual with an herbicide operators license as well as individuals licensed for application.
Grass and weeds trimmed around sites, ditches, grills, exhibits, electrical boxes, and buildings in back country, lake access, group area, and self-service campgrounds.
Trees and landscaping shall incur no damage or adverse effects due to
Contractor activities
Trash shall be picked up prior to mowing
Trees and landscaping free of scrapes and gouges caused by mowers and weed trimmers.
Leaves may be burned with COR concurrence and coordination
Vines, limbs, vegetation, etc. shall be trimmed or removed on and around buildings.
The Contractor shall ensure that all ground infrastructures (water hookups, water covers, etc.) are not damaged by mowers or trimming equipment. The
Contractor shall be responsible for all damage that occurs to such items.
No mowing is permitted on Saturdays, Sundays, or holidays unless specifically waived by the CO or COR.
Limbs and trees identified by the COR shall be removed. Cut trees and limbs shall be disposed of in designated areas or by scattering debris into wooded areas beyond administrative boundaries and shall not be left in mounds or piles. No disposed materials shall be left in a ditch, drainage or creek or within 20 feet of such.
C.5.2 TRASH CANS
A list of trash cans is included as Exhibit 3, Trash Can Inventory. Cans shall be emptied, sanitized, outside of cans cleaned, liners replaced, litter around cans and dumpsters removed. Recycle containers shall be free of non-recyclable materials and emptied when full. Recycled materials shall be transported to the recycle center located at the LBL
Maintenance Complex and placed in the appropriate container. Additional cans may be added at the Government’s discretion. The cost for service shall be at the current contract rates.
C.5.3 CHEMICAL TOILETS, VAULT TOILETS
Chemical toilets and Vault toilets shall be cleaned between pumping services performed by the Water/Wastewater contract. A list of toilets and the cleaning schedule is included as Exhibit 4.
Coordination between the Water/Wastewater contractor and the Grounds Maintenance contractor will be required in order to prevent duplication of effort.
C.5.4 MAINTENANCE/JANITORIAL AREAS
Areas shall be kept clean, neat, safe, stocked, and organized.
C.5.5 SNOW AND ICE REMOVAL
Snow and ice removal includes pre-salting. Snow and ice removal will be accomplished to accommodate both employees reporting to work and visitors to open facilities. If the facility is not open and there is no need for employees to report to work then snow and ice removal will not be required. The Contractor shall remove snow and ice from the sidewalks and steps at the following facilities as necessary: Administrative Office and
Police Headquarters, Golden Pond Visitor Center, The Homeplace, and Brandon Springs.
C.5.6 MINOR REPAIRS
Check during cleaning and repair any of the following items if broken or leaking: light bulbs, flush valves, levers, ballcocks, loose and broken commode seats and mounts, faucets, showers, drains, shower valves and heads, piping, water heater, and mop sinks.
HVAC filters changed as needed.
Any maintenance needs beyond the specified tasks below shall be reported to the Facility
Manager or COR.
Activities must take place in a manner that does not disrupt scheduled programs, general visitors, or animal well-being. The Contractor shall consult with the Facility Manager prior to working on projects that may affect any of these situations.
C.5.7 CLEANING
C.5.7.1 HILLMAN FERRY, ENERGY, PINEY, AND WRANGLERS – see cleaning frequency, Exhibit 2
Toilet Building, Shower Building Interior & Exterior Cleaning:
Toilet bowls, risers, seat covers, and urinals disinfected and free of deposits on surfaces
Work Order for clogged toilet bowls that cannot be cleared through traditional methods of plunging, should only occur after contacting facility COR
Floor mats and shower mats cleaned and disinfected, dirt and residue removed
Shower curtains washed free of mildew and replaced as needed
Showers and shower mats cleaned and disinfected, drains free of debris
Mirrors and windows cleaned, dust, spot and streak free
Baby changing tables free of residue and disinfected
Building interiors, ceilings, light fixtures, floors and walls free of dirt, trash, graffiti, spider webs, and insects (dead or alive).
Personal items left after 24 hours discarded. Valuables shall be turned in at the gatehouse.
Toilets, counters, and benches cleaned and free of standing water
Sinks and counters free of residue and water and disinfected, drains clear of debris
Walkways and trails clear of obstructions, refuse, vegetation, and free of standing water
Gravel and paved perimeters around buildings clear of vegetation, refuse and debris
Sanitary containers and wastebaskets in woman’s restrooms emptied and liners replaced
Doorknobs and handles cleaned and disinfected
Loose screws, loose hoses and connections replaced as needed
Metal vent covers repaired and replaced when needed
Wranglers horse wash station catch basin/hair strainers free from hair, dirt, manure and refuse
Fish Cleaning Station, where applicable – Clean 1/day then monitor and clean as appropriate.
Fish cleaning stations cleaned and disinfected daily (starting in April)
Fish debris removed from drain
Sinks and cutting boards cleaned
Floors cleaned and sprayed off
Water and power in working order
Laundry Machines and Areas - Monitor 1/week March-November and clean as appropriate.
Litter and debris removed from behind machines, surfaces wiped off
Trash emptied when full
Chrome ware cleaned, dust, spot and relatively streak free
Wash basins cleaned, drain free of debris, disinfected, and free of deposits
Washers/dryers disconnected each season and stored within facility
Playgrounds/Equipment, Beach Area - Monitor 1/week and clean as appropriate or as requested by the COR.
