This is a Schedule of Items (SOI) for the Holcombe Creek Deck Replacement and Superstructure Painting project on the Monongahela National Forest in Webster County, West Virginia. The document outlines 13 line items including mobilization, soil erosion control, road grading (initial and final), brushing and mowing, riprap placement, limestone aggregate for road maintenance, bridge reset, redecking with running planks installation, and bridge painting. The completion date is set for May 16, 2025.
The SOI provides spaces for contractors to input unit prices and total prices for each line item, with specific quantities detailed for materials like 40 tons of Class 1 riprap, 300 tons of AASHTO #1 limestone, 300 tons of crusher run limestone (2.5" or 3"), and 800 tons of 1.5" crusher run limestone. The document includes road work covering 0.6 miles for initial grading and 1.65 miles for final grading. The form concludes with a contractor acceptance statement requiring signature, name, title, and date.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPDATED SCHEDULE OF ITEMS
MOF FR911 HOLCOMBE CREEK DECK REPLACEMENT AND SUPERSTRUCTURE
PAINTING
MONONGAHELA NATIONAL FOREST
WEBSTER COUNTY, WEST VIRGINIA
Completion Date: May 16, 2025
ITEM
NUMBER DESCRIPTION UNIT EST
QTY Unit Price Total Price
0001 Mobilization - Item No.15101-0000 Lump Sum 1 $ $
0002 Soil Erosion and Sediment Control - 15700-0000 Lump Sum 1 $ $
0003 Initial Road Grading - Item No. 20000-0001 Miles 0.6 $ $
0004 Final Road Grading - Item No. 20000-0002 Miles 1.65 $ $
0005 Roadway Brushing and Mowing - Item No. 20104-0001 Miles 0.6 $ $
0006 Bridge Brushing and Mowing - Item No. 20104-0002 Lump Sum 1 $ $
0007 Class 1 Riprap for Bridge Reset (Machine Placed) - Item No.
25100-0000 Tons 40 $ $
0008 AASHTO #1 Limestone for Road Maintenance - Item No. 30000- 0001 Tons 300 $ $
0009 2.5" or 3" Crusher Run Limestone for Road Maintenance - Item No. 30000-0002 Tons 300 $ $
0010 1.5" Crusher Run Limestone for Road Maintenance & Bridge Reset - Item No. 30000-0003 Tons 800 $ $
0011 Bridge Reset - Item No. 55000-0000 Lump Sum 1 $ $
0012 Redecking of Bridge and Installation of Running Planks - Item No. 55706-2000
Lump Sum 1 $ $
0013 Bridge Painting - Item No. 56300-0000 Lump Sum 1 $ $
Total Price $
All quantities are actual quantities.