ATTACHMENT 6 - Specifications FSSS 74-5.7.pdf

PDF 294 KB Posted

Attached to
NFSR 74-4. 6 Road Construction & NFSR 74-5. 7 Box Culvert (Amendment 2)
Solicitation number
12467020R0065
Issued by

About this file

This document provides specifications for a federal contract opportunity for road construction and box culvert replacement work. The project involves erosion control, installation of new culverts and geosynthetics, aggregate base spreading and compacting, roadbed reconditioning, geocell confinement system installation, ditch and slope excavation, lead off ditch and rolling dip construction, and seeding. The work will be performed in the Ocala Ranger District of Florida's National Forests near Salt Springs for $500,000 to $1,000,000. A pre-proposal site visit will be held on June 10, 2020, and proposals are due around June 4th. The contract will be a firm fixed price awarded as a 100% small business set aside.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NFSR 74 M.P. 5.7 Reinforced Concrete or Precast Box Culvert Construction Project

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid¸ Award¸ and Execution of Contract

Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work

Delete Subsections 104.01, 104.02, 104.04

104.03 Specifications and Drawings

104.06 Use of Roads by Contractor

105 - Control of Material

105.02(a) Government-provided sources

105.02(c) Contractor-located sources

105.02 (a) Government-provided sources

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

106.07 Partial and Final Acceptance

107 - Legal Relations and Responsibility to the Public

107.02 Protection and Restoration of Property and Landscape

Delete Subsection 107.05

107.08 Sanitation, Health, and Safety

108 - Prosecution and Progress

Delete Section 108

109 - Measurement and Payment

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

109.03 Weighing Procedures and Devices

152 - Construction Survey and Staking

152.04 General

152.05 Survey and Staking Requirements

Table 152-1 Construction Survey and Staking Tolerances

153 - Contractor Quality Control

153.02 Qualifications

153.03 Quality Control Plan

153.07 Records and control charts

153.04 (2) (a) Submittal Log

155 - Schedules for Construction Contracts

Delete Section 155

156 - Public Traffic

Section 156. – PUBLIC TRAFFIC

157 - Soil Erosion and Sediment Control

157.01 Add the following:

157.03 General

157.04 Controls and Limitations on Work

157.04(b) Add the following:

157.04(d) Delete the subsection and replace with the following:

157.04(f) Add the following:

157.09 Diversions

157.13 Maintenance & Cleanup

201 - Clearing and Grubbing

201.04 Clearing

201.04 Clearing

201.06 Disposal

201.06 Disposal

203 - Removal of Structures and Obstructions

203.04 (b) General

203.05 Disposing of Material

204 - Excavation and Embankment

Section 204. — EXCAVATION AND EMBANKMENT

207 - Earthwork Geotextiles

207.04(c)(1) First layer placement and compaction

208 - Structure Excavation and Backfill for Selected Major Structures

208.07 Dewatering

209 - Structure Excavation and Backfill

209.09 Backfill

209.10 Compacting

213 - Subgrade Stabilization

213.05 General

301 - Untreated Aggregate Courses

301.03 General

301.05 Compacting

302 - Minor Crushed Aggregate

302.04 Placing Crushed Aggregate

314 - Stockpiled Aggregates

314.01 Description

314.04 Stockpile Site

625 – Turf Establishment

625.07 Seeding

703 - Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate

704 - Soil

704.02 Bedding Material

Preface Preface_wo_03_30_2019

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System

Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_3_15_2017

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the FAR (Federal Acquisition Regulations) in the specifications when incorporating into

2400-6(T) Timber Sale or 2400-13(T) Stewardship contracts.

101.01_National_11_9_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_9_5_2018

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or

“construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of

Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

N/A

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.03_National_11_4_2016

Delete Subsection 104.03 and replace with the following:

104.03 Specifications and Drawings.

Refer to B(T) 5.211 in the 2400-6(T)) or F(T).2.1.1 in the 2400-13(T) contracts for requirements under this subsection.

104.06_National_11_9_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_National_11_1_2016

Add the following to Subsection 105.02(a):

105.02(a) Government-provided sources.

Government-provided sources for this project are identified as follows:

(1) Government-provided mandatory sources.

Pay Item Description Material source number or name

N/A N/A N/A

(2) Government-provided optional sources for this project are identified as follows:

Pay Item Description Material source number or name

N/A N/A N/A

If the Contractor elects to obtain material from N/A the following applies:

(1) N/A

105.02_National_11_1_2016

Add the following to Subsection 105.02c:

105.02(c) Contractor-located sources.