Ground free of vegetation, debris and litter
Vegetation removed around sand boxes/ties
Steps, access ramps and sidewalk areas free of debris and litter
Beach wash functional and drain free of sand and other debris/litter
Parking areas free of debris and litter
Re-paint lines/symbols on parking areas as needed
Signage free of residue and posted as needed
Sand replaced or loosened seasonally
Swimming area markers secure
Shelter Buildings, Amphitheaters, and Activity Buildings - Monitor 1/week and clean as appropriate or as requested by the COR.
Shelter floors free of dirt, trash, vegetation (alive or dead) and standing water
Picnic tables free of dirt, food, and trash
Area in and around facility free of cigarette butts and debris/litter
Bathrooms cleaned and trash emptied
Rafters free of cobwebs, bird nests, and wasp nest or other insects
Litter removed from surrounding areas
Roofs free of debris (pine needles, branches, etc.)
Amphitheaters free of vegetation and litter
Benches, seating areas and stage areas secure and safe for use with no protruding nails
Loose boards removed, replaced, and repaired if needed
Gravel added as needed
Walkways clear of leaves, litter, debris
Fireplaces, char-grills, fire rings, and stoves – 1/week beginning Monday, complete by
Thursday.
Fire rings no more than half full of ashes and free of trash
Char-grills and fireplaces completely emptied
All ashes and partially burned wood confined to fireplace or grill
Grill surfaces generally free of grease and large food particles at time of ash removal
Pedestals, bases, and fire rings straight, secure and components functional and safe for use
Replace, move or remove as necessary
Toilet Building, Shower Building, Other Building Interior & Exterior Cleaning – 1/month
Vents (walls, doors, ceilings) free of dirt, dust, and other debris
Plumbing alleys free of insects, cobwebs, nests, and trash. Storage of material in these areas must meet all OSHA safety standards
Fixtures checked and repaired for loose/missing screws, nuts and/or bolts
Exterior/interior walls free of graffiti
Roofs relatively free of leaves and branches
Eaves free of wasps nests, bird nests, and spider webs
Tables – Clean 1/month, monitor when vacated and clean as appropriate or as requested by the COR.
Tops and seats free of dirt, food and trash
Under portions of tables free of spider webs, mud daubers, wasps, and vegetation
Tops, seats, and legs secure, functional, and safe for use
Replace, move and remove as needed
Hand-pumps, fountains, and water hydrants - Monitor 1/month and clean as appropriate or as requested by the COR
Free of grease or residue
Secure and generally drip-free
Catch basins (drains) free of food particles, soaps, grease, debris, standing water, and functioning properly
All fixtures and facilities meet applicable standards
Fixtures disinfected as necessary
Camping cabins located at Piney, Hillman, Energy and Wranglers – Clean 1/month or as requested by the COR.
Interior walls, floors, and fixtures free of cobwebs, insects, dust, dirt, manure, trash, hay, and nails
Exterior walls free of cobwebs, insect nests, bird nests, dirt, nails
Bedding and seating free of dirt, dust, trash, cobwebs, and bugs
Bedding covers replaced as needed
Porch areas free of grease stains, dirt, litter, hay, manure, and leaves
Gutters and roofs free of leaves, branches, nests, and dirt.
Areas around shelters free of litter, rope, bailing twine, nails, etc.
Fire rings and grills free of litter and no more than half full of ash
Sealant to be applied to the exterior walls every other year;
cleaner/conditioner applied to the interior as part of the annual deep cleaning.
Cleaning cabins after rental is responsibility of occupant
Trails, Roads, Culvert Maintenance – Clean 1/month then monitor and clean as appropriate or as requested by the COR.
Trails mowed to maintain a clear path for users
Trail surfaces predominately free of major erosion problems
Trees trimmed and pruned along all trails. Hanging limbs 8ft and below shall be removed
Remove downed trees and other debris from roads and trails. Trails shall be maintained at 10 ft. wide
Trail bridges in good repair, free of rotten/loose boards or missing/loose nails, safe for use, and free of moss
Crosstie steps on trails and at pond predominately free of rot
Gravel to trail extensions replaced as needed
Trails, roads and culverts free of hazards
Drainage ditches, covers and outlets clear of debris and free flowing
Potholes in paved roads and trails filled
Gravel replaced and graded as needed
Gatehouse, Outpost – Clean 1/month, monitor 1/week and clean as appropriate March –
November
Gutters and roofs free of leaves, pine needles, branches, etc.
Nests and cobwebs removed
Check for water leaks
Monitor and perform as appropriate or as requested by the COR:
Campsites, Grounds
Seeding, fertilizing and mulching as requested or needed
Gravel, mulch and sand kept at appropriate levels for the respective area
Flower bed material (crossties) safely installed, well maintained and rot free
Campsites, gravel parking areas and other areas where unwanted grass is growing sprayed with herbicide. Prior COR coordination required for herbicide spraying.
Electrical boxes on campsites free of mud daubers, ants and wasps
Sewage hookups and water shut-off valves at sites have covers
Steps, decks, and ramps free of loose boards, loose nails, and slick surfaces/spots such as moss
Split rail fencing, remove and replace rails as needed
Crosstie steps on trails or near campsites predominately free of rot and replaced when needed
All tripping hazards eliminated
Rebar flush with surface of ties
Trees free of rope, nails, wire and hazard branches
Limbs trimmed above sites and roads below 14 ft.
