12445525R0003_Attachment_1_SOI_FR278_Bridge_Superstructure_Replacement_GMNF_1.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
GAOA Forest Road 278 Bridge Structure Replacemet GMNF Federal contract opportunity
Solicitation number
12445525R0003
Issued by
Department of Agriculture Forest Service

About this file

This document is a Schedule of Items (SOI) for the Forest Road 278 Bridge Superstructure Replacement project in the Green Mountain National Forest, Manchester Ranger District, Bennington County, Vermont. The comprehensive line item listing details 29 discrete construction activities, including mobilization, site preparation, excavation, structural work, and restoration. Key construction elements involve removing the existing bridge superstructure, installing approximately 28,000 pounds of structural steel, constructing bridge railing (96 linear feet), placing riprap, establishing roadway surface, and implementing erosion control measures. The project requires various materials including structural timber (composite glulam, treated, and untreated), aggregate surface course, subbase material, and includes supplementary components like guardrail systems, terminal sections, signage, and temporary traffic control.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FR278-0.24 Supestructure Replacement - Schedule of Items Green Mountain National Forest Manchester Ranger District - Bennington County, VT

CLINITEM NO.DESCRIPTIONPAY UNITEST. QTY.UNIT PRICEAMOUNT
000115101MOBILIZATIONLPSM1
000215201CONSTRUCTION SURVEY AND STAKINGLPSM1
000315701SOIL EROSION CONTROLLPSM1
000420102CLEARING AND GRUBBINGLPSM1
000520301REMOVAL OF SIGN/MARKEREA4
000620304REMOVAL OF BRIDGE SUPERSTRUCTURELPSM1
000720401ROADWAY EXCAVATIONCUYD20
000820410SELECT BORROWCUYD60
000920435BACKFILLCUYD20
001020701SEPARATION-STABILIZATION GEOTEXTILESQYD6
001120801STRUCTURE EXCAVATIONCUYD20
001220820DEWATERINGLPSM1
001325101APLACED RIPRAP, METHOD A, CLASS 2CUYD10
001425101BPLACED RIPRAP, METHOD A, CLASS 4CUYD40
001530105SUBBASE MATERIALCUYD5
001630112AGGREGATE SURFACE COURSECUYD20
001755221REPAIR CONCRETECUYD1
001855502STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTEDLB28000
001955601BRIDGE RAILING, TIMBERLNFT96
002055701ASTRUCTURAL TIMBER AND LUMBER, COMPOSITE GLULAMMFBM3.5
002155701BSTRUCTURAL TIMBER AND LUMBER, TREATEDMFBM0.20
002255701CSTRUCTURAL TIMBER AND LUMBER, UNTREATEDMFBM1.10
002356401BEARING DEVICEEACH10
002461701GUARDRAIL SYSTEM G4, TYPE 2, CLASS B, WOOD POSTSLNFT80
002561702TERMINAL SECTION, TYPE G4-CRT, STEEL POSTSEA4
002662502TURF ESTABLISHMENT, DRY METHODSQYD210
002762901ROLLED EROSION CONTROL PRODUCT, TYPE 1ASQYD210
002863301SIGN SYSTEMEA4
002963501TEMPORARY TRAFFIC CONTROLLPSM1
TOTAL
LPSMLump Sum
SQYDSquare Yard
EAEach
LNFTLinear Feet
MFBMThousand Feet Board Measure
LBPound

File details come from the government source that posted it. Updated .