This is a Questions and Answers document dated 13 March 2026 for the GAOA Monocle Lake Recreation Access contract opportunity. The document addresses six contractor inquiries regarding pavement construction specifications and material requirements.

The Q&A clarifies that HMA Base Crushing & Shaping involves placing 4 inches of MDOT standard 22A road gravel over the existing asphalt surface, which will then be pulverized, fine-graded, and compacted. The government confirms that 2 inches of asphalt is adequate for the project given the compacted pulverized asphalt and 22A gravel base, combined with expected vehicle traffic levels. Additional clarifications define technical specifications: Aggregate Base 22A as standard MDOT 22A road gravel, Traffic Control as road closed and men working signs per MUTCD requirements, HMA 4EL as the asphalt grade, and Shld CI II as standard stone for road shoulders. Density testing responsibilities are referenced in Amendment 1, Attachment 12. The document does not specify contract award dates, pricing terms, response deadlines, or set-asides.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA Monocle Lake Recreation Access Questions and Answers

13 March 2026

1. What do you mean by HMA Base Crushing & Shaping?

Answer: 4” of 22A road gravel will be placed over the existing asphalt surface.

2. Do you want the asphalt pulverized?

Answer: The gravel and existing asphalt will then be pulverized, fine graded, and compacted.

3. Installing 2” of asphalt is a very minimum driveway specification.

Answer: The base will be compacted pulverized asphalt and 22A road gravel, not bare rock.

4. I would suggest 3-4 inches minimum of asphalt over bare rock.

Answer: The 2” of asphalt is adequate with the additional gravel base and expected vehicle traffic.

5. Specific language defining the following items: Aggregate Base 22A, Traffic Control, HMA 4EL, and Shld CI II Answer:

Aggregate Base 22A: Yes standard MDOT 22A road gravel.

Traffic Control: Road closed sign, men working sign, etc. per MUTCD requirements.

HMA 4EL: Grade of asphalt.

Shld CI II: Standard stone used for road shoulders.

6. Who is doing the density testing?

Answer: See Amendment 1, Attachment 12