Gravel or manufactured sand replaced as needed or requested by the COR
Small riprap placed or replaced around shoreline, sites, and creek beds when needed
Rotted or damaged crossties placed or replaced as needed
Leaves and pine needles raked or blown from campsites and roads
Vegetation, debris, leaves and litter removed from culverts, gutters and creek beds
Spiders and wasps sprayed in pipe chases and buildings as necessary
Beach sand initially spread and maintained seasonally and free of grass
Signs – Continuously monitor for sign needs as other duties are carried out. Remove bird nests, hornet/wasp nests as needed. Notify COR of all other needs.
Horse Wash Stations, Hydrants, Troughs (Wranglers)
Area around hydrant stocked with gravel, Government provided
Area around hydrants and wash stations free of hay and manure
Troughs free of algae and sediment
Hydrants checked, malfunction or damage reported to Facility Manager
Clips on crossties secured and in working condition, replaced as needed
Leaks or broken parts reported to Facility Manager
Tethering Poles (Wranglers)
Bent, broken or leaning poles replaced as needed
Manure and hay removed as needed from tethering areas (historically performed on a weekly basis)
Manure Bins and Stall Barns (Wranglers). Historically performed weekly March-June, September, October; bi-weekly July, August, November. No services December-
February.
Bins generally free of manure
Vacant stalls free of manure
Grounds generally free of large piles of manure and used bedding
Stall doors and overall barn structure free of loose boards, broken hinges, and protruding nails. Monitor on a weekly basis, March-November
The Contractor shall be responsible for all equipment needed to load and remove manure.
The Contractor shall dispose of the manure to an off-site Government-approved facility.
The current production results in approximately 525 tons of manure per year.
All costs of manure loading and removal, to including dump fees, if applicable, shall be at the Contractor’s expense.
The following tasks shall be coordinated with the Facility Manager in order to minimize impacts on the visiting public. This is not considered an all-inclusive list.
Cross ties on sites within the entire campground removed and/or replaced as needed
Fill dirt and gravel added to sites
Fire rings/grills removed and replaced with new as needed
Picnic tables removed and replaced with new as needed
Cabins cleaned thoroughly (Piney, Energy Lake, Hillman & Wranglers)
Fan screws in cabins tightened (Piney & Wranglers)
Suckers removed from trees in campground
Trees pruned
Leaf debris and brush removed
Loose vegetation removed away from sites
All debris cleaned from culverts, ditches, and gutters. Debris within 3 feet of culvert inlet and outlet removed
Toilet and shower buildings power washed
All vegetation removed from sand boxes and playgrounds
Loose benches or ties at campfire theatres secured, repaired, or removed
Areas with grass seeded as needed (February)
Danger trees and limbs removed (danger trees shall be identified as such by a qualified COR)
C.5.7.1.1 CAMPGROUND WINTER STAFF
Beginning December 1 thru February 15th, Piney and Hillman Campground require 2
FTEs (38 contract days) each year, these FTE’s may be utilized in other areas at the CO’s direction. The contractor shall ensure that Energy Lake Campground receive the required level of effort commensurate with the enumerated requirements to ensure fully functioning facilities ready for public use on or before March 1 of each year. Wranglers
Campground is open all year. A high level of cooperation shall be required between the
Government and the Contractor throughout the year to ensure administrative and logistical issues are resolved.
Energy Lake Campground historically has not had maintenance employees assigned during winter months. Tasks typically begin in mid-February to ensure that the campground is ready to open. All grounds maintenance work carried out in Energy Lake during the winter with the exception of tasks ensuring the campground is in proper opening condition on March 1 is based on Special Response/Work Order.
C.5.7.2 NORTH AND SOUTH WELCOME STATION
5/Week March, November (Wed-Sun); 7/week April-October; closed Dec-Feb
Restrooms
Mirrors and countertops cleaned
Paper towel holders cleaned and filled
Sinks cleaned and sanitized
Floors cleaned and sanitized
Sanitary containers and trash cans emptied, sanitized and liners replaced
Toilet partitions cleaned and sanitized
Reception Area
Doors (inside and outside) cleaned
Paper towel holders cleaned and refilled
Benches cleaned and sanitized
Windows (front and back) cleaned
Floors swept and mopped
Outside (Front and Back)
Telephones cleaned and sanitized
Drinking fountains cleaned and sanitized
Vending machines and areas around vending machines cleaned
Leaves and debris removed from sidewalks
Spider webs removed
Ashtrays emptied
Front and back door areas swept as needed
Vault Toilet in Parking Lot
Cleaned Twice Weekly March 1-October 31
Cleaned Once Weekly November 1-February 29
Cleaned and sanitized
Toilet paper stocked to maximum capacity
1/Week
Kick plates and name plates cleaned
All exposed cabinets, frames, pictures, maps, restroom toilet partition tops and other items dusted as necessary
Pavilion floor sprayed (North only)
Walls, door frames, interior and exterior trash containers and toilet partitions cleaned each Monday
Picnic tables and surroundings clean of limbs and trash
Grills cleaned of ashes
Semi-annually
Windows cleaned (Spring and Fall or as needed)
Carpet professionally cleaned (North Welcome only)
Air freshener replaced as needed
Lawns and Fields
1/Month Spring, Summer, Fall
Graveled, mulched, and sanded areas kept weed free
Leaves blown away from the perimeter of the buildings and parking lots
Landscaping
2/ Monthly Spring, Summer
Flowerbeds weeded and maintained with plants in good health and condition
1/Year
Crossties used for flowerbed borders safely installed, well maintained, and predominantly rot free
Flowerbeds maintained with approximately 1-2 inches of mulch material. Work should be done in the spring
Shrubbery and vines pruned to prevent damage to buildings and interfering with operation of HVAC units (Winter and early Spring)
As needed
Hallway power washed monthly
“Closed” sign placed on Dec. 1; removed on February 28
C.5.7.3 GOLDEN POND VISITOR CENTER, HOMEPLACE, NATURE
STATION, NATURE WATCH AREA
Golden Pond Visitor Center (GPVC) - Includes the main building/Planetarium, storage shed, playground, driveway, parking lot, picnic area and pavilion, two ponds, all walkways, Golden Pond Observatory, flowerbeds.
