This file is a Request for Information (RFI) log and Questions and Answers document for solicitation 12445526B0005, the ANF FR154 Farnsworth Bridge Replacement project issued by the USDA Forest Service. As of March 16, 2026, the log contains three answered inquiries addressing critical project timeline concerns, bid opening date corrections, and specification documentation references.
The primary inquiry raised feasibility concerns regarding the project schedule, noting that with a bid opening of April 7, 2026, a potential 90-day bid hold period, and a final completion date of September 30, 2026, there would be insufficient time for fabrication and construction activities. The inquiry specifically identified that rebar, bridge beams, and bearing pad fabrication require 12 to 14 weeks minimum, with actual construction requiring an additional 12 weeks, and requested the government consider moving the completion date to November 30, 2026. The government responded that the completion date would remain September 30, 2026 but confirmed intent to award as soon as possible after April 7, 2026, potentially by mid-to-late April, and acknowledged the 90-day hold as standard language. A second inquiry identified a discrepancy between the advertisement bid opening date (April 7, 2026) and solicitation page 13 reference (March 31, 2026), which the government acknowledged as an administrative oversight and corrected to April 7, 2026 at 1:00 p.m. Eastern Time. The third inquiry requested the Project Manual with bid item descriptions, to which the government responded that no Project Manual exists and directed bidders to reference the Federal Highway Projects FP-14 specifications and Forest Service Supplemental Specifications (FSSS) for item definitions. This is a Total Small Business Set-Aside acquisition with a $45 million size standard threshold.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI log | As of 3/16/2026 | gov or FS = Forest Service | |
| Sol No. 12445526B0005 ANF FR154 Farnsworth Bridge Replacment | |||
| No. | Inquiry | Answer | Posted Supporting Documents If Applicable |
| 1 | We note the following: |
| 1) | The solicitation documents indicate a bid opening date of April 7, 2026. |
| 2) | The solicitation documents indicate that the bids may be held up to 90 days prior to award. |
| 3) | The solicitation documents indicate the final completion date including all site cleanup/restoration is September 30,2026. |
| 4) | With items 1 through 3 above taken into consideration, it appears that the construction contract may not be signed and a notice to procced issued until sometime in August 2026. This only allows between 4 to 8 weeks for shop drawings, rebar fabrication, beam fabrication, bearing pad fabrication and all of the construction to be completed. |
Once a notice to proceed is issued for this project, the rebar, bridge beams and bearing fabricators require at least 12 to 14 weeks for shop drawings and fabrication. Our cursory review of the plans reveals that the actual construction of the project will be at least 12 weeks. Recognizing that fabrication of beams and bearing pads can overlap some with the start of construction, the notice to proceed date would need to be no later than May 18, 2026 to meet the September 30, 2026 completion date. Also, the cure time on concrete placed for the abutments is an additional consideration regarding the completion date.
Understanding that the bid opening date is April 7, 2026, it seems highly unlikely that an award would be made, contracts executed and the notice to proceed issued by May 18, 2026. Will the USDA Forest Service consider moving the completion date to the end of November? Even with a completion date at the end of November, the contract award will need to made, contract executed and the Notice to Proceed issued no later than the end of June, 2026. The in-stream restriction dates could still be adhered to for the construction of the abutments. At this time the gov will not be moving the completion date. In the event there is a delay in award we would consider it, all of it dependent upon when the award can be executed.
The 90 days to hold bids is a standard language because sometimes things happen causing a delay in award. This is not the standard length of time for getting the award completed especially with IFB’s. We anticipate awarding as soon as possible after the April 7 date and it is quite possible to have it awarded by the middle to end of April.
| 2 | The advertisement says the job bids on 4/7/26 at 1:00 pm. When we review the documents, page 13 of 16 says the job bids on 3/31/26 at 1:00. | That was an administrative oversight. The gov will correct the dates. The bids are due 4/7/2026 at 1 pm eastern |
| 3 | In the attachments posted to SAM.gov for this project, we are not seeing the project manual with bid item descriptions outlined. Will you be providing that or can you direct us to where that located? | There is not a Project Manual for this project. The Item numbers in the bid generally refer to the Federal Highway Projects FP-14 and the Forest Service Supplemental Specifications to the FP-14 (FSSS). |
Here is a link to FP-14.
| https://highways.dot.gov/sites/fhwa.dot.gov/files/docs/federal-lands/specs/12851/fp14.pdf | https://highways.dot.gov/sites/fhwa.dot.gov/files/docs/federal-lands/specs/12851/fp14.pdf |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| 14 | |
| 15 | |
| 16 | |
| 17 | |
| 18 | |
| 19 | |
| 20 | |
| 21 | |
| 22 | |
| 23 | |
| 24 | |
| 25 | |
| 26 | |
| 27 | |
| 28 | |
| 29 | |
| 30 | |
| 31 | |
| 32 | |
| 33 | |
| 34 | |
| 35 | |
| 36 | |
| 37 | |
| 38 | |
| 39 | |
| 40 | |
| 41 | |
| 42 | |
| 43 | |
| 44 | |
| 45 | |
| 46 | |
| 47 | |
| 48 | |
| 49 | |
| 50 |
File details come from the government source that posted it. Updated .