12445525R0003_Attachment_4_Plans_GMNF_FR278-0_24_Bridge_Superstructure_Replacement_1.pdf
PDF 6 MB Posted
- Attached to
- GAOA Forest Road 278 Bridge Structure Replacemet GMNF Federal contract opportunity
- Solicitation number
- 12445525R0003
- Issued by
- Department of Agriculture Forest Service
About this file
These are detailed engineering design plans for the Forest Road 278 Bridge Superstructure Replacement project located in the Green Mountain National Forest, Bennington County, Vermont. The comprehensive 18-sheet drawing set, prepared by DuBos & King for the USDA Forest Service Eastern Region, documents a bridge replacement over Bolles Brook, with structure number 092002000001068. The project involves removing the existing steel beam and timber deck bridge and constructing a new superstructure featuring W18X119 steel girders, a 5-inch glue-laminated (glulam) timber deck, 2x10 timber wearing surface, steel diaphragms, elastomeric bearings, and a TL-2 timber rail system. Key design specifications include HL-93 loading, Load and Resistance Factor Design (LRFD) method, and adherence to AASHTO LRFD Bridge Design Specifications, with construction to occur between July 1st and October 1st to minimize environmental impact.
The drawings provide extensive technical details including bridge framing plans, deck and girder connections, bearing device specifications, abutment details, erosion control measures, and roadway cross-sections. The design incorporates concrete repairs to existing abutments, riprap placement, aggregate surface course, and guardrail installations. Specific construction requirements include minimizing soil disturbance, implementing erosion control practices, performing work during specified timeframes, and ensuring all materials and construction methods meet federal highway and Forest Service supplemental specifications. The project aims to replace an aging bridge structure while maintaining environmental considerations and road infrastructure integrity in the Green Mountain National Forest.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12445525R0003 Questions and Answers GAOA FR278 Bridge Superstructure Replacement GMNF.docx | DOCX document | |
| 12445525R0003 Request for Proposal GAOA FR278 Bridge Structure Replacement GMNF.pdf | ||
| 12445525R0003_Attachment_1_SOI_FR278_Bridge_Superstructure_Replacement_GMNF_1.xlsx | XLSX spreadsheet | |
| 12445525R0003_Attachment_2_SOW_GMNF_FR278-0_24_Bridge_Superstructure_Replacement_1.docx | DOCX document | |
| 12445525R0003_Attachment_5_Wage_Determination_VT20240062_Heavy_Bennington_010325_1.pdf | ||
| 12445525R0003_Attachment_3_FSSS__FR278_Bridge_Superstructure_Replacement_GMNF_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
SHEET OF
United States Department of Agriculture Forest Service
TRAVEL DIRECTIONS:
FROM VT 9 IN WOODFORD, VT, TURN LEFT ONTO HARBOUR ROAD. TRAVEL NORTH ALONG HARBOUR ROAD FOR APPROXIMATELY 1.7 MILES TO THE END OF THE PAVED ROADWAY. CONTINUE ON FOREST ROAD 278 FOR 0.24 MILES TO REACH THE BRIDGE AT MILE POST 0.24. 42°55'18"N, 73°6'21"W.
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER
REGIONAL DIRECTOR OF ENGINEERING DATE
7/1 2/2
4 1 4:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 1 -
C
OV
ER
.D
W G;
(R09) EASTERN REGION
GREEN MOUNTAIN NATIONAL FOREST
BENNINGTON COUNTY
VERMONT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
C-01 TITLE SHEET 7/12/2024
C-02 GENERAL NOTES 7/12/2024
C-03 TYPICAL SECTIONS AND DETAILS 7/12/2024
C-04 EXISTING CONDITIONS PLAN 7/12/2024
C-05 PROFILES 7/12/2024
C-06 SITE PLAN 7/12/2024
C-07 GENERAL PLAN AND ELEVATIONS 7/12/2024
C-08 FRAMING PLAN AND GIRDER ELEVATION 7/12/2024
C-09 DIAPHRAGM AND CLIPPING DETAILS 7/12/2024
C-10 DECK AND DIAPHRAGM DETAILS 7/12/2024
C-11 BEARING DEVICES 7/12/2024
C-12 BEARING DEVICES 7/12/2024
C-13 ABUTMENT 1 & 2 DETAILS 7/12/2024
C-14 ROAD CENTERLINE SECTIONS 7/12/2024
C-15 CHANNEL CENTERLINE SECTIONS 7/12/2024
C-16 EROSION PREVENTION AND SEDIMENT CONTROL DETAILS7/12/2024
C-17 TERMINAL UNIT DELINEATION SHEET 7/12/2024
C-18 TIE SHEET 7/12/2024
FR 278-0.24 BRIDGE SUPERSTRUCTURE
REPLACEMENT OVER BOLLES BROOK
STRUCTURE NUMBER: 092002000001068
PROJECT
LOCATION
PROJECT
LOCATION
REGIONAL STRUCTURAL ENGINEER
FOREST SUPERVISOR
DATE
DATE
DATE
DATE
STANDARD SHEETS
FIGURE 3 WOOD BRIDGE RAILING DESIGN DETAILS
FIGURE 4 APPROACH GUARDRAIL TRANSITION DESIGN DETAILS
VTRANS STANDARDS
STANDARD DATE
G-1D STEEL BEAM GUARDRAIL END TERMINALS 3/10/2017
DESIGN LOADS, MATERIALS AND SPECIFICATIONS:
(1) DESIGN LOADING: HL-93
(2) DESIGN METHOD: LOAD AND RESISTANCE FACTOR DESIGN (LRFD)
(3) SPECIFICATIONS: AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 9TH ED., 2020
APA- THE ENGINEERED WOOD ASSOCIATION GLULAM
PRODUCT GUIDE, JUNE 2023
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY
ADMINISTRATION STANDARD SPECIFICATIONS FOR THE
CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL
HIGHWAY PROJECTS, FP-14 and FSSS
NATIONAL DESIGN SPECIFICATION (NDS) FOR WOOD
CONSTRUCTION, 2024
GENERAL NOTES:
1. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE U.S. DEPARTMENT OF
TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION STANDARD SPECIFICATIONS
FOR THE CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS,
FP-14 (2014) AND FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS).
2. ALL DIMENSIONS ARE HORIZONTAL AND VERTICAL, AND ARE GIVEN AT 68 DEGREES
FAHRENHEIT.
3. DRAWINGS ARE ON ASSUMED DATUM. NORTHING, EASTING, AND ELEVATION ARE NOT
TIED TO VT STATE PLANE. NORTH WAS DERIVED FROM A COMPASS BEARING TAKEN
ON 5-24-23
4. ALL DIMENSIONS AND FIELD CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR
PRIOR TO COMMENCEMENT OF THE WORK.
5. THE CONTRACTOR SHALL REVIEW AND UNDERSTAND ALL APPLICABLE
ENVIRONMENTAL PERMITS AND ENSURE THAT ALL CONSTRUCTION CONDITIONS ARE
MET.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION SAFETY, AND MEANS
AND METHODS TO PERFORM AND COMPLETE THE WORK. THE CONSTRUCTION
CONTRACTOR SHALL PREPARE OR OBTAIN THE APPROPRIATE SAFETY SYSTEMS
WHICH MAY BE REQUIRED BY THE U.S. OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) AND ALL APPLICABLE REGULATIONS. THESE PLANS AND
PROFESSIONAL SEALS DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE
SAFETY OF THE CONSTRUCTION CONTRACTOR OR THEIR EMPLOYEES, AGENTS, OR
REPRESENTATIVES IN THE PERFORMANCE OF THE WORK.
7. THE CONTRACTOR SHALL SUBMIT LITERATURE (MANUFACTURERS LITERATURE, CUT
SHEETS, APPLICATION PROCEDURES, ETC.) FOR ALL PRODUCTS PROPOSED FOR USE
ON THE PROJECT, FOR APPROVAL BY THE CONTRACTING OFFICER'S REPRESENTATIVE
(C.O.R).
8. THE CONTRACTOR SHALL COMPACT THE ROADWAY SUBGRADE AFTER EXISTING
MATERIAL IS REMOVED AND PRIOR TO THE PLACEMENT OF ANY ADDITIONAL OR NEW
MATERIAL. SUBGRADE SHALL MEET 95% COMPACTION.
9. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO ENSURE THAT DEBRIS
DOES NOT FALL ON ANY WATERWAY BELOW THE EXISTING STRUCTURE. ALL COSTS,
INCLUDING ERECTION, MAINTENANCE AND REMOVAL OF TEMPORARY STRUCTURES
OR OTHER SUCH APPROVED METHODS, SHALL BE SUBSIDIARY TO THE APPROPRIATE
ITEMS OF WORK BEING PERFORMED.
10. ALL WASTE MATERIAL INCLUDING UNUSED EXCAVATED MATERIAL SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF U.S. GOVERNMENT
(NATIONAL FOREST) LAND IN AN APPROVED LANDFILL. THERE ARE NO GOVERNMENT
DISPOSAL SITES OR PITS AVAILABLE FOR THIS PROJECT.
11. ALL SOIL MOVING EQUIPMENT SHALL BE THOROUGHLY CLEANED TO MAKE IT FREE OF
SOIL, NON-NATIVE INVASIVE SPECIES OR OTHER DEBRIS THAT COULD CONTAIN OR
HOLD SEEDS PRIOR TO BEING DELIVERED TO THE PROJECT SITE. EQUIPMENT SHALL
BE CONSIDERED FREE OF NON-NATIVE OR INVASIVE SPECIES AND OTHER SUCH
DEBRIS WHEN A VISUAL INSPECTION BY THE C.O.R., COMPLETED PRIOR TO THE
EQUIPMENT BEING MOVED TO THE SITE, DOES NOT DISCLOSE SUCH MATERIAL
PRESENT.