Homeplace- Includes the main building, parking lot, picnic pavilion, picnic area across the creek, farm site and all historic structures, farm site restroom, modern barn/pasture, 16 acre pasture.
Non-Homeplace sites include South Bison Picnic Area, and Cedar Pond Picnic Area.
Woodlands Nature Station: Includes the main building, parking area, well house building with three rooms, brown metal storage building, raptor house, backyard exhibits, wooden pavilion, boardinghouse restroom and picnic area, canoe rental area, and maintenance sheds.
Nature Watch Area: Includes Woodland Walk Trail, Hematite Trail and Picnic Area, Center Furnace and Trail, Honker Lake Access Road, Long Creek Trail, Empire Point, Honker Dam, Bobcat Point.
1/Day - prior to opening and spot cleaned after periods of heavy use
Restrooms - all components cleaned/sanitized/stocked
Floors swept/mopped, carpet vacuumed
Common surfaces cleaned and sanitized (water fountains, door knobs/handles etc.)
Kitchen cleaned, sanitized, stocked
Reachable surfaces dusted
Glass reasonably streak and smudge free (windows, doors, exhibit glass)
Trash emptied as needed
Outdoor areas reasonably free of trash, leaves, debris
Livestock water troughs filled (Homeplace)
Walkways maintained to prevent safety hazards
Animal food preparation room floor swept/mopped (Nature Station)
Mulched paths maintained to prevent safety hazards (Nature Station)
1/Week
Flowerbeds and gardens reasonably free of weeds and mulched properly
Gates and fences maintained to prevent safety hazards
Roofs free from debris
Exterior windows free of dirt and spider webs
Barbeque grilles and fire rings free from ashes
Animal feed moved around farm (Homeplace)
Check with staff before addressing any animal pest issues
Check and empty trash cans at Cedar Pond Picnic area and South Bison picnic area
Roofs/netting free from debris (Nature Station)
Raptor House - All components cleaned/disinfected (use approved animal care products- see staff) (Nature Station)
Animal water bowls cleaned, disinfected, refilled (coordinate with staff) (Nature
Station)
Backyard lawn is kept at heights established in the Mowing Plan, edges trimmed
(Nature Station)
Nature Watch Area reasonably free of trash, debris, and leaves
1/Month
Upper area surfaces dusted
Air diffusers and returns cleaned
HVAC filters replaced as needed (Should be listed under facility maint)
HVAC drain lines and floor drains cleared
Gutters cleaned and debris removed from base of structures
Culverts and drains cleared of debris
Vegetation pruned out of public walkways and away from structures
Grass removed from patio pavers
As needed
Assist with program set-up (tables, tents, chairs, garbage cans, etc.)
Storage areas cleaned/reorganized
Small tasks requiring a chainsaw and other equipment
Playground sand raked and replaced as necessary
Picnic tables cleaned
Modern Barn cleaned (Homeplace)
Hay placed (Homeplace) (round bales require use of tractor)
Clothes dryer duct/vent cleaned (Homeplace)
Animal carriers cleaned and disinfected (Nature Station)
Exhibit cases cleaned and dusted (Nature Station)
Animal pen maintenance (coordinate with staff)
Light fixtures free of insects
Carpets and planetarium seats professionally cleaned after normal operating hours
(GPVC)
All mulch to include walkways, gardens and common areas to be replaced with
COR approved mulch (Nature Station)
C.5.7.3.1 HOMEPLACE, NATURE STATION WINTER STAFF
The Woodlands Nature Station and The Homeplace facilities are closed to the public
December-February. The Contractor shall supply 1 person to split 40 hours a week between the two facilities. The 40 hours may be tasked at the COR’s discretion (i.e., 2 days at one facility, 3 days at the other facility). In the event that the normally scheduled individual is unavailable, the Contractor shall supply an alternate. All individuals shall be qualified and experienced to work at both locations.
Equipment requirements include such things as a pickup truck, small tractor, chainsaw, leaf-blower, pressure washer, hand tools etc.
1/Week Dec-Feb
Restrooms - all components cleaned, sanitized, and stocked (spot cleaned after periods of heavy use)
Floors swept/mopped, carpet vacuumed
Common surfaces cleaned and sanitized (water fountains, door knobs/handles, etc.)