All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work shall be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor. Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area.

A Forest Service weed specialist will inspect proposed sources to determine weed-free status. Provide the

Contracting Officer written notification of proposed material sources <14> days prior to use. Written approval of the specific source will be provided to the contractor by the CO. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting

Officer.

105.02_National_7_18_2017

Add the following to Subsection 105.02 (a):

105.02 (a) Government-provided sources.

Complete any pit or quarry development specified for a designated source, even when material is not obtained from the source.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the

Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

106.07_National_11_1_2016

Delete Subsection 106.07.

106.07 Partial and Final Acceptance.

107 - Legal Relations and Responsibility to the Public 107.02_National_11_1_2016

Add the following to Subsection 107.02:

107.02 Protection and Restoration of Property and Landscape.

-- Limit work to within clearing limits identified in final design and construction staking limits

107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

107.08_National_11_1_2016

Delete Subsection 107.08 and replace with the following:

107.08 Sanitation, Health, and Safety.

Refer to specific provisions under B(T) 6.0 in the 2400-6(T) or G(T).0 in the 2400-13(T) contracts for requirements under this subsection.

108 - Prosecution and Progress 108.00_National_11_9_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment 109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision

Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1

Station 0.1

Mile 0.01

Square Foot 0.1

Square Yard 0.1

Each 1

Acre 0.01

Gallon 1

M-Gals. 0.1

Cubic Yard 1

Exception--Structure Excavation; Sheathing

Materials; Bedding, Bed Course, and Backfill

Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01

Pound 1

Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

Bituminous Materials; Pavements;

Bed Course Materials

0.01

Hour 0.1

MFBM 0.01

Station Yard 1

Cubic Yard Mile 1

Ton Mile 1

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

109.03_National_11_1_2016

Add the following to Subsection 109.03(c):

109.03 Weighing Procedures and Devices.

(c) Project weighing system.

For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements.

152 - Construction Survey and Staking 152.00_National_12_12_2016

Add the following to Subsection 152.04(c):

152.04 General.

(c) Material.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Make the following changes to Subsection 152.05:

152.05 Survey and Staking Requirements.

Delete Subsection 152.05(d)(2) and replace with the following:

(d) Slope and reference stakes.

(2) Conventional survey methods. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

Method I—Computed Method. Use the template information shown in the plans or other

Government-provided data to calculate the actual location of the catchpoint. The slope stake

“catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table

152-2.

Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

Add the following to Subsection 152.05(e):

(e) Clearing and grubbing limits.

Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.

Replace Table 152-1 with the following:

Table 152-1 Construction Survey and Staking Tolerances

Table 152-1

Construction Survey and Staking Tolerances (1)

Staking Phase Horizontal Vertical

Control points set from existing

Government control points- Tolerance Class

A

±0.03 feet

(±10 millimeters)

±0.01 feet × N

(±3 millimeters × N )(2)

Mapping, topography, and cross-section

Points- Tolerance Class A

±0.16 feet

(±50 millimeters)

±0.16 feet

(±50 millimeters)

Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance

Class A

±0.06 feet

(±20 millimeters)

±0.06 feet

(±20 millimeters)

Slope-stake and slope-stake references-

Tolerance Class A (4)

±0.16 feet

(±50 millimeters)

±0.16 feet

±50 millimeters)

Culverts, ditches, and minor drainage structures stakes- Tolerance Class A

±0.16 feet

(±50 millimeters)

±0.06 feet

(±20 millimeters)

Retaining walls stakes ±0.06 feet

(±20 millimeters)

±0.03 feet

(±10 millimeters)

Curb and gutter stakes ±0.06 feet

(±20 millimeters)

±0.03 feet

(±10 millimeters)

Bridge substructures stakes ±0.03 feet

(±10 millimeters)(5)

±0.03 feet

(±10 millimeters)

Bridge superstructures stakes ±0.03 feet

(±10 millimeters)(5)

±0.03 feet

(±10 millimeters)

Clearing and grubbing limit stakes-

Tolerance Class A

±1.00 feet

(±300 millimeters)

Roadway subgrade finish stakes- Tolerance

Class A (6)

±0.16 feet

(±50 millimeters)

±0.03 feet

(±10 millimeters)

Roadway finish grade stakes (6) ±0.16 feet

(±50 millimeters)

±0.03 feet

(±10 millimeters)

Concrete Reinforced Box Culvert stakes ±0.06 feet

(±20 millimeters)