12. PRIOR TO REMOVAL OF EQUIPMENT FROM THE PROJECT SITE, ALL SOIL MOVING
EQUIPMENT SHALL BE THOROUGHLY CLEANED TO MAKE IT FREE OF SOIL,
VEGETATION, OR OTHER DEBRIS.
13. FR 278 SHALL BE CLOSED WITHIN THE PROJECT LIMITS AS SHOWN ON SHEET C-06 FOR
THE DURATION OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE SIGNS AND
CLOSE GATE AS APPROVED BY THE C.O.R..
14. ALL EXPOSED RIPRAP AND AGGREGATE SURFACE COURSE SHALL BE BROWN, DARK
GREY OR EARTH TONE IN COLOR. THE C.O.R. SHALL APPROVE COLOR PRIOR TO
PURCHASE OR PLACEMENT BY THE CONTRACTOR.
15. THE CONTRACTOR SHALL PERFORM ALL IN-STREAM WORK BETWEEN JULY 1ST AND
OCTOBER 1ST.
16. THE WORK COVERED BY THESE PLANS INCLUDES THE REMOVAL OF THE EXISTING
STEEL BEAMS, TIMBER DECK, AND RAILING SYSTEM, INSTALLATION OF THE NEW
GLU-LAM DECK, STEEL BEAMS, STEEL DIAPHRAGMS, AND TIMBER WEARING SURFACE,
CONCRETE ABUTMENT REPAIRS, RAILING SYSTEM, APPROACH ROADWAY WORK
INCLUDING GUARDRAIL STEEL BEAMS AND PLACEMENT OF EROSION CONTROL
MEASURES.
17. THE CONTRACTOR SHALL NOTIFY DIG SAFE (DIAL 888-344-7233 OR 811 OR SUBMIT
TICKET AT DIGSAFE.COM) A MINIMUM OF 3 DAYS PRIOR TO THE START OF WORK. IF
RELOCATION OF UTILITIES IS NECESSARY, THE CONTRACTOR IS RESPONSIBLE FOR
COORDINATING WORK WITH THE UTILITY COMPANY.
18. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKING.
CONSTRUCTION STAKING SHALL BE IN ACCORDANCE WITH FP-14 REQUIREMENTS. ALL
COSTS ASSOCIATED WITH THIS SHALL BE PAID FOR UNDER ITEM 15201,
CONSTRUCTION AND SURVEY.
19. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING THE EXPECTED WATER LEVELS DURING CONSTRUCTION.
20. LOCATE STAGING AREAS AWAY FROM SENSITIVE AREAS INCLUDING WETLANDS AND
STREAM BUFFERS IN COMPLIANCE WITH REGULATIONS AND PERMIT REQUIREMENTS
21. TO LIMIT INADVERTENT DAMAGE TO AND UNAUTHORIZED REMOVAL OF TREES
ADJACENT TO THE WORK AREA, CONTRACTOR SHALL COORDINATE WITH THE C.O.R.
AND OBTAIN APPROVAL PRIOR TO CUTTING OR TRIMMING TREES WITHIN AND
ADJACENT TO THE WORK AREA.
22. ALL MATERIALS USED ON THIS PROJECT SHALL CONFORM TO THE TECHNICAL
SPECIFICATIONS. FOR ANY DISCREPANCY BETWEEN THE PLANS AND MATERIAL
SPECIFICATIONS, THE TECHNICAL SPECIFICATIONS SHALL TAKE PRECEDENCE OVER
NOTES CONTAINED WITHIN THESE PLANS.
23. VERIFY ALL INDICATED CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE
COMMENCING ANY FABRICATION, ORDERING OF MATERIAL, OR PERFORMING ANY
WORK. NOTIFY THE C.O.R. OF ANY CONDITIONS OR DIMENSIONS THAT WOULD
PREVENT OR HAMPER THE PERFORMANCE OF THE WORK IN ACCORDANCE WITH THE
CONTRACT DRAWINGS AND SPECIFICATIONS.
24. SUBMIT SHOP DRAWINGS FOR BRIDGE DECK PANELS, STEEL STRINGERS, AND BRIDGE
RAILINGS. ALL SHOP DRAWINGS TO BE STAMPED BY VERMONT P.E.
BRIDGE REMOVAL NOTES:
25. THE CONTRACTOR SHALL SUBMIT, FOR DOCUMENTATION, A DETAILED OUTLINE OR
PLAN OF THE PROPOSED METHOD OF REMOVAL OF THE EXISTING BRIDGE
COMPONENTS PRIOR TO THE COMMENCEMENT OF ANY WORK.
26. THE EXISTING BRIDGE SUPERSTRUCTURE SHALL BE REMOVED IN ITS ENTIRETY
INCLUDING THE TIMBER DECK, TIMBER RAILING, STEEL GIRDERS, STEEL DIAPHRAGMS,
AND BEARINGS AND ALL ASSOCIATED HARDWARE, AND SHALL BE PAID FOR UNDER
ITEM 20303 REMOVAL OF BRIDGE SUPERSTRUCTURE. DAMAGE TO THE ABUTMENT
BRIDGE SEAT INCLUDING AT EXISTING BEARING PAD ANCHOR BOLTS SHALL BE
SEALED AND GROUTED. THIS WORK WILL BE INCIDENTAL TO ITEM 20303. ALL
MATERIALS REMOVED SHALL BE THE PROPERTY OF THE CONTRACTOR AND SHALL BE
DISPOSED OF APPROPRIATELY.
GRADING:
27. SEED AND MULCH ALL DISTURBED AREAS. TURF ESTABLISHMENT AND SEEDING SHALL
BE IN ACCORDANCE WITH FHWA FP14 SECTION 625 TURF ESTABLISHMENT, DRY
METHOD AND SHALL BE PAID FOR UNDER ITEM 62502 TURF ESTABLISHMENT. MULCH
SHALL BE ROLLED EROSION CONTROL PRODUCT, TYPE 1A, WHICH SHALL BE PAID FOR
UNDER 62901. SEED SHALL BE APPLIED AT A RATE OF 75 LB/ACRE.
28. THE CONTRACTOR SHALL FURNISH AGGREGATE SURFACE COURSE TO THE GRADING
SPECIFIED IN THESE PLANS
29. COMPACTION TESTING IS REQUIRED ON BACKFILL AREAS. REFER TO APPLICABLE
DETAILS AND SPECIFICATIONS.
TIMBER MATERIALS AND TREATMENT:
30. LUMBER FOR GLULAM PRODUCTION TO BE VISUALLY OR MECHANICALLY GRADED IN
CONFORMANCE WITH THE CURRENT EDITION OF "AASHTO LRFD BRIDGE DESIGN
SPECIFICATION" OR "NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION."
31. GLULAM MEMBERS TO BE FINISHED TO INDUSTRIAL APPEARANCE GRADE PER AITC
110-2001.
32. ALL GLULAM MATERIAL SHALL CONFORM TO THE REQUIREMENTS OF ANSI/AITC A190.1
AND BE STAMPED WITH AITC QUALIFY MARK OR AN APA-EWS TRADEMARK. PLACE
STAMPS ON SURFACES THAT WILL NOT BE EXPOSED TO VIEW IN THE COMPLETED
STRUCTURE. SUBMIT CERTIFICATES OF CONFORMANCE BY AN ACCREDITED
INSPECTION AND TESTING AGENCY INDICATING THE GLULAM MEMBERS CONFORM TO
THE REQUIREMENTS OF ASTM A190.1.
33. GLULAM MEMBERS SHALL BE MANUFACTURED FROM SOUTHERN PINE LAMINATING
LUMBER.
34. THE CONTRACTOR SHALL HAVE THE OPTION TO SUBMIT AN ALTERNATIVE DECK PANEL
DESIGN UTILIZING DOWEL LAMINATED PANELS. ALTERNATIVE DESIGN SHALL
INCORPORATE MATERIEL DETAILS AND CALCULATIONS STAMPED BY A STRUCTURAL
ENGINEER LICENSED IN THE STATE OF VERMONT SUBMITTED TO COR FOR APPROVAL.
IF CONTRACTOR ELECTS TO SUBMIT ALTERNATIVE DECK PANEL, PAYMENT FOR
ALTERNATIVE DECK, DESIGN, REVIEW, AND APPROVAL SHALL BE PAID FOR UNDER
ITEM 55701A.
35. ADHESIVES USED IN THE GLULAM MANUFACTURING PROCESS SHALL CONFORM TO
THE AITC 405 FOR WET USE ADHESIVES.
36. GLULAM MEMBERS SHALL BE AS FOLLOWS AND CONFORM TO AASHTO TABLE
8.4.1.2.3-2:
A. DECK PANELS: COMBINATION 48, GRADE N2D14
B. CURBS AND SPACER BLOCKS: COMBINATION 47, GRADE N2M14
C. RAIL AND RAIL POSTS: COMBINATION 48, GRADE N2D14
40. SIZES OF GLULAM MEMBERS SHALL BE AS SHOWN ON THE DRAWINGS.
41. TO THE EXTENT POSSIBLE, SHOP-FABRICATE ALL GLULAM CONNECTIONS INCLUDING
CUTTING TO THE LENGTH AND DRILLING BOLT HOLES. END GAPS BETWEEN MEMBERS
SHALL BE UNIFORM AND NOT EXCEED 18". HOLES SHALL BE DRILLED PERPENDICULAR
TO THE FACE OF THE MEMBER. DRILL WIDE MEMBERS FROM BOTH SIDES AS
REQUIRED TO PREVENT MISALIGNMENT OF HOLES.
42. ALL GRADING, COMBINATIONS, AND SIZE REFER TO SOUTHERN YELLOW PINE UNLESS
NOTED OTHERWISE ON THE PLANS. THE DESIGN VALUES FOLLOW LRFD SECTION 8.4.1.