Kitchen cleaned, sanitized, stocked
Reachable surfaces dusted
Glass reasonably streak and smudge free (windows, doors, exhibit glass)
Outdoor areas reasonably free of trash, debris, and leaves
Animal food reparation room floor swept/mopped (Nature Station)
Raptor House cleaned and disinfected (Nature Station)
Nature Watch Area reasonably free of trash, debris, and leaves
As needed Dec-Feb
Small tasks requiring a chainsaw
Leaves and vegetation removed from around structures
Comprehensive cleaning/reorganization of storage buildings, fridges, freezers
Animal pen maintenance (coordinate with staff)
Once prior to re-opening in March bark mulch (no wood chips) applied to the walking paths in the Nature Station backyard area to a depth of approximately 2 inches (Approximately 90 yards of mulch)
C.5.7.4 BRANDON SPRING GROUP CENTER
Daily tasks with Group in camp (performed at least 1/day):
Approximately 250 days/year of group occupancy
Interior and exterior trash and recycling receptacles (except those in dorm rooms) emptied if more than ¾ full or if there is strong odor. Refuse transported to the appropriate designated area. Containers clean and odor free.
Debris such as gravel, mud, leaves, goose feces, etc. removed from decks, walkways, docks and the hard court.
Ensure firewood is available for group use at fire rings and fireplaces. Fire rings and fireplaces free of excessive ash.
Interior and exterior bulbs replaced when needed. Issues with fixtures reported to
Facility Manager.
Cardboard broken down flat and stored at staging area.
Shower facilities at swimming pool cleaned the morning of a group swim
(Summer only).
Prior to Group Arrivals:
Approximately 95 days with groups arriving at camp.
Vacuum cleaners in working order and vacuum bags replaced when no more than
¾ full.
Interior and exterior light bulbs replaced when needed. Issues reported to Facility
Manager.
HVAC air handler filters in dorms replaced when visibly dirty.
Loose metal rails, ladders, and broken or lose boards on bunk beds repaired.
Major issues reported to Facility Manager.
Loose or broken parts on shutters, doors, chairs and tables tightened, replaced, and repaired as needed. Major issues reported to Facility Manager.
Air freshener canisters replaced when empty.
Air freshener dispenser and smoke detector batteries replaced when needed.
Swimming Pool:
During off season: Bottom drain free of leaves; no standing water in bottom of pool.
Start up: Pool walls and bottom cleaned of surface dirt or grime that has accumulated in off season.
Start up: Once pool is cleaned, drain valve closed and filled with fresh water.
Shut down: Filter system shut down, sand filters and pool drained.
During season: Disabled lift installed upon group request.
During Season: Shower house facilities and pool deck cleaned prior to daily swim time.
1/Week, Regardless of Group Occupancy
Bird, wasp and mud dauber nests and spider webs removed from exterior of buildings.
Patios and decks cleaned. Deck furniture cleaned and maintained. Deck tables, chairs and benches in proper locations.
Commons building fountain maintained when in operation. Bottom of fountain free of debris and the water clear and clean.
Amphitheater stage, walks and seating area free of debris, moss, and other slip hazards.
Ditches and drains maintained in a clean and free flowing manner.
Leaves around buildings, amphitheater, fire rings and in ditches removed and disposed of.
Leaves in general lawn areas and play fields mulched or removed.
Flower beds weeded. Bedding and potted plants watered and maintained in good health and condition.
Wooden walkways, decks, steps, railings and bridges inspected for rot, loose boards, raised fasteners, splintering and other safety hazards. Rotten boards replaced, fasteners tightened, and minor damage repaired. Major issues reported to Facility Manager.
All exterior windows cleaned at least once per month during April-October.
Exceptions are second story windows requiring special equipment to access.
Goal posts, backstops, canoe racks, basketball goals, archery range and net maintained to standards for safe use. Inspected monthly, repaired as needed.
As Needed
After heavy rains, underground ductwork in Commons Building checked for water. Any standing water in ducts pumped out.
Assist program staff in moving materials and equipment to program areas for group needs. (Example: moving picnic tables for cookouts or helping launch rescue boat at beginning of season.)
Grill moved to appropriate area for group cookouts. Grill cleaned afterward and returned to storage area.
Gravel or grass along edges of walks maintained to prevent soil runoff and aid drainage.
Weeds on ball diamond, beach, under bleachers, under canoe racks, archery range, horseshoe pits, around fencing and graveled areas removed.
Fallen trees and limbs removed from grounds and trails. Limbs trimmed to a height of at least 6 feet above trail.
Trail surface inspected for erosion problems and repaired as needed.
Paved portion of Paw Paw path predominantly free of leaves, grass, weeds and other obstructions.
Lawn areas seeded and fertilized when requested by the COR.
Gutters cleared of debris.
Exterior of buildings pressure washed.
Wooden surfaces (decks, walks, docks, benches and picnic tables) pressure washed and water sealant applied.
At least once per year mulch: flower beds, under bleachers, challenge course elements, under canoe racks and selected areas of trails with appropriate material.
Sand added to beach area and canoe launch when directed by Facility Manager.
Appropriate material added to ball diamond when directed by Facility Manager.
Rotted crossties replaced.
C.5.7.4.1 BRANDON WINTER STAFF
N/A
C.5.7.5 ADMINISTRATIVE OFFICE, LE&I, LIVEWELL
Administrative Office: Tuesday, Thursday, 8:00 A.M. - 4:30 P.M.