±0.03 feet

Table 152-1

Construction Survey and Staking Tolerances (continued) (1)

Staking Phase Horizontal Vertical

Control points set from existing Government control points –Tolerance Class B (7)

±0.16 feet

(±20 millimeters) ±0.16 feet ×

(±20 millimeters × )(2)

Mapping, topography, and cross-section points–Tolerance Class B (7)

±1.00 feet

(±300 millimeters)

±0.50 feet

(±150 millimeters)

Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance

Class B (7)

±0.16 feet

(±20 millimeters)

±0.16 feet

(±20 millimeters)

Slope-stake and slope-stake references–

Tolerance Class B (7)

±0.50 feet

(±50 millimeters)

±0.16 feet

±50 millimeters)

Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)

±0.50 feet

(±150 millimeters)

±0.16 feet

(±20 millimeters)

Clearing and grubbing limit stakes–Tolerance

Class B (7)

±2.00 feet

(±600 millimeters)

Roadway subgrade finish stakes–Tolerance

Class B (7)

±0.50 feet

(±50 millimeters)

±0.16 feet

(±10 millimeters)

Roadway finish grade stakes–Tolerance Class

B (7)

±0.50 feet

(±50 millimeters)

±0.16 feet

(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.

(2) N is the number of instrument setups.

(3) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.

(4) Take the cross-sections normal to the centerline ±1 degree.

(5) Bridge control is established as a local network and the tolerances are relative to that network.

(6) Includes paved ditches.

(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.

N

N

152.02_Forest_2_26_2018

Add the following to Subsection 152.02:

152.02 Qualifications.

Conduct surveying and construction staking under the direction of a licensed professional engineer or land surveyor who is closely associated and familiar with the project.

Add the following to Subsection 152.04:

152.04 General.

For projects surveyed and staked using preliminary survey line (P-line) method, the government shall provide P-line traverse data and construction staking data showing the projected location of catch points.

Add the following to Subsection 152.05:

152.05 Survey and Staking Requirements.

(b) Centerline establishment. For P-line survey and staking method, establish the centerline (L-line) by measuring right or left from the preliminary survey line (P-line) on a bisector bearing the distance shown in the

Government-provided staking notes. Ensure that the station of the centerline point is that listed in the

Government-provided staking notes.

(1) P-line establishment. A preliminary survey line has been established on the ground for this project, with initial and succeeding survey points referenced. Reestablish missing P-line points as necessary to control subsequent construction staking operations to the precision designated in table 152-1.

Set additional intermediate P-line stakes at locations shown on the plans and listed in the construction staking notes, as needed to establish control for additional design features. Examples include but are not limited to:

beginning and ending of extra widening and turnout tapers; horizontal curves; and turnarounds.

(d) Slope and references stakes

(3) P-line staking method. Establish slope stakes, clearing limits, and reference stakes at right angles to each centerline station listed in the construction staking notes. Slope stakes and references shall be set on the cut side only, except through cuts or through fills where both sides are staked and referenced. Establish clearing limits on both sides of centerline.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit, mark with the offset distance to the slope stake, and duplicate the information on the slope stake.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-1.

Method II – Projected Catchpoint L-line reference. Stake information such as amount of cut or fill shall be provided in the government-provided staking notes. Slope stake catchpoints shall be located by measuring distances from the established centerline (L-line) location. Measurements and stake locations shall be along the cross section line perpendicular to the centerline (L-line) alignment. If field conditions do not match staking data stake according to method I.

Method III— Projected Catchpoint P-line reference. Stake information such as amount of cut or fill shall be provided in the government-provided staking notes. Slope stake catchpoints shall be located by measuring slope distances from the P-line as shown in the Government provided data. Measurements and stake locations shall be along the cross section line bisecting the preliminary survey line (P-line).

For stations within horizontal curves having a deflection angle greater than 20 degrees stake according to method

II.

If field conditions do not match staking data stake according to method I.

Table 152-1

Construction Survey and Staking Tolerances (1)

For P-line Survey and Staking method

Staking Phase Horizontal Vertical

P-line Accuracy requirements for reestablishing P-Line

1:100 closure with a max foresight and backsight rejection limit of 30 minutes

1:400 closure with a max foresight and backsight rejection limit of 0.50%.

Distance from P-line stake to centerline stake, slope stake, or reference stake.