THESE ARE THE MINIMUM REQUIREMENTS. OTHER SPECIES MAY BE USED WITH
APPROVAL FROM THE C.O.R. AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
43. TIMBER PRESERVATION TREATMENT SHALL BE IN ACCORDANCE WITH CURRENT
STATE AND/ OR AASHTO SPECIFICATIONS. ALL TIMBER SHALL BE TREATED WITH
COPPER NAPHTHENATE HYDROCARBON SOLVENT A, PER AWPA, UC4C (MINIMUM).
44. TO EXTENT PRACTICAL, ALL BRIDGE COMPONENTS TO BE FABRICATED (HOLES
DRILLED, CUTS MADE, ETC.) PRIOR TO PRESERVATIVE TREATMENTS PROCESS. FIELD
FABRICATION TO BE TREATED IN ACCORDANCE WITH AWPA STANDARD M4.
45. ABUTMENT BACKWALL TO BE NO.1 GRADE VISUALLY GRADED SOUTHERN YELLOW
PINE, P.T.
46. TIMBER WEARING SURFACE TO BE ROUGH SAWN HEMLOCK. PLANK LENGTH SHALL BE
A MINIMUM OF 8 FEET, EXCEPT FOR END PANELS, WHICH SHALL BE 4 FEET IN LENGTH.
47. ALL TIMBER TO BE CUT EXACT LENGTH, DRESSED TO SIZE REQUIRED AND ALL
PRACTICAL FRAMING TO BE DONE PRIOR TO TREATMENT.
48. ALL DECK PLANKS SHALL BE PREDRILLED PRIOR TO TREATMENT.
49. ALL PLANK FOR DECK PANELS SHALL BE PRECISION END TRIMMED TO LENGTH WITH
1/4" UNDERLENGTH & NO OVERLENGTH TOLERANCE PERMITTED.
50. DECK PANELS WILL BE DELIVERED TO JOBSITE AFTER BEING FULLY ASSEMBLED AT
FABRICATION PLANT.
51. ALL TIMBER HARDWARE TO MEET ASTM A307-97 GALVANIZED TO A153. ALL HIGH
STRENGTH HARDWARE TO MEET ASTM A325 OR A449 GALVANIZED TO A153.
STRUCTURAL STEEL:
52. STRUCTURAL STEEL BEAMS, DIAPHRAGMS, STIFFENERS AND CONNECTION PLATES
WILL BE PAID FOR UNDER ITEM 55502, "STRUCTURAL STEEL, FURNISHED, FABRICATED,
AND ERECTED" AND SHALL CONFORM TO AASHTO 270M/M270 GRADE 50 UNLESS
NOTED OTHERWISE.
53. ALL BOLTED CONNECTIONS SHALL BE MADE WITH ASTM F3125 GRADE A325 TYPE 3 7/8"
DIAMETER HIGH STRENGTH BOLTS IN STANDARD 15/16" HOLES UNLESS OTHERWISE
NOTED.
54. ANY CONNECTIONS THAT ARE NOT DETAILED ON THE PLANS SHALL BE DETAILED BY
THE FABRICATOR AND SUBMITTED TO THE C.O.R. FOR APPROVAL. ALL ASSOCIATED
COSTS SHALL BE INCIDENTAL TO THE CONTRACT.
55. BEARING STIFFENERS AND GIRDER ENDS SHALL BE PLUMB UNDER FULL DEAD LOAD
DEFLECTION.
56. UNLESS NOTED OTHERWISE, ALL BOLTED CONNECTIONS SHALL BE SLIP CRITICAL
WITH CLASS B FAYING SURFACES.
57. THE STRUCTURAL STEEL SHALL BE PAINTED WITH A SHOP APPLIED PAINT SYSTEM IN
ACCORDANCE WITH SECTION 563 OF THE SPECIFICATIONS. ANY AREAS OF DAMAGE
DURING THE SHIPPING OR PLACEMENT OF THE STEEL SHALL BE REPAIRED IN
ACCORDANCE WITH THIS SECTION. THE COLOR SHALL CONFORM TO FEDERAL
STANDARD NO. 595, COLOR CHIP NUMBER 20059 AND SHALL BE APPROVED BY THE
C.O.R.
CONCRETE:
58. CONCRETE FOR ANY NECESSARY SUBSTRUCTURE REPAIRS SHALL BE PAID FOR
UNDER ITEM 55221, "REPAIR CONCRETE" AND SHALL BE IN ACCORDANCE WITH
SECTION 552. ALL NECESSARY SUBSTRUCTURE REPAIRS SHALL BE APPROVED BY THE
C.O.R. IN ADVANCE OF THE START OF ANY ABUTMENT REPAIR WORK.
59. CONCRETE STRENGTH SHALL BE f ' c = 4,500 PSI MINIMUM.
60. REINFORCING STEEL SHALL BE BLACK AND BE GRADE 60.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/3 1/2
4 1 6:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 2 G
EN
RA
L
NO
TE
S.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
GENERAL NOTES
C-02
VARIES
TRAVELED
WAY
C FOREST ROAD 278
TYPICAL ROADWAY SECTION
NOT TO SCALE
2% 2%
L
STEEL BEAM GUARDRAIL WITH
TIMBER POSTS (8' LENGTH),
ITEM 61701 (TYP.)
EXISTING GROUND (TYP)
SLO
PE V
ARIES
SHOULDER SLOPE FOR 1'=0" (MIN.)
THEN SLOPE TO MATCH (SEE
TYPICAL SECTIONS AND GRADE
BREAK LIMITS ON PLAN SHEETS}
SUBBASE ITEM 30105,
THICKNESS VARIES
TO MATCH PROFILE
6" AGGREGATE
SURFACE COURSE
(SEE NOTE)
NOTE:
· THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO
PRIVATE OR PUBLIC PROPERTY OUTSIDE THE LIMITS OF CONSTRUCTION SHOWN ON
THE PLANS CAUSED BY THE CONTRACTOR, AT THE SOLE COST TO THE CONTRACTOR.
SELECT BORROW, ITEM 20410
(TYP)
VARIES
(TYP.)
NOT TO SCALE
PLACED
RIPRAP
METHOD A,
CLASS 4, ITEM
25101
TYPICAL CHANNEL SECTION
NOT TO SCALE
EXISTING ABUTMENT
OR WINGWALL
1'-0" (TYP.)3'-0" (TYP.)
BOTTOM OF EXISTING CHANNEL
2:1 SLOPE
2:1 SLOPE
3'-0"
(TYP.)
3'-0"
SECTION AT RAILPOST
NOT TO SCALE
A
A
RAILPOST BLOCK
RAIL POST
DM. HD. BOLTS WITH
PLATE WASHER EA.
SHOP DRILL POST
DM. HD. BOLT WITH
PLATE WASHERS, POST
TO CURB, SHOP DRILL
DM. HD. LAG SCREW
WITH PLATE WASHERS,
RAIL POST TO DECK,
SHOP DRILL POST
DM. HD. BOLT WITH PLATE
WASHERS, CURB TO DECK,
FIELD DRILL DECK
2" TIMBER WEARING SURFACESCUPPER
CURB
SPLIT RINGS, CURB TO SCUPPER,
SCUPPER TO DECK, SHOP DRILL
CURB AND SCUPPER, FIELD DRILL
GLU-LAM RAIL
5" GLULAM DECK
STRUCTURAL TIMBER AND
LUMBER, TREATED,
COMPOSITE ITEM 55701A
W18X119
STRUCTURAL
STEEL
ITEM 55502
TYPICAL BRIDGE SECTION
NOT TO SCALE
2" TIMBER
WEARING
SURFACE,
ITEM 55701C
12' - 0" TRAVELED WAY
14' - 0" DECK WIDTH
4 SPACES @ 2'-10"=11'-4"
1'-4"
(TYP)
SECTION A-A
NOT TO SCALE
TL-2 TIMBER RAIL SYSTEM
GLU-LAM,
2X10 TIMBER WEARING SURFACE
CURB
SCUPPER
ABUTMENT SEAT DETAIL
SCALE: NOT TO SCALE
PROPOSED TIMBER
BACKWALL
(SEE NOTE)PROPOSED 5" GLULAM
DECK
STEEL BEAM
SOLE PLATE
ELASTOMERIC BEARING
NOTE: EXISTING TIMBER BACKWALL TO BE REPLACED IN KIND WITH 6x6 SOUTHERN YELLOW PINE AND BE PAID FOR UNDER ITEM 55701B. ANCHOR BOLT AND OTHER HARDWARE TO BE INCIDENTAL TO ITEM 55701B.
TIMBER
WEARING
SURFACE
SEPARATION
STABILIZATION
GEOTEXTILE, ITEM 20701
EXISTING CONCRETE
ABUTMENT
LIMITS OF EXCAVATION
AND LIMITS OF BACKFILL,
ITEM 20435
PROPOSED GRADE
2'-0"
2'-0"
C BRGL
1'-6" EMBEDMENT (MIN.) DRILL AND GROUT 3/4" DIAM.
ANCHOR BOLT SPACED AT 1'-0" O.C.
6" AGGREGATE SURFACE
BACKFILL, ITEM 20435
AGGREGATE SURFACE COURSE
RIPRAP CLASS 4
SUBBASE
LEGEND:
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/2 /24
:4
1 B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0
6 T
YP
S
EC
TI
ON
S.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
TYPICAL SECTIONS AND
DETAILS
C-03
2+86.48
1+07.77 2+00.001+50.00
2+50.00
FLO
W
N18° 23' 24.49"W 117.443
N01° 10' 12.02"E26.404
4+
.4
5+00.00
5+
.9
BP: 4+33.49
EP: 5+72.98
BP
: 1
+0 7.
PC
: 2
+2 5.
M id
: 2 +4
2.
PT
: 2
+6 0.
EP
: 2
+8 6.