LE&I: 2 times a week (Schedule must be presented to the CO within 15 days of contract signage), 8:00 A.M. - 4:00 P.M
Livewell: (Schedule must be presented to the CO within 15 days of contract signage)
8:00 A.M. - 4:00 P.M. (If contractor is allowed to use it, they clean at no charge 2 times a week)
Glass on front doors (inside and outside) cleaned
Mirrors and countertops cleaned
Paper towel holders cleaned and refilled as needed
Sinks cleaned and sanitized
Commodes and urinals cleaned and sanitized
Floors cleaned and sanitized
Sanitary containers and wastebaskets emptied and sanitized
Toilet partitions cleaned and sanitized
Air fresheners refilled as needed
Carpet vacuumed
Conference room table tops cleaned and sanitized
Kitchen countertops cleaned and sanitized
Microwave ovens (inside and outside) cleaned and sanitized
Exterior of refrigerators cleaned
Exterior glass on soda and candy machines cleaned
Drinking fountains cleaned and sanitized
Supply rooms cleaned
Sidewalks and patios clear of dirt and leaves; leaves blown to tree line
HVAC filters changed as needed
Graveled, mulched, and sanded areas weed free
Litter removed from around buildings and parking lots, including the parking lot of “Snack Shack”
Semi-annually
Windows thoroughly cleaned (Spring and Fall or as needed)
Light fixtures cleaned
Carpet professionally cleaned
1/Week in Spring and Summer
Weed flowerbeds and maintain flowerbeds and plants in good health and condition.
Crossties used for flowerbed borders safely installed, well maintained, and predominantly rot free.
Flowerbeds maintained with approximately 1-2 inches of mulch material.
(Spring)
Shrubbery and vines pruned to prevent damage to buildings and interfering with operation of HVAC units. (Winter and early Spring)
C.5.7.6 INTERN VILLAGE
HVAC filters checked and changed as needed
Clean trailers/houses prior to interns moving in when directed by COR
C.5.7.7 RADIO SHOP (Located at the Maintenance Complex)
Bi-weekly
Mirrors and countertops cleaned
Paper towel holders cleaned and refilled as needed
Sinks cleaned and sanitized
Commode cleaned and sanitized
Floors cleaned and sanitized
Sanitary containers and wastebaskets emptied and sanitized
Toilet partitions cleaned and sanitized
Air fresheners refilled as needed
Carpet vacuumed
C.5.7.8 BASIC CAMPGROUNDS AND CAMPING AREAS
BASIC CAMPING AREAS
Boswell Landing – 17 sites, 1 boat ramp, 1 courtesy dock
Sugar Bay – 16 sites, 1 boat ramp
Redd Hollow – 39 sites, 1 boat ramp
Taylor Bay – 35 sites, 1 boat ramp, 1 courtesy dock
Twin Lakes North and South – 14 sites, 1 boat ramp
Nickell Branch – 13 sites, 1 boat ramp, 1 courtesy dock
Smith Bay – 15 sites, 1 ramp
Neville Bay – 1 ramp
Demumbers Bay – 2 sites, 1 ramp and 1 fishing causeway (Willow Bay)
Ginger Bay – 1 boat ramp
Cravens Bay – 31 sites, 2 boat ramps, 1 courtesy dock. (Has flushing restroom)
Gatlin Point – 19 sites, 1 boat ramp, 1 courtesy dock
Fenton – 10 sites, 1 courtesy dock and ramp, 1 pavilion, 1 fishing jetty
Birmingham Ferry – 29 sites 2 ramps
1/month
Dumpsters treated for odor
All maintenance needs and dead or damaged trees and limbs reported to the COR within one week of completion of monthly cleaning.
Herbicide applied as needed to the gravel pads in the campsites in Cravens Bay, Smith
Bay, Gatlin Point, and Birmingham Ferry. Prior COR coordination required.
Basic camping and Self-Service Campgrounds, 1/month March-November.
Birmingham Ferry, 1/month March-May, and September-November. June-August, tasks completed before and after three special events. Historically the first full weekend in
June, the first weekend after July 4th, and the first full weekend in August. Special events shall be coordinated with the Facility Manager.
Central Hardwoods Trail head (Fenton), Cumberland, Sunset Trail head and GP
Overlook pick up loose trash
Tables
Tops and seats cleaned of dirt, food, and trash
Under portions of tables cleaned of spider webs, mud daubers, wasps, and vegetation
Tops, seats, and legs secure, functional, and free of hazards
Fireplaces, char-grills, fire rings, and stoves
Ashes, debris and trash removed
Grill surface generally free of grease and large food particles at time of ash removal
Fire rings secure, and components functional
Frost free hydrants (Cravens (2), Gatlin (2), and Fenton (1)
All units and catch basins cleaned of grease or residue
All units secure and generally drip-free
Fixtures disinfected as necessary
Grounds
Electric boxes on campsites free of mud daubers, ants, and wasps; Fenton (12) and Cravens Bay (2)
Campsites, grounds, and fishing jetty cleaned of litter
Culvert inlets cleaned of leaves and other debris blocking water flow
Campsite surface level and free of vegetation
Trees free of nails, rope, and wire
Steps, docks, and ramps free of loose boards, loose nails, and cleaned of slick spots such as moss
All tripping hazards eliminated
Rebar flush with the surface of ties or ground if tie missing
Boat ramp and courtesy dock cleaned of debris
Minor seasonal flood events deposit light debris and refuse. Once flood waters recede, debris and refuse removed from within the established area boundary.
FENTON PAVILION 1/April and before and after special events. Historically 10 events held on weekends during May-October. Special events shall be coordinated with the Facility Manager.
Pavilion floor and grounds cleaned of litter
Table tops and seats cleaned of dirt, food, and trash
Under portions of tables cleaned of spider webs, mud daubers, and insects
Table tops, seats, and legs secure, functional, and free of hazards
Pedestal grill emptied
Grill surface generally free of grease and large food particles at time of ash removal
Pedestal grill straight, secure and components functional
Eaves cleaned of wasp nests, bird nests, and spider webs
CRAVENS BAY – 1 toilet building
1/week March 1-October 31.