±0.2 feet

±0.2 feet if staking with method I

Distance from slope stake to clear flag/stake

±1.0 feet

NA

153 - Contractor Quality Control 153.02_National_11_1_2016

Delete Subsection 153.02 and replace with the following:

153.02 Qualifications.

Submit the following for approval with the quality control plan:

(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.

(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation

Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast

Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and

Certification (M-TRAC)); or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

153.03_National_11_1_2016

Add the following paragraph to the end of Subsection 153.03(b):

153.03 Quality Control Plan.

(b) Quality Control Procedures.

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.07_National_11_1_2016

Delete Subsection 153.07 and replace with the following:

153.07 Records and control charts.

Maintain complete testing and inspection records by pay item number and make them accessible to the CO.

153.10_Regional_5_31_2018

Add the following Subsection:

153.04 (2) (a) Submittal Log At a minimum the contractor shall provide project submittals as shown on the Submittal Log below. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.

--- Refer to Statement of Work

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National_2_5_2019

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section.

Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in

Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed <number> minutes at any one time followed by an open period of no less than <number> minutes. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15.

All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National

Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown.

Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1

Temporary Road Closures

Road

Number From Terminus To Terminus

Maximum Consecutive

Days of Closure

Minimum Consecutive

Days Open

<number>

<MP or description>

<MP or description> <number> <number>

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See

Subsection 109.05.

157 - Soil Erosion and Sediment Control

157.01_0618_us_02_03_2019

Description

157.01 Add the following:

This includes protection of all phases of work during the life of the contract including storm events.

Delete Subsection 157.04 and replace with the following:

157.03 General.

Add the following:

Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.

When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.

21 days prior to the start of construction, submit a written plan that provides specific sediment control measures to minimize delivery of soil and turbidity into the stream during the construction period including a channel diversion and dewatering plan if dewatering is required. Include the sequence of operations and information on equipment, materials and suppliers. Measures given in the Plans and

Supplemental Specifications are minimum requirements, and may be revised only with written approval by the CO.

The turbidity of the water 100-200 feet downstream shall not be visually greater than the turbidity of the water upstream of the project site.

When this turbidity requirement or other erosion control measures are not met, immediately take corrective action. Cease operations that are causing turbidity and pump or otherwise improve the diversion of the stream around the construction site according to this specification and the Plans until the turbidity requirement can be met. When the interpretation of this requirement is in question, measure turbidity using a turbidity meter as approved by the CO, and provide documentation that operations are in compliance with FAR 52.236-7 Permits and Responsibilities, subsection 107.01 Laws to be Observed and subsection 107.10 Environmental Protection, and subsection 107.11, including but not limited to, the requirements of the National Marine Fisheries Service.

Do not begin work until the necessary controls for that particular phase of work have been implemented.

Incorporate all erosion control features into the project at the earliest practicable time, as agreed by the

CO.

Operate in a manner that will avoid harm to aquatic organisms whenever possible.

Notify the CO of the intention to dewater the stream, at least 10 days in advance. Do not re-route the stream until approved by the CO. The CO will not approve dewatering until a fisheries biologist and other Government personnel are present and prepared to rescue aquatic organisms. Dewater the stream slowly and incrementally in order to facilitate the fish rescue. The rescue operation will generally take several hours.

Do not release water through the newly constructed simulated streambed until approved by the CO.

After approval, release water slowly and incrementally over a period of at least one hour, or as approved by the CO. During this time, treat any water that does not meet the requirements of the turbidity standard stated in this specification.

157.04 Controls and Limitations on Work

Prior to construction, Contracting Officer will delineate critical riparian vegetation areas, wetlands, and other sensitive sites to prevent ground disturbance. Minimize disturbance to existing vegetation along stream.

Where necessary, danger tree removal may be required. Fell danger trees within riparian areas. Where possible, fell trees towards the stream. Dispose of trees as directed by the Contracting Officer.

Confine work within the construction limits marked by the Contracting Officer. Use existing roadways or travel paths whenever reasonable. Minimize the number of new access paths.

Dispose of waste material at approved sites.

When erosion control materials are to be left on site after the project has been completed, construct erosion controls of organic and bio-degradable materials whenever possible.

157.04(b) Add the following:

For the work immediately adjacent to the stream, use sediment control barriers between the work and the stream. Place sediment barriers prior to construction around sites where significant levels of erosion may enter the stream directly or through road ditches.

Provide straw bales and silt fence for sediment control measures for each channel crossing being constructed concurrently. Use only as needed for sediment control or when specified by the Contracting

Officer.