TO WOODFORD, V T
BM #2240
BM# 2238
HVCT PT #3
HVCT PT #2
HVCT PT #1
BO
LLES BR
O O
K
FOREST ROAD 278
EDGE OF EXISTING BROOK
EXISTING SIGN TO BE
REMOVED (TYP)
C BOLLES BROOK
C ROADWAYL
L
EXISTING
SUPERSTRUCTURE TO
BE REMOVED
EXISTING RIP-RAP
EDGE OF EXISTING
GRAVEL ROADWAY
EXISTING ABUTMENTS
TO REMAIN
NOTES:
1. HORIZONTAL CONTROL POINT COORDINATES ARE NOTED ON THE
SURVEY TIE SHEET.
LEGEND:
EXISTING RIP-RAP
EXISTING CONDITIONS PLAN
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 2/2
4 1 2:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 3 E
XI
ST
IN
G
CO
ND
IT
IO
NS
P
LA
N.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
EXISTING CONDITIONS
PLAN
C-04
00 10' 20'
SCALE IN FEET
10' 40'
W18X119
STRUCTURAL STEEL
DATUM ELEV
9980.00
10000
10010
10000
10010
.4
.5
0.
.9
5+004+50 5+50
GLULAM BRIDGE
RAIL AND CURB
(TYP.)
C BRIDGEL
14'-0" GLULAM TIMBER DECK
EXISTING STREAMBED BOTTOM
12'-0"
TRAVELED WAY
EL
EV
AT
IO
N (F
EE
T)
10000
10010
10000
10010
0+92.50 1+00
.3
1+50
.2
.4
0.
0.
2+00
.6
0.
.8
0.
2+50
.4
.7
.5
2+86.48
.7
PVI STA: 1+65.49
PVI ELEV: 10000.79
K: 1.25
LVC: 20'
PV
C
: 1 +5
5.
EL
EV
: 9
9.
PV
T:
+7
5.
EL
EV
: 1
.6
-1.9%
-15.0%
6" MINIMUM AGGREGATE SURFACE COURSE
ITEM 30112
EXISTING GROUND
BEGIN AGGREGATE SURFACE
STA 1+42
MATCH EXISTING GRADE
EL: 9997.26
BE
G
IN
B
R
ID
G E
ST
A.
+7
7.
, E L:
.6
7)
EN
D
B R
ID
G
E
ST
A.
2+
.1
4, E l.
0.
PROPOSED STEEL GIRDER WITH GLULAM DECK
SUPERSTRUCTURE
6" MINIMUM AGGREGATE SURFACE COURSE
ITEM 30112
END AGGREGATE SURFACE
STA 2+69
MATCH EXISTING GRADE
EL: 9999.38
EXISTING ABUTMENTS (TYP)
SUBBASE MATERIAL AS NEEDED
TO MATCH PROFILE, ITEM 30105
PROFILE - CENTERLINE FOREST ROAD 278
SCALE: 1"=10' HORIZONTAL
1"=5' VERTICAL
PROFILE - CENTERLINE BOLLES BROOK DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 0/2
4 1 6:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 3 P
RO
FI
LE
S.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
PROFILES
C-05
FLO
W
FLO
W
FOREST ROAD 278
EXISTING WINGWALL (TYP.)
BEGIN BRIDGE
STA. 1+77.29 END BRIDGE STA.2+19.14
PLACED RIPRAP,
METHOD A, CLASS 4 ITEM
25101B (TYP)
STEEL BEAM GUARDRAIL
WITH TIMBER POSTS (TYP)
END AGGREGATE.
MATCH EXISTING.
STA 2+69
BEGIN AGGREGATE SURFACE COURSE.
MATCH EXISTING. STA 1+42
AGGREGATE SURFACE ROADWAY (TYP)
EDGE OF PROPOSED
ROADWAY (TYP)
INSTALLATION OF GUARDRAIL MAY REQUIRE THE
EXCAVATION OF EXISTING BOULDERS. ALL WORK TO BE
INCLUDED UNDER ITEM 61701, GUARDRAIL SYSTEM G4.
LIMITS OF EXISTING
GRAVEL ROADWAY (TYP)
INSTALL OBJECT MARKER (TYP), ITEM 66301
(SEE OBJECT MARKER DETAIL ON SHEET C-17)
TRAVELED WAY
12'-0"
12'-0"
BOLLES BROOKCL
CL
TO WOODFORD, V T
5+73
4+33
4+50
5+00
5+50
2+
1+
1+
2+00
2+
PROPOSED TOE OF SLOPE (TYP)
SLOPE BREAKLINE (TYP)
CLEARING AND GRUBBING WITHIN
LIMITS OF TOE OF SLOPE (TYP)
BEGIN PROJECT
STA 1+18.61
END PROJECT
STA 2+80.89
RIPRAP, CLASS 2
ITEM 25101A (TYP.)
EDGE OF ROADWAY TAPER BEGIN STA 2+50
EDGE OF ROADWAY TAPER END STA 1+50
SLOPE BREAKLINE (TYP)
SITE PLAN
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/3 /24
:2
7 B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_S
IT
E
PL
AN
.D W
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
SITE PLAN
C-06
00 10' 20'
SCALE IN FEET
10' 40'
RIPRAP CLASS 2
LEGEND:
AGGREGATE SURFACE COURSE
RIPRAP CLASS 4
FLO
W
FOREST ROAD 278
EXISTING WINGWALL (TYP.)
BEGIN BRIDGE
STA. 1+77.29
END BRIDGE STA.2+19.14
PLACED RIPRAP,
METHOD A, CLASS 4 ITEM
25101B
STEEL BEAM GUARDRAIL
WITH TIMBER POSTS (TYP)
END AGGREGATE
STA. 2+69
MATCH EXISTING
MATCH EXISTING
STA. 1+42
GRAVEL ROADWAY (TYP)
EDGE OF PROPOSED
ROADWAY (TYP)
INSTALLATION OF
GUARDRAIL MAY REQUIRE
THE EXCAVATION OF
EXISTING BOULDERS. ALL
WORK TO BE INCLUDED
UNDER ITEM 61701,
GUARDRAIL SYSTEM G4.
LIMITS OF EXISTING
GRAVEL ROADWAY (TYP)
INSTALL OBJECT MARKER (TYP), ITEM 63301
(SEE OBJECT MARKER DETAIL ON SHEET C-17)
(TYP.)
TRAVELED WAY 12'-0"
12'-0"
TRAVELED WAY
BOLLES BROOKCLCL
TO WOODFORD, V T
5+00
1+
2+00
2+
EDGE OF
ROADWAY TAPER
END STA 1+50
PROPOSED TOE OF SLOPE (TYP)
PROPOSED GRADE
BREAK (TYP)
EDGE OF ROADWAY
TAPER BEGIN STA 2+50
10'-33 8"
9'-21 8"
STEEL BEAM GUARDRAIL WITH
STEEL POST (TYP).
SEE VTRANS STANDARD G1-D
SLOPE BREAKLINE
(TYP.)
BEGIN AGGREGATE
PLACED RIPRAP, METHOD A, CLASS 2
ITEM 25101A AT BACK OF EACH
WINGWALL (TYP.)
EXISTING STREAMBED
4'-0"8'-0"4'-0"6 SPACES OF 18 34"3 SPACES OF 3'-11
2" 4'-0" 6 SPACES OF 18 34" 3 SPACES OF 3'-11
2"
BRIDGE
MID-SPAN
TOP OF EXISTING SE
WINGWALL ELEVATION 9997.0
APPROXIMATE EXISTING GRADE LINE (TYP)
TOP OF EXISTING NE WINGWALL EL. 9996.50
EL. 9993.5
PROPOSED W18X119 STEEL GIRDER
EL. 9995.0
EXP. FIX.
LOW CHORD
ELEV 9998.07
C BRGLC BRGL
41'-01
4"
GLULAM BRIDGE RAIL AND CURB
PAID FOR UNDER ITEM 55601
PLACED RIPRAP, METHOD A,
CLASS 4, ITEM 25101B (TYP.)
EXISTING WINGWALL (TYP)
SEE VTRANS STANDARD G-1D
APPROACH END DETAIL
SEE VTRANS STANDARD G-1D
APPROACH END DETAIL
SEE FIGURE 3&4
SEE FIGURE 3&4
GENERAL PLAN
RIPRAP CLASS 2
LEGEND:
AGGREGATE SURFACE COURSE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 0/2
4 1 0:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 6 G
EN
P
LA
N
EL
EV
AT
IO
N.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
GENERAL PLAN AND
ELEVATIONS
C-07
00 5' 10' 20'5'
SCALE IN FEET
ELEVATIONS (EASTERN RAIL)
00 5' 10' 20'5'
RIPRAP CLASS 4
G1
G2
G3
G4
CL FR278
END BRIDGE
STA. 2+19.14
BEGIN BRIDGE
STA. 1+77.29
BRG
BRG
83.98° 96.87°
7'-115 8"
7'-95 8"
G5
40'-101
8" C-C BRG.
2'-10"
2'-10"
2'-10"
2'-10"
C12x25 INTERMEDIATE
DIAPHRAGM (TYP.)
1/2"x7-1/2" STIFFENER PLATE (TYP.)
ABUTMENT NO. 1 ABUTMENT NO. 2
8'-7" 8'-37 8" 8'-37
8" 8'-37 8"
CL
L
END DIAPHRAGM
(TYP.)
C
41'-01
4" C-C BRG.
SEE TABLE THIS SHEET
4" (TYP.) W18X119
BRG
BRG
INTERMEDIATE
2" X 7-12" STIFFENER (TYP.)
CLCL
BEARING STIFFENER
2" X 7 12" (TYP.)
C-C BRG. 41'-01
4" - 40'-101
8"
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 0/2
4 1 6:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 7 F
RA
MI
NG
.D
W G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
FRAMING PLAN AND
GIRDER ELEVATION
C-08
00 2' 4'2' 8'
SCALE IN FEET
00 2' 4'2' 8'
SCALE IN FEET
NOTE:
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS
PRIOR TO SUBMITTING FABRICATION DRAWINGS.