Toilet Buildings
Toilet bowls, risers, seat covers, and urinals disinfected and cleaned of deposits on surfaces
Building interiors cleaned of dirt, trash, graffiti, spider webs, and insects (dead or alive)
Toilets, counters, benches, and floors cleaned of standing water
Chrome ware cleaned
Sinks and counters cleaned and disinfected, drains operational
Mirrors cleaned
Unpleasant odors (both sewage and chemical) minimized
Vents cleaned of dirt, dust, and other debris
Toilet paper stocked to maximum capacity
Sanitary containers and wastebaskets in woman’s restroom emptied and liners replaced
Plumbing alleys cleaned of insects, cobwebs, nests, and trash. Storage of material in these areas must meet all OSHA safety standards
Light fixtures covers or bulb protectors cleaned of cobwebs, dead insects, stains, and residue.
Walkways and trails cleaned, cleared of obstructions and vegetation
Roofs and gutters cleaned of leaves and branches
Eaves cleaned of wasp nests, bird nests, and spider webs
Gravel perimeters around shower and toilet building cleaned of vegetation and debris
COLSON HOLLOW GROUP USE AREA
1/month from March-November.
Table tops and seats free of dirt, food, and trash
Under portions of tables free of spider webs, mud daubers, wasps, and vegetation
Table tops, seats, and legs secure, functional, and free of hazards
Electric box free of mud daubers, ants, and wasps
Grounds cleaned of obvious litter and flood debris. Includes cleaning litter from fire pits.
Nails, rope, wire removed from trees
C.5.7.9 DAY USE AREAS
Colson Overlook – 6 tables and 3 grills
Jenny Ridge – 11 tables and 6 grills
Star Camp – 6 tables and 3 grills
Kentucky Lake Drive – 2 tables, 2 trailheads, and 7 scenic vistas.
Devil’s Elbow Day Use Area – 1 boat ramp and an accessible fishing path
Moss Creek Day Use Area – 5 picnic tables and 3 grills
Eddyville Ferry Day Use Area – 1 Ramp
Grays Landing Day Use – 1 Ramp
Canton Bridge Trailhead and Fishing Access Point
Jones Creek Day Use – 1 Ramp
Energy Dam Day Use – 2 boat ramps and 1 fishing causeway and courtesy dock
Cedar Pond Picnic Area – 4 tables and 2 grills
South Trailhead – 5 tables, 2 grills, 1 bulletin board
Bison Range Picnic Area – 5 tables, 2 grills
1/month March-November except for Moss Creek which is 1/month March 15th-
September
Table tops and seats cleaned of dirt, food, and trash
Under portions of tables cleaned of spider webs, mud daubers, wasps, and vegetation
Table tops, seats, and legs secured, functional, and free of hazards
Ashes, debris and trash removed from pedestal grills
Grill surfaces generally free of grease and large food particles at time of ash removal
Fire rings secure and components functional
Grounds and fishing jetty cleaned of litter
Culvert inlets cleaned of leaves and other debris blocking water flow.
Trees free of nails, rope, and wire
Steps, docks, and ramps free of loose boards, loose nails, and slick spots such as moss
All tripping hazards eliminated
Boat ramp and courtesy docks clean of debris
C.5.7.10 GOLDEN POND RIFLE RANGE AND ARCHERY RANGE
Rifle Range 1/week year round
Archery range 1/month March-November
Contractor furnished “Area Closed” signs to be utilized when working in ranges.
Shooting Tables
Tops and seats cleaned of dirt, food, and trash
Under portions of tables cleaned of spider webs, mud daubers, wasps, and vegetation
Tops, seats, and legs secured, functional, and free of hazards
Shooting Shelters
Litter removed
Trash cans emptied and liners replaced
Grounds
Grounds, shooting lanes and parking lots cleaned of litter especially around the dumpster
Culvert inlets cleaned of leaves and other debris blocking water flow
All tripping hazards eliminated
Pavilion (Archery)
Pavilion floor and grounds cleaned of litter
Eaves cleaned of wasp nests, bird nests, and spider webs
C.5.8 WAREHOUSING/OFFLOADING SUPPORT
Contractor is responsible for labor & equipment to accept and offload freight shipments for the Government as well as the Land Between the Lakes Association. Shipments are accepted anytime during normal working hours. It is the responsibility of the contractor to communicate delivery of freight goods to appropriate personnel within the
Government or the Land Between the Lakes Association within 24 hours of delivery via email or phone call.
C.5.9 FUEL PUMP MAINTENANCE/OVERSIGHT
Daily
Print copy of daily output at the end of each day
Maintain copy of daily reports for annual pump and tank inspections
Monitor fuel levels (diesel and gasoline) and order fuel as necessary, levels should be kept high enough to ensure there are no “low fuel level” reports.
Monthly
Print passing monthly fuel report and forward to COR
Yearly
Schedule annual tank inspections and certifications
Act as liaison between Government and Fuel Supplier and Fuel Maintenance
Company for necessary maintenance, repairs and inspections. Repairs, maintenance and inspections to Fuel Pumps, System and Software will be issued via Work Order.
Replace printing paper, bands etc. at fuel pumps and software system located in contractor maintenance complex.
C.6 CONTRACT LOGISTICS
C.6.1 CORs
LBL utilizes multiple Contracting Officer Representatives (CORs), and one Lead COR.