Provide waterproof membrane products to cover all stockpiled material adjacent to a live stream that is subject to erosion or water saturation. Cover stockpiles at the end of each work day and all day during the threat of precipitation or when specified by the Contracting Officer.

157.04(d) Delete the subsection and replace with the following:

Apply temporary turf establishment, mulch and stabilization measures on disturbed areas within three days of the last disturbance. Short-term stabilization measures may include the use of non-native sterile seed mix when native seeds are not available; weed-free certified straw, jute matting, and other similar techniques. Maintain short-term stabilization measures until permanent erosion control measures are effective.

157.04(f) Add the following:

When required by the Contracting Officer, loosen compacted areas, such as access roads, stream crossings, staging, and stockpile areas.

157.09 Diversions

Add the Following:

Construct stream diversion, related appurtenances and measures as follows:

(a) In Stream Work.

(1) Isolate construction area and coordinate with Contracting Officer for aquatic species removal by the Government. Coordinate aquatic species removal a minimum of 10 working days prior to beginning isolation of construction areas.

(2) Cease project operations under high flow conditions that inundate the project area, except for efforts to avoid or minimize resource damage.

(3) When approved, minimize time in which heavy equipment is in stream channels, riparian areas, and wetlands. Operate heavy equipment in streams only when Contracting Officer determines that such actions are the only reasonable alternative for implementation, or would result in less sediment in the stream channel or damage (short- or long-term) to the overall aquatic and riparian ecosystem relative to other alternatives.

(4) Clean and repair all equipment used in the in-stream work prior to entering the project area. Remove external oil and grease, along with dirt and mud, prior to construction.

Inspect equipment daily for leaks or accumulations of grease, and repair any identified problems prior to entering streams or areas that drain directly to streams or wetlands.

(5) Fuel and service equipment used for in stream or riparian work in an approved staging area outside of riparian zone. When not in use, store vehicles in the staging area.

(b) Stream Bypass Dam and Pipe. Construct a dam of material handling bags, and bypass pipe as shown on the Plans or as approved by the CO. The mining of material from the streambed or floodplain to construct diversions is not permitted. If diversion allows for downstream aquatic species passage, (i.e., is not screened), place diversion outlet in a location to promote safe reentry of aquatic species into the stream channel, preferably into pool habitat with cover.

(1) Primary Bypass Dam. Construct the material handling bag dam in a dry condition by first pumping the stream around the dam. Place temporary cofferdams as needed. Remove rock and other irregularities from the streambed to form smooth bedding for the bypass dam.

Place the dam so that water does not seep from the downstream side of the dam; if seepage occurs, improve the dam by adding bags, improving or adding seals, or other means to minimize seepage from the dam. When it is impossible to eliminate seepage, construct a sump and pump clear water to the upstream side of the dam.

(2) Bypass Dam Impermeable Membrane. Place an impermeable membrane within or on the upstream side of the dam and entrenched in the streambed as shown on the Plans or approved by the CO. When approved by the CO, a small amount of granular bentonite may be used along the edges of the membrane to minimize seepage between the membrane and the streambed. Cut a hole in the membrane to fit the bypass pipe and seal the membrane to the bypass pipe or the bypass pipe collar using gaskets, adhesive strips or other approved methods.

(3) Bypass pipe. Place bypass pipe as shown on the Plans or approved by the CO. Place the upstream invert of the pipe at the lowest point in the stream channel as practical. Install joints and elbows as shown on the Plans and as needed to accommodate the site layout.

Use watertight seals meeting the requirements of Subsection 712.03. Do not place backfill until the pipe joints have been approved by the CO. Allow water to pass through pipe only after a downstream splash apron has been prepared in a manner that will protect the stream from scour and turbidity, and protect fish from harm. Construct the bypass in a manner that avoids injury to aquatic organisms.

(4) Material handling bags. Use only clean sand or coarse concrete aggregate in the bags.

Loosely fill and tamp the bags in place to minimize seepage between, under, and around the bags.

(5) Bypass Pipe Collar. Install and maintain a leak-proof pipe collar as shown on the Plans or approved by the CO.

(6) Sediment Retention Pond. Provide a pond immediately downstream of the construction area capable of collecting and holding all seepage, drainage, and sediment not captured in stream diversion. Provide sufficient storing capacity to enable a sump pump to transfer the water, sediment and turbidity to a suitable treatment facility or area. Construct a downstream cofferdam to create a sediment retention pond when none is available immediately downstream of the project, when it is too small to use or to prevent water from entering the work area.