BRIDGE FRAMING PLAN
GIRDER ELEVATION
SEE DETAIL "A"
ON SHEET C-09
SEE DETAIL "B"
ON SHEET C-09
C12X25 DIAPHRAGM
SCALE: 12" = 1'-0"SCALE: 12" = 1'-0"
SCALE: 12" = 1'-0"
TOP OF STEEL EL @ BRG CL (ft)
ABUT. 1 ABUT. 2
G1 10000.08 9999.74
G2 10000.08 9999.74
G3 10000.08 9999.74
G4 10000.08 9999.73
G5 10000.07 9999.73
TOP OF STEEL
DIAPHRAGM CONNECTION DETAIL
SCALE: NOT TO SCALE
DIAPHRAGM DETAIL
SCALE: NOT TO SCALE
1/2"x7-1/2" CONNECTION PLATE
C12x25
LEVEL
W18X119
STEEL STRINGER
DIAPHRAGMCL
-7
/8
8- 7/
8- 7/
FOR
CONNECTION
SEE DIAPHRAGM
CONNECTION
DETAIL
BOTH SIDES OF WEB, (TYP.)
C12x25
1/2" CONNECTION PLATE
3" 1-3/4"1-1/2"
STRINGER WEB
3"
EQ
U
AL
S
PA
C
ES
NOTES:
1. 1-1/16" DIAMETER HOLE IN CONNECTION PLATE; 15/16"
DIAMETER HOLE IN CONNECTING MEMBER FOR 7/8"
DIAMETER ASTM A325 BOLTS STD. SIZE HOLES ARE
PERMITTED
2. USE 7/8" DIAMETER ASTM A325 BOLTS HAVING AN
UNTHREADED SHANK OF SUFFICIENT LENGTH TO
NOT ALLOW ANY THREADS TO EXIST IN THE PLANE
BETWEEN THE TWO CONNECTED PARTS (SHEAR
PLANE)
3"
4"
4"TYP.
0'-15 8"
0'-05 8"
CL
STRINGER
C BRG.L
83.98°
0'-4"
MIN.
0'-13 8"
0'-05 8"
CL
STRINGER
C BRG.L
96.87°
0'-4"
MIN.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 0/2
4 1 6:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 7 F
RA
MI
NG
.D
W G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
DIAPHRAGM AND
CLIPPING DETAILS
C-09
SCALE: 2" = 1'
A - TYP. CLIPPING DETAIL @ ABUT. 1
SCALE: 2" = 1'
B - TYP. CLIPPING DETAIL @ ABUT. 2
FIELD VERIFY
FIELD VERIFY
F.F. 6X6
TIMBER BACK WALL
TRANSVERSE GLULAM DECK
W18X119
3/8-IN. THICK
STEEL DECK CLIP
DECK TO GIRDER CONNECTION DETAIL
NOT TO SCALE
COUNTER-SINK
BOLTS
3/4" DOME
HEAD BOLTS
2x10 TIMBER WEARING SURFACE
5-IN. THICK
DECK
CLIP DETAIL
NOT TO SCALE
1-1/2"
4"
SLOT FOR 3/4-IN.
DIAMETER BOLT
3/8" 1/2"
1-1/2"
3"
1-IN. THICK
FLANGE
1/2"
8'-0" INTERIOR PANEL (TYP)
0'-11
2" (TYP)
0'-6"
(TYP)
0'-6"
(TYP)
0'-6"
(TYP)
1'-0"
(TYP)
0'-111 4"
FLANGE
WIDTH
(W18X119)
15/16" DIAMETER
BOLT HOLES (TYP.)
IN DECK PANEL
7 SPACES @ 1' (TYP)
3'-0" END PANEL (TYP)
VARIES
1'-4"
(TYP TO END OF DECK)
CL
STRINGER
CL
STRINGER
DECK TO GIRDER CONNECTION PLAN
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/3 1/2
4 1 0:
O
DA
LM
ER
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 6 D
EC
K
DE
TA
IL
S.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
DECK PLAN AND
DETAILS
C-10
00 1' 2'1' 4'
SCALE IN FEET
NOTE:
SYMMETRIC ABOUT CENTERLINE OF BRIDGE.
CONTRACTOR TO FIELD VERIFY END PANEL DIMENSION.
SHOP BEVELED
SOLE PLATE
SOLE PLATE
BOTTOM FLANGE
STEEL REINFORCED
ELASTOMERIC BEARING
BRIDGE SEAT
1.20"
"A"
(SEE NOTE 10)
TYPICAL EXPANSION BEARING ELEVATION
NOT TO SCALE
C BEARINGL
BRIDGE SEAT
SOLE PLATE
BOTTOM FLANGE
3/8"x4"x4" PLATE
STEEL REINFORCED
ELASTOMERIC BEARING
C BEARINGL
SOLE PLATE
"A"
(SEE
NOTE 10)
TYPICAL FIXED BEARING ELEVATION
NOT TO SCALE
TYPICAL EXPANSION BEARING SECTION
NOT TO SCALE
TYPICAL FIXED BEARING SECTION
NOT TO SCALE
STEEL REINFORCED
ELASTOMERIC BEARING
SOLE PLATE
5/16" 5/16"
SOLE PLATE
STEEL REINFORCED
ELASTOMERIC BEARING
1" Ø HDG
ANCHOR BOLT (TYP.)
5/16" 5/16"
FRONT FACE 6" X 6"
TIMBER BACKWALL
FRONT FACE 6" X 6"
TIMBER BACKWALL
1-1/2" (TYP)
BRG. STIFFENER
BRG. STIFFENER
1-1/2" (TYP)
2" MIN.
2" MIN.
2" MIN
2" MIN
GALVANIZED HEX NUT
3/8" THICK WASHER PLATE,
GALVANIZED
SOLE PLATE
ELASTOMERIC
BEARING
CONCRETE BEARING
SURFACE
1'-3"
ANCHOR BOLT DETAIL
NOT TO SCALE
DRILL AND GROUT
IN ACCORDANCE
WITH FP-14
SECTION 564.08
CL
1" Ø ANCHOR BOLT (HDG)
TYPICAL EXPANSION BEARING PLAN
SOLE PLATE
FRONT FACE
OF ABUT.1FRONT FACE
OF 6" X 6"
BACKWALL
1'-7" SOLE PL.
0'-111 4"
FLANGE
C GIRDERL C GIRDERL
C
BEAR
IN
G
L
0'-111 4"
FLANGE
1'-7"
SOLE PL.
0'-105 8"
TYPICAL FIXED BEARING PLAN
ELASTOMERIC BEARING PAD
SOLE PLATE
FRONT FACE
OF ABUT. NO. 2
BEARING STIFFENERS
BEARING STIFFENER
0'-11"
83.98°
V.I.F.
96.87°
V.I.F. - VERIFY IN FIELD V.I.F.
0'-1 5 8" MIN. 0'-13
8" MIN.
FRONT FACE OF
ABUTMENT 2
FRONT FACE
OF 6" X 6"
BACK WALLL
BEARING NOTES:
1. BEARINGS WILL BE PAID FOR UNDER ITEM 56401, "BEARING DEVICE ELASTOMERIC", AND SHALL CONFORM TO APPLICABLE
SUBSECTIONS OF SECTION 564.
2. FABRICATION DRAWINGS, INCLUDING ASSOCIATED WELDING PROCEDURES, SHALL BE SUBMITTED CONFORMING TO SUBSECTION 564.
3. DESIGN CRITERIA :
A. DEAD LOAD UNFACTORED: 38.1 KIPS
B. LIVE LOAD UNFACTORED: 71.9 KIPS
C. DEAD LOAD ROTATION: .007 RADIANS
D. ALL STEEL IN BEARINGS DEVICES SHALL BE AASHTO M 270M/M 270 GRADE 36, UNLESS OTHERWISE NOTED.
4. ALL INTERNAL STEEL SHIMS, IN THE ELASTOMERIC BEARINGS SHALL BE SAND BLASTED AND FREE OF COATINGS, RUST AND MILL
SCALE. THE SHEETS SHALL BE FREE OF SHARP EDGES AND BURRS.
5. STEEL REINFORCED ELASTOMERIC BEARINGS SHALL HAVE MINIMUM 1/8" EDGE SEAL OF ELASTOMER INTEGRAL WITH BEARING
OVER ALL INTERNAL SHEETS.
6. CONTRACTOR TO PROVIDE LEVEL CONCRETE BRIDGE SEATS AT BEARINGS. GROUT LEVELING PADS SHALL BE PERMITTED. SEE
SHEET C-12.
7. ANCHOR BOLTS SHALL HAVE A MINIMUM 15 INCHES EMBEDMENT INTO THE CONCRETE AND SHALL CONFORM TO SUBSECTION
717.01. ANCHOR BOLTS SHALL BE GRADE 36.
8. THE ELASTOMERIC MATERIAL SHALL CONFORM TO SECTION 717 WITH THE FOLLOWING EXCEPTIONS:
HARDNESS = 60 (SHORE A)
SHEAR MODULUS = 165 PSI
9. ALL BEARINGS SHALL BE MARKED PRIOR TO SHIPPING. MARKS SHALL INCLUDE THE BEARING LOCATION ON THE BRIDGE AND A DIRECTION ARROW THAT POINTS UP-STATION. ALL MARKS SHALL BE PERMANENT AND VISIBLE AFTER THE BEARING IS INSTALLED.
10. VULCANIZED SOLE PLATE THICKNESS SHALL BE AS PER THE SOLE PL. DETAIL, ON SHEET C-12. CONTRACTOR SHALL FIELD VERIFY
ABUTMENT SEAT ELEVATIONS AS PART OF BEARING SUBMITTAL.