Each COR is responsible for a specific facility, program, or area. The Lead COR is responsible for a facility, program, or area, as well as invoice processing and oversight of the contract. The Contractor shall be provided COR designation letters within 5 business days of contract award.
C.6.2 FUNDING
Funding for contracts at LBL may be provided at once by passage of a full budget, or throughout the year using Continuing Resolutions (CR’s). Upon receipt of funding, the
CO shall issue a modification to apply funding. Funding must be obligated on contract prior to work orders being issued. See Section C.18 regarding work orders.
C.6.3 CONTRACT LINE ITEMS (CLINs)
The Contractor shall bid for all requirements under this PWS as one lump sum, firm fixed price, per facility/area established on the attached bid sheet. The price shall include all costs associated with this PWS, including any fees, rental costs, reporting, etc. A CLIN is also established for a Special Response hourly rate. The Contractor shall bid on each year (base and all options). The Government will accept proposals presented as value engineering.
C.6.4 PARTNERS
LBL currently has an agreement with the Land Between the Lakes Association (LBLA).
LBLA may obtain funding on behalf of LBL to use for tasks provided for in this PWS.
C.7 PROTECTION OF LAND AREAS
The land, facilities, structures, programs, activities and areas outside the limits of work performed under this contract shall be preserved in the condition at contract award, minus fair wear and tear. The Contractor shall confine activity to areas defined for work or specifically assigned for Contractor use.
C.8 PROTECTION OF WATER RESOURCES
The Contractor shall comply with all Federal, State, and County laws concerning pollution of rivers and streams. The Contractor shall take special measures to prevent materials from entering public waters including, but not limited to, soil, chemicals, fuels, oils, greases, bituminous materials, herbicides, and insecticides.
C.9 CLEAN UP
Contractor-generated debris and rubbish shall be removed from the work site daily. The
Contractor shall not dispose of Contractor-generated debris in dumpsters located on LBL.
The Contractor may utilize dumpsters located at the Maintenance Complex, with prior permission provided by the CO. Debris shall be removed and transported in a manner to prevent spillage on the roads, parking areas, and adjacent areas. The Contractor shall notify the CO and COR within 2 hours of any spills or leaks caused by the Contractor’s
(employees or subcontractors) actions.
The Contractor is solely responsible for any and all spills or leaks and subsequent clean ups that may be required during the performance of this contract which occur as a result of or are contributed to by the actions of its agents, employees, or subcontractors. The
Contractor shall clean up such spills or leaks to the satisfaction of the Government.
C.10 CONTRACTING OFFICER NOTIFICATION
All inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract shall be directed to the CO.
C.11 CONTRACTOR HOURS OF WORK
The Contractor shall schedule working hours to satisfy the requirements of each facility or activity at LBL, which will vary by season, visitation, and workload. The Contractor shall be required to provide service at all facilities and activities on weekdays, weekends, and holidays based on the facility/activity’s operating schedule. Some facilities on LBL are closed December through February; therefore, the Contractor shall understand the fluctuation in Contractor’s workload is lighter during those months and heavier during high visitation months.
Holidays, holiday weekends, and special events will require above-normal frequencies.
The contractor should anticipate a heavier than usual workload due to increased use and visitation. Extended performance may be requested the weekend prior to the holiday weekend. Holiday weekends include Memorial Day, July 4th, Labor Day, Spring Break, and Fall Break. Annual visitation can be found in Attachment 5, Visitation.
The Contractor shall schedule personnel so that overtime rates are not applied, other than on special response tasks. The Contractor shall perform special response as required outside of regularly scheduled hours. See Section C.21 for Special Response procedures.
See Attachment 4, Facility Information for the operating hours of each facility.
C.12 CONTRACTOR’S PERSONNEL
C.12.1 CONTRACTOR’S MANAGER
The Contractor shall provide a Project Manager who shall be responsible for ensuring the requirements of this PWS are met. This person, and an alternate(s) who shall act for the
Contractor when the Project Manager is absent, shall be designated in writing to the
Contracting Officer (CO) for approval within 7 calendar days prior to the contract start date. The Project Manager and the alternate(s) shall be given authority to make on-site decisions on contract matters on behalf of the Contractor and shall be the central point of contact for the Government. The Contractor shall notify the CO and CORs of the name of the current designated Project Manager, the time period for which they shall be contacted, and a contact phone number. This information shall be provided via e-mail as changes occur.
The Project Manager or an alternate shall be available at all times during normal business hours and shall be available within two hours of notification by the Government to discuss and/or meet on matters related to the contract. The Project Manager or alternate shall be available 24 hours a day, 7 days a week by telephone to respond to emergency requests.
The Project Manager must have a minimum of five years of experience and proven success in the management of similar maintenance and service operations. The Project
Manager and alternate shall be able to communicate effectively in English, both orally and in writing.
C.12.1.1 ON-SITE KEY PERSONNEL REQUIREMENTS
Project Manager: Minimum five (5) years experience managing similar requirements.
Contract Manager: Minimum three (3) years experience managing similar requirements.
Quality Control Officer: Minimum (3) years experience in Quality Control/Quality
Assurance Management.
Offerors will provide qualification statements indicating the knowledge, skills, and abilities required to hold these key positions, in addition, all offerors must provide mutual letter of intent from proposed key personnel.
No changes to the proposed key personnel is allowed without prior written approval from the Contracting Officer.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.