(c) Pumps. Install pumps as required to re-route stream around construction site and dewater foundations. When failure of a pump would result in movement of sediment or turbidity beyond the work area, provide a back-up pump that is readily available. When adjacent stream crossing projects are constructed concurrently, provide a minimum of one extra pump on site for the largest discharge site. Use the pumps for installing and removing the gravity bypass pipes and dams, at other times to facilitate construction operations, and during storms to supplement the gravity bypass. Pumps must have fish screens if used in streams where aquatic species are present and be operated in accordance with National Marine Fisheries Service (NMFS) aquatic species screen criteria. Equip the pump with approved screens, appropriate suction and discharge hoses, fittings and flow regulation equipment as needed. Insure that the pumps are clean, free of leaks and that the oil used as lubricant in the pump seal systems is food grade mineral oil. Install and operate pumps in a manner that will avoid impingement of small fish against the intake screens.

(1) Pump intakes. Use one of the following methods of screening on all draft hoses:

i. Perforated Plate; screen openings shall not exceed 3/32 or 0.0938-inches

ii. Profile Bar Screen; the narrowest dimension in the screen openings shall not exceed

0.0689-inches in the narrowest direction.

iii. Woven Wire Screen; screen openings shall not exceed 3/32 or 0.0938-inches the narrow direction.

Check intakes frequently and clean as needed with wire brushing, flushing, or any other acceptable method.

(2) Sump Pumps. Supply pumps capable of dewatering the structure foundation and sediment retention pond. Insure that pumps are clean and free of leaks. Remove sediment and turbidity in the Sump Pump discharge water prior to re-entering the stream.

(d) Sump Water Discharge. Discharge sump water as shown on the Plan or as approved by the CO.

Apply one or more methods to remove sediment from sediment-laden water. Apply additional methods as needed to eliminate increase in downstream turbidity. Use the following methods as needed:

(1) Natural Vegetation/Soil Dispersal and Filtration. Discharge sump water onto areas of ground most advantageous for dispersal and filtration of sediment, e.g. flat heavily vegetated soil. When single point discharge does not function adequately, discharge water into a perforated pipe or series of pipes laid approximately level so that the brown water disperses over a wide area.

(2) Silt Bag Filtration. Discharge sump water into one or more silt bags. Silt bags are constructed of Mirafi 180N (or approved equal) with sewn seam strengths of 90% efficiency according to ASTM D4632. Construct bag to hold and filter sump water. Place silt bag(s) on level ground having layer of straw one foot thick minimum.

(3) Settling Basin. Discharge sump water into one or more basins. The basins may be pre-manufactured tanks, folding tanks, geotextile or membranes placed over a sandbag or weed-free straw berm, or other similar basins designed to separate sediment from the water.

(4) Suspended Sediment Coagulation Agent. When other methods do not function adequately, add an approved coagulation agent to water prior to discharging the water onto natural vegetation, silt bag, or settling basin. Use a flocculation agent such as Chitisan-based

Storm-Klear Gel-Floc, or approved equal. Use suspended sediment coagulation agent according to manufacturer’s recommendations.

(e) Stream Re-Watering. Monitor downstream during rewatering to prevent stranding of aquatic organisms below the construction site. Ensure that concrete is sufficiently cured or dried before coming into contact with stream flow.

157.13 Maintenance & Cleanup

When removing sandbags, spread sand away from the waterway; if coarse concrete aggregate meeting the requirements of Subsection 703.02 is used in the sandbags, the gravel may be distributed evenly across the waterway.

Remove geotextile and other non-biodegradable materials used in dewatering and sediment control operations from Government property, unless otherwise approved by the CO.

201 - Clearing and Grubbing 201.04_National_11_2_2016

Add the following paragraph to Subsection 201.04:

201.04 Clearing.

(e) Do not cut vegetation less than 3 feet in height and less than 3 inches in diameter that is within the clearing limits but beyond the roadway and not in a decking area and that does not interfere with sight distance along the road unless otherwise designated.

201.04_National_9_10_2018

Delete paragraph (c) and replace with the following:

201.04 Clearing

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to maximum stump height shown in table below.

Utilization standards for merchantable timber are listed below. Fall and buck merchantable material into lengths not to exceed _____6____ feet. Pieces (logs) meet utilization standards when such pieces would have met

Utilization Standards if bucking lengths were varied to include such material.

Minimum Utilization Standards

Species

Maximum…

This is the start of the file's text. The full file is on GovTribe.