11. ELASTOMERIC BEARING SHALL BE FACTORY VULCANIZED TO THE SOLE PLATES.
12. SOLE PLATES SHALL BE PAINTED WITH A SHOP APPLIED PAINT SYSTEM IN ACCORDANCE WITH SECTION 563 OF THE SPECIFICATIONS. ANY AREAS OF DAMAGE DURING THE SHIPPING OR PLACEMENT OF THE STEEL SHALL BE REPAIRED IN ACCORDANCE WITH THIS SECTION. THE COLOR SHALL CONFORM TO FEDERAL STANDARD NO. 595, COLOR CHIP NUMBER 20059
AND SHALL BE APPROVED BY THE C.O.R
NOTES:
1. WELDS SHALL TERMINATE 1/4" FROM EDGE OF PLATE.
2. ALL COSTS ASSOCIATED WITH THE FABRICATION, TRANSPORTATION AND INSTALLATION
OF THE SOLE PLATES, INCLUDING ALL HARDWARE AND TOOLS NECESSARY SHALL BE
INCIDENTAL TO ITEM 55502, STRUCTURAL STEEL, ROLLED BEAM.
3. ALL COSTS ASSOCIATED WITH THE INSTALLATION OF THE ANCHOR BOLTS, INCLUDING
HARDWARE, SHALL BE INCIDENTAL TO ITEM 56401.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 2/2
4 1 4:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 6 B
EA
RI
NG
D
EV
IC
ES
.D
W G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
BEARING DEVICES
C-11
00 0.5' 1'0.5' 2'
SCALE : 2" = 1'
00 0.5' 1'0.5' 2'
SCALE : 2" = 1'
C BEARINGL
*2 - 0.25" EXTERIOR LAYERS OF ELASTOMER
3 - 0.507" INTERIOR LATER OF ELASTOMER
4 - 0.1196" STEEL REINFORCING PLATES
1/4" COVER
(ALL SIDES)
1.20"
BEARING ELEVATION
NOT TO SCALE
C BRGL
FRONT FACE
OF BACKWALL
FRONT FACE 6" x 6"
OF BACKWALL
34" PLATE
THICKNESS
34" PLATE THICKNESS
0'-2"
0'-312"
0'-2"
0'-2"
0'-312"
0'-2"
0'-6 38" V.I.F.
0'-7"
1'-7"
0'-7"
1'-7"
0'-2"
0'-6 58 " (V.I.F.)
Ø0'-158"
1-5/8" x 3-1/4"
C GIRDERLC GIRDER
0'-1 58 " MIN. 0'-1 38" MIN.
C BRGL
V.I.F. - VERIFY IN FIELD
0'-5"
0'-014"
0'-8" (EXP., ABUT. 1)
0'-8" (FIX. ABUT. 2)
STEEL REIN. PL.
C GIRDERL
GROUT PAD ELEVATION
NOT TO SCALE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 2/2
4 1 4:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 6 B
EA
RI
NG
D
EV
IC
ES
.D
W G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
BEARING DEVICES
C-12
TYPICAL ELASTOMERIC PAD PLAN
SCALE: 3" = 1'
EXP. SOLE PL. PLAN
SCALE: 3" = 1'
FIX. SOLE PL. PLAN
SCALE: 3" = 1'
GROUT PAD / BRIDGE SEAT NOTES:
1. CONTRACTOR SHALL VERIFY EXISTING ABUTMENT BRIDGE SEAT ELEVATIONS AFTER REMOVING EXISTING STRINGERS.
2. PRIOR TO ERECTION OF PROPOSED STRINGERS, BRIDGE SEATS ARE TO BE THOROUGHLY CLEANED.
3. IF BRIDGE SEAT ADJUSTMENT IS REQUIRED TO ATTAIN PROPOSED ROADWAY ELEVATIONS, CONTRACTOR SHALL
REMOVE EXISTING ABUTMENT MATERIAL OR PROVIDE GROUT LEVELING PAD(S). GROUT PAD SHALL BE MINIMUM 1.5
INCHES THICK.
4. GROUT FOR ANY LEVELING PAD SHALL CONFORM TO VTRANS 2024 STANDARD SPECIFICATIONS FOR CONSTUCTION 707.01(E)(1).
5. BEFORE PLACING GROUT, THE CONCRETE ON WHICH IT IS TO BE PLACED SHALL BE THOROUGHLY CLEANED, ROUGHENED, AND WETTED WITH WATER TO ENSURE PROPER BONDING.
6. THE GROUT SHALL BE CURED AS RECOMMENDED BY THE MANUFACTURER OR KEPT CONTINUOUSLY WET WITH WATER
FOR 3 DAYS. THE GROUT PAD MAY BE LOADED WHEN A MINIMUM 4,000 psi COMPRESSIVE STRENGTH IS ATTAINED.
LEVEL
CL GIRDER
2" MIN AT BEARINGCL
4" CHAMPFER (TYP.)
BEARING PAD
LEVELING PAD GROUT
4" RECESS
7. ALL WORK ASSOCIATED WITH ABUTMENT SEAT CLEANING, PREPARATION AND ASSOCIATED GROUT LEVELING PADS SHALL BE
INCIDENTAL TO ITEM NO. 56401
15'-103 4"5'-101
8" 5'-111 2"
ABUTMENT NO. 2 DETAIL
LOOKING UPSTATION
EXIST. EL
9992.05
EXIST. EL
9991.60
EXIST. EL
9996.47
EXIST. EL
9999.03
EXIST. EL
9997.88
EXIST, EL
9991.80
EXIST. EL
9997.81
EXIST. EL
9999.21
EXIST. EL
9996.44
EXISTING GRADE (TYP.)
3'-0''
4'-61 2"
SAWCUT (TYP.)
EXIST. EL
9994.05
SECTION VIEW
CLASS I CONCRETE REPAIR
CLASS II CONCRETE REPAIR
EXISTING CONCRETE
WALL SURFACE
SAWCUT 11
4" DEEP
CONCRETE CLASS A
(4,500 PSI STRENGTH)
WWF (4x4 W1.4xW1.4)
SECURELY ATTACH WITH
#3 L BAR @ 28" O.C. EACH
WAY
1" CLEAR (TYP.)
CLASS II CONCRETE REPAIR DETAIL
EXISTING CONCRETE WALL
SURFACE
SAWCUT 11
4" DEEP
CONCRETE CLASS A (4,500
PSI STRENGTH)
1-1/2" CLEAR
BEHIND REBAR (TYP.)
EXISTING REINFORCING
EXISTING REINFORCING STEEL
NOT EXPOSED
NOT TO SCALE
DRILL & GROUT
6" MIN. INTO EXISTING
CONCRETE
REMOVE ALL LOOSE, SPALLED
CONCRETE 3" (MIN.) DEEP AND
2" (MIN.) BEHIND EXISTING REBAR.
CLASS I CONCRETE REPAIR DETAIL
NOT TO SCALE
REMOVE ALL LOOSE, SPALLED
CONCRETE 21
2" (MIN.) DEEP
NOTE:
1. CONTRACTOR SHALL MINIMIZE DAMAGE TO EXISTING CONCRETE
IF UTILIZING TEMPORARY FORMWORK FOR CONCRETE REPAIR.
DRILL HOLES IF NECESSARY SHALL BE PATCHED WITH GROUT
NOTE:
1. CONTRACTOR SHALL MINIMIZE DAMAGE TO EXISTING CONCRETE IF
UTILIZING TEMPORARY FORMWORK FOR CONCRETE REPAIR. DRILL
HOLES IF NECESSARY SHALL BE PATCHED WITH GROUT
6'-5" 15'-71 2" 6'-21
2"
ABUTMENT NO. 1 DETAIL
LOOKING DOWNSTATION
2'-0"
2'-0''
EXIST. EL
9991.12
EXIST. EL
9994.94
EXIST. EL
9997.02
EXIST. EL
9999.33
EXIST. EL
9998.08
EXIST. EL
9990.14 EXIST. EL
9991.30
EXIST. EL
9996.94
EXIST. EL
9999.23
EXIST. EL
9998.23
EXISTING GRADE (TYP.)
SAWCUT (TYP.)
SEE SHEET C-10 FOR CONCRETE REPAIR DETAILS
SECTION VIEW
CLASS II CONCRETE REPAIR CLASS I CONCRETE REPAIR
CLASS I CONCRETE REPAIR AREA
LEGEND: DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 0/2
4 1 4:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 7 A
BU
TM
EN
T
DE
TA
IL
S.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
ABUTMENT 1 & 2
DETAILS
C-13
00 2' 4'2' 8'
SCALE IN FEET
NOTES:
1. DIMENSIONS OF SPALLS ARE APPROXIMATE
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO
COMMENCEMENT OF WORK
3. ALL COSTS ASSOCIATED WITH THE WWF REQUIRED FOR PATCHING TYPE I SPALLS SHALL BE
INCIDENTAL TO ITEM 55221.
CLASS II CONCRETE REPAIR AREA
00 2' 4'2' 8'
SCALE IN FEET
NOTES:
1. DIMENSIONS OF SPALLS ARE APPROXIMATE
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO
COMMENCEMENT OF WORK
3. ALL COSTS ASSOCIATED WITH THE WWF REQUIRED FOR PATCHING TYPE I SPALLS SHALL BE
INCIDENTAL TO ITEM 55221.
1+25
10000
10000
0 10 20 300-10-20-30
1+50
10000
10010
10000
10010
0 10 20 300-10-20-30
1+75
10000
10010
10000
10010
0 10 20 300-10-20-30
2+00
10000
10010
10000
10010
0 10 20 300-10-20-30
2+25
10000
10010
10000
10010
0 10 20 300-10-20-30
2+50
10000
10010
10000
10010
0 10 20 300-10-20-30
2+75
10000
10010
10000
10010
0 10 20 300-10-20-30
.3
.2
.4
0.
0.
.6
0.
.8
0.
.4
.7
.5
2'-75 8"@2%
3'-21 4" @2%
6'-0" @2%
6'-0" @2%
6'-0" @2%
6'-0" @2%
1'-0"@2%
1:1
2'-0"@2%
1:1
ABUTMENT
6'-0" @2%
6'-0" @2%
2'-0"@2%2'-0"@2%
1:11:1 6'-0" @2%
6'-0" @2%7'-23
4"@2% 8'-01 8"@2%
RIPRAP, CLASS 2
SECTIONS - CENTERLINE EXISTING FOREST ROAD 278
SCALE: 1"=10' HORIZONTAL
1"=10' VERTICAL
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 2/2
4 1 1:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 4 R
OA
D
SE
CT
IO
NS
.D W
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
ROAD CENTERLINE
SECTIONS
C-14
4+50
10000
10000
0 10 20 30 400-10-20-30-40
4+75
10000
10000
0 10 20 30 400-10-20-30-40
5+00
10000
10010
10000
10010
0 10 20 30 400-10-20-30-40
5+25
10000
10000
0 10 20 30 400-10-20-30-40
5+50
10000
10000
0 10 20 30 400-10-20-30-40
.4
.9
.5
0.
.8
.9
EXISTING GRADE (TYP)
RIPRAP, CLASS 4
SECTIONS - CENTERLINE EXISTING CHANNEL
SCALE: 1"=10' HORIZONTAL
1"=10' VERTICAL
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/3 1/2
4 1 0:
O
DA
LM
ER
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0 5 C
HA
NN
EL
S
EC
TI
ON
S.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
CHANNEL CENTERLINE
SECTIONS
C-15
EROSION CONTROL NOTES:
1. PRIOR TO STARTING CONSTRUCTION THE CONTRACTOR SHALL SUBMIT AN EROSION AND SEDIMENT CONTROL PLAN WITH A SCHEDULE OF CONSTRUCTION ACTIVITIES. THE PLAN SHALL BE SITE SPECIFIC AND SHALL BE PAID FOR UNDER ITEM
15701, SOIL EROSION CONTROL.
2. THE CONTRACTOR SHALL MINIMIZE THE AMOUNT OF DISTURBED SOIL EXPOSED TO EROSION FROM STORM WATER AND WIND AT ANY TIME BY USING VEGETATIVE AND STRUCTURAL CONTROLS AND PROPER TIMING AND SEQUENCING OF
CONSTRUCTION ACTIVITIES.
3. ONLY DISTURB, CLEAR, OR GRADE AREAS NECESSARY FOR IMMEDIATE CONSTRUCTION ACTIVITY. FLAG OR OTHERWISE DELINEATE AREAS NOT TO BE DISTURBED. EXCLUDE VEHICLES AND CONSTRUCTION EQUIPMENT FROM THESE AREAS TO
PRESERVE NATURAL VEGETATION.
4. IF PROJECT IS GREATER THAN 5-ACRES, THE AREA OF UNSTABILIZED SOIL SHALL NOT EXCEED 5 ACRES AT ANY TIME
UNLESS PROJECT PERMITS SPECIFICALLY PROVIDE FOR A GREATER AREA OF DISTURBANCE.
5. ALL EROSION AND SEDIMENT CONTROL PRACTICES AND MEASURES TO BE CONSTRUCTED, APPLIED AND MAINTAINED IN ACCORDANCE WITH THESE DRAWINGS, PER THESE NOTES AND DETAILS, AND ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
6. THE CONTRACTOR SHALL USE PROPER EROSION AND SEDIMENT CONTROL MEASURES TO ENSURE NO SEDIMENT IS
TRACKED OFF-SITE (E.G. STABILIZED CONSTRUCTION ENTRANCE).
7. DISTURBED AREAS WITH POTENTIAL TO DISCHARGE SEDIMENT-LADEN WATER INTO SURFACE WATERS OR OFF THE SITE
MUST BE PROTECTED WITH TEMPORARY EROSION CONTROL MEASURES (E.G., SILT FENCE).
8. THE CONTRACTOR SHALL DIVERT OFFSITE STORMWATER RUNOFF FROM HIGHLY ERODIBLE AREAS AND STEEP SLOPES AND CONVEY OFFSITE STORMWATER RUNOFF TO STABLE AREAS. INSTALL PERIMETER SILT FENCE PRIOR TO CLEARING AND GRUBBING AND INSTALL NECESSARY EROSION AND SEDIMENT CONTROL PRACTICES AS WORK TAKES PLACE.
9. AREAS TO BE FILLED SHALL BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS
OR OTHER OBJECTIONABLE MATERIALS.
10. ALL STOCKPILES, BORROW AREAS, AND SPOILS SHALL BE PROTECTED FROM EROSION AND SURROUNDED BY SILT FENCE
AND COVERED WITH A BLANKET OF STRAW MULCH.
11. FROZEN MATERIAL OR SOFT, MUCKY OR HIGHLY COMPRESSIBLE MATERIALS ARE SUSCEPTIBLE TO ACCELERATED SETTLEMENT AND POTENTIAL ACCELERATED EROSION. WORK IN THESE MATERIALS TO BE PERFORMED UNDER THE
DIRECTION OF A PROFESSIONAL ENGINEER.
12. REPAIR OR REPLACEMENT OF EROSION CONTROL MEASURES SHALL BE MADE PROMPTLY AS NEEDED, AND AS DESCRIBED
IN THE INSPECTION, MONITORING AND MAINTENANCE NOTES ON THESE DRAWINGS.
13. THE OUTER FACE OF THE FILL SLOPE SHALL BE ALLOWED TO STAY LOOSE, NOT ROLLED, COMPACTED,OR BLADED SMOOTH.ROUGHEN THE SURFACE OF ALL SLOPES DURING THE CONSTRUCTION OPERATION TO RETAIN WATER, INCREASE
INFILTRATION, AND FACILITATE VEGETATION ESTABLISHMENT.
14. USE SLOPE BREAKS, SUCH AS DIVERSIONS, BENCHES, OR CONTOUR FURROWS AS APPROPRIATE, TO REDUCE THE LENGTH OF CUT-AND-FILL SLOPES TO LIMIT SHEET AND RILL EROSION AND PREVENT GULLY EROSION. ALL BENCHES TO BE
KEPT FREE OF SEDIMENT DURING ALL PHASES OF DEVELOPMENT.
15. AREAS SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 INCHES PRIOR TO PLACEMENT OF TOPSOIL. TOPSOIL TO BE PLACED WITHOUT SIGNIFICANT COMPACTION TO PROVIDE A LOOSE BEDDING FOR PLACEMENT OF SEED.
16. STABILIZE ALL GRADED AREAS WITH VEGETATION, CRUSHED STONE, COMPOST BLANKET, OR OTHER GROUND COVER AS SOON AS GRADING IS COMPLETED OR IF WORK IS INTERRUPTED FOR 21 WORKING DAYS OR MORE. USE MULCH OR OTHER APPROVED METHODS TO STABILIZE AREAS TEMPORARILY WHERE FINAL GRADING MUST BE DELAYED.
17. ALL GRADED AREAS TO BE PERMANENTLY STABILIZED IMMEDIATELY FOLLOWING FINISHED GRADING.
18. SEED MIXTURE FOR THE PURPOSES OF TURF ESTABLISHMENT SHALL BE THE NEW ENGLAND EROSION CONTROL/
RESTORATION MIX (FOR DETENTION BASINS AND MOIST SITES) BY NEW ENGLAND WETLANDS, INC. OR AN APPROVED EQUAL. THE MIX SHALL BE APPLIED PER THE SEEDING FORMULA AND MANUFACTURERS RECOMMENDATIONS. ALL SEEDED AREAS SHALL RECEIVE EROSION CONTROL MATTING IMMEDIATELY FOLLOWING SEEDING. THIS WORK SHALL BE PAID
UNDER ITEM 15701.
19. PERMANENT OR TEMPORARY COVER MUST BE IN PLACE BEFORE THE GROWING SEASON ENDS. WHEN SEEDED AREAS ARE MULCHED, PLANTINGS MAY BE MADE FROM EARLY SPRING TO EARLY OCTOBER. WHEN SEEDED AREAS ARE NOT MULCHED, SEED SHOULD BE PLACED FROM EARLY SPRING TO MAY 20 OR FROM AUGUST 15 TO SEPTEMBER 15. NO DISTURBED AREA SHALL BE LEFT EXPOSED DURING WINTER MONTHS (NOVEMBER THROUGH MARCH).
20. ONCE DISTURBED AREAS HAVE BEEN STABILIZED AND VEGETATION IS ESTABLISHED, ALL TEMPORARY EROSION CONTROL MEASURES SUCH AS SILT FENCE SHALL BE REMOVED. AREAS DISTURBED BY REMOVAL OF THESE MEASURES SHALL BE
IMMEDIATELY SEEDED ACCORDING TO SEEDING SPECIFICATIONS ON THESE DRAWINGS.
21. AN AREA IS CONSIDERED "STABLE" IF ONE OF THE FOLLOWING HAS OCCURRED: A MINIMUM OF 85% VEGETATED GROWTH HAS BEEN ESTABLISHED; A MINIMUM OF 3" OF NON-EROSIVE MATERIAL (SUCH AS STONE RIP RAP OR A CERTIFIED COMPOST BLANKET) HAS BEEN INSTALLED. EROSION CONTROL BLANKETS HAVE BEEN PROPERLY INSTALLED.
22. ALL AREAS OF EXPOSED OR DISTURBED SOIL TO BE TEMPORARILY STABILIZED AS SOON AS PRACTICABLE BUT NO LATER THAN 45 DAYS FROM THE TIME OF INITIAL DISTURBANCE, UNLESS A SHORTER TIME IS SPECIFIED BY LOCAL AUTHORITIES, THE CONSTRUCTION SEQUENCE APPROVED AS PART OF THE ISSUED PERMIT, OR AN INDEPENDENT MONITOR.
23. ALL AREAS OF EXPOSED OR DISTURBED SOIL TO BE PERMANENTLY STABILIZED AS SOON AS PRACTICABLE BUT NO LATER
THAN 3 DAYS FOLLOWING FINAL GRADING.
24. ALL ITEMS SPECIFIED IN THE EROSION CONTROL PLAN BUT NOT INCLUDED AS A SEPARATE PAY ITEM SHALL BE PAID FOR
UNDER ITEM 15701, SOIL EROSION CONTROL.
25. THE CONTRACTOR MAY USE SILT FENCE OR BIODEGRADABLE FIBER ROLLS FOR SOIL EROSION AND SEDIMENTATION CONTROL SILT FENCE MUST BE REMOVED ONCE VEGETATION IS ESTABLISHED. BIODEGRADABLE FIBER ROLLS MAY BE
LEFT IN PLACE. THIS WORK SHALL BE INCLUDED IN PAY ITEM 15701.
26. NO MATERIAL SHALL BE CLEANED OR ALLOWED TO ERODE INTO THE WATER COURSE, NOR SHALL MATERIAL BE PLACED
INTO THE WATER COURSE EXCEPT AS SHOWN ON THE PLANS.
27. ALL WORK SHALL TAKE PLACE IN THE DRY. THE CONTRACTOR SHALL DEWATER ALL WORK AREAS IN ACCORDANCE WITH
THE CONTRACTOR'S APPROVED DEWATERING PLAN, PRIOR TO DISTURBANCE.
28. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONTROL OF WATER MEASURES FROM THE INITIATION OF CONSTRUCTION UNTIL THE CONTROL OF WATER MEASURES ARE REMOVED AT THE CONCLUSION OF THE PROJECT.
29. CONTRACTOR SHALL CONSTRUCT TEMPORARY AND PERMANENT EROSION AND SEDIMENTATION CONTROL FACILITIES IN ACCORDANCE WITH THE CONTRACTOR'S APPROVED SEDIMENT CONTROL PLAN PRIOR TO THE COMMENCEMENT OF
EARTHWORK OPERATIONS.
30. THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN EROSION AND SEDIMENTATION CONTROL DEVICES THROUGHOUT THE PROJECT SITE FOR THE DURATION OF THE CONSTRUCTION. THE CONTRACTOR SHALL INSPECT AND RECORD FINDINGS OF ALL EROSION AND SEDIMENTATION CONTROL DEVICES IN ACCORDANCE WITH THE CONTRACTOR'S SEDIMENT CONTROL PLAN TO ENSURE THAT ALL ITEMS ARE IN STABLE CONDITION. IN THE EVENT THAT SAID ITEMS ARE DETERMINED TO BE IN UNSATISFACTORY CONDITION, THE CONTRACTOR SHALL RECORD THE UNSATISFACTORY ISSUE, AND IMPLEMENT A CORRECTIVE MEASURE IN ACCORDANCE WITH THE CONTRACTOR'S APPROVED SEDIMENT CONTROL
PLAN.
NOTES:
1. VTRANS ROLLED EROSION CONTROL PRODUCT (RECP) SIDE SLOPE AND SILT FENCE DETAILS ARE ADDED ONLY FOR REFERENCE OF ACCEPTED PRODUCTS AND PROCEDURES. NO PAYMENT SHALL BE MADE TO THE VTRANS ITEMS REFERENCED ABOVE. ALL PAYMENT SHALL BE MADE UNDER ITEM 15701 SOIL EROSION CONTROL OR ITEM 15705 SOIL EROSION CONTROL, SILT FENCE.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 0/2
4 1 0:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_X X
EP
SC
N
OT
ES
A
ND
E
XI
ST
IN
G.
DW
G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
EROSION PREVENTION
AND SEDIMENT
CONTROL DETAILS
C-16
OM3-R WITH POST
FACING AGAINST THE
DIRECTION OF TRAVEL
OM3-L WITH POST
FACING AGAINST THE
DIRECTION OF TRAVEL
OM3-L WITH POST OM3-R WITH POST
LANE OF
TRAVEL
OM3-L WITH POST OM3-R WITH POST
LANE OF
TRAVEL
(SEE VTRANS
STANDARD G-1D
DETAIL SHEET)
(SEE VTRANS
STANDARD G-1D
DETAIL SHEET)
FOR CONSTRUCTION
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 0/2
4 1 0:
B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_1 7 R
AI
L
SH
EE
TS
.D
W G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
TERMINAL UNIT
DELINEATION
C-17
FLO
W
1+
1+
2+
2+
2+
4+33
4+50
5+00
5+50
5+73
BOLLES BROOK
℄ FOREST SERVICE ROAD #278
EXISTING WINGWALL (TYP.)
BEGIN BRIDGE
STA. 1+77.29
END BRIDGE STA. 2+19.14
FR 278 STA. 2+00
BOLLES BROOK STA. 5+00
HVCT PT 1
3/8" REBAR
N: 9987.45 E: 100050.61
EL: 9995.50
9995.50
CONTROL HORIZONTAL AND VERTICAL
HVCT PT 3
3/8" REBAR
N: 10069.00 E: 99987.99
EL: 9999.08
9999.08
CONTROL HORIZONTAL AND VERTICAL
BM # 2240
N: 9962.31
E: 100047.36
EL: 9997.17
BENCH MARK - SPIKE IN 20" BIRCH BELL
BM # 2238
N: 10005.20 E: 99969.28
EL: 9995.82
BENCH MARK - SPIKE IN 24" ASH BELL
HVCT PT 2
NAIL ON DECK OF BRIDGE
N: 10000.02 E: 100000.20
EL: 10000.02
10000.02
CONTROL HORIZONTAL AND VERTICAL
WP1
N: 9958.97
E: 100005.88
WP2
N: 9967.03 E: 100008.32
WP3
N: 9973.42 E: 100022.93
WP4
N: 9971.38
E: 100030.78
WP5
N: 10005.34
E: 99989.51WP6
N: 10002.91 E: 99996.74
WP7
N: 10009.59 E: 100011.30
WP8
N: 10016.72 E: 100014.14
POINT TABLE
POINT NUMBER DESCRIPTION NORTHING EASTING ELEVATION
HVCT PT 1 CONTROL HORIZONTAL AND VERTICAL 9987.45 100050.61 9995.50
HVCT PT 2 CONTROL HORIZONTAL AND VERTICAL 10000.02 100000.20 10000.02
HVCT PT 3 CONTROL HORIZONTAL AND VERTICAL 10069.00 99987.99 9999.08
BM# 2238 BENCHMARK-SPIKE IN 24" ASH 10005.20 99969.28 9995.82
BM# 2240 BENCHMARK-SPIKE IN 20" BIRCH 9962.31 100047.36 9997.17
WP1 WORKING POINT 1 9958.97 100005.88 9996.98
WP2 WORKING POINT 2 9967.03 100008.32 9990.14
WP3 WORKING POINT 3 9973.42 100022.93 9991.12
WP4 WORKING POINT 4 9971.38 100030.78 9997.03
WP5 WORKING POINT 5 10005.34 99989.51 9996.54
WP6 WORKING POINT 6 10002.91 99996.74 9991.60
WP7 WORKING POINT 7 10009.59 100011.30 9991.80
WP8 WORKING POINT 8 10016.72 100014.14 9996.54
S61°19'14"E 18.89'
S89°34'41"W 20.24'
TIE LINE
S37°31'14"E 102.82'
TIE LINE
TIE LINE
N60°34'29"E 39.07'
N14°09'14"W 62.93'
23.37°
TIE LINE
TIE LINE
81.90°
SURVEY TIE PLAN
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/1 /24
:0
9 B
GR
AV
ES
I:
\6\
G
MN
F
FR
8 B
RI
DG
E
SU
PE
RS
TR
UC
TU
RE
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\C
AD
\62
_0
6 T
IE
S
HE
ET
.D
W G;
(R09)
EASTERN REGION
FR 278-0.24
BRIDGE
SUPERSTRUCTURE
REPLACEMENT
GREEN MOUNTAIN
NATIONAL FOREST
MANCHESTER RANGER DISTRICT
7/12/2024
A. HUMMERS
B. GRAVES
D. CONGER
629065
TIE SHEET
C-18
00 10' 20'
10' 40'
FIGURE 3 System No. 1: wood bridge railing design details (1 in. = 25. 4 mm).
TRANSPORTATION RESEARCH RECORD 1696
PAPER NO. 5B0110
"TWO TEST LEVEL 4 BRIDGE RAILING AND TRANSITION SYSTEMS FOR TRANSVERSE
TIMBER DECK BRIDGES", FALLER ET AL. IN PRESS, 2000
FIGURE 4 System No. 1: approach guardrail transition design details (1 in. = 25.4 mm).
TRANSPORTATION RESEARCH RECORD 1696
PAPER NO. 5B0110
"TWO TEST LEVEL 4 BRIDGE RAILING AND TRANSITION SYSTEMS FOR TRANSVERSE
TIMBER DECK BRIDGES", FALLER ET AL. IN PRESS, 2000
TOP OF RAIL
2'-5'' +/- 1''
TOP OF RAIL
2' - 3‡''
STEEL BEAM GUARDRAIL SHALL BE 25'-0'' UNLESS OTHERWISE SPECIFIED.
THE TRANSITION FROM THE APPROACH END TO THE STANDARD
APPROACH RAIL SHALL BE 25'-0'' UNLESS OTHERWISE SPECIFIED.
HEIGHT OF STANDARD STEEL BEAM TO MATCH THE BRIDGE
OF A DIFFERENT HEIGHT THE LENGTH NEEDED TO TRANSITION THE
WHEN STANDARD STEEL BEAM CONNECTS TO BRIDGE APPROACH RAIL
UNLESS OTHERWISE SPECIFIED.
MATCH THE MANUFACTURED TERMINAL SECTION SHALL BE 25'-0''
TO TRANSITION THE HEIGHT OF STANDARD STEEL BEAM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .