This document is a Schedule of Items for the Mortier Work Center Building Storm Damage Repairs Project, located in the Grandfather Ranger District of the National Forests in North Carolina, Caldwell County. The project includes multiple comprehensive repair and construction tasks across eight major categories: site re-grading, selective demolition, building repairs and furnishings, overhead garage door repairs, restroom construction, electrical work, and RV parking space construction. Specific tasks include removing and stockpiling driveway gravel, installing culvert pipes, repairing exterior wall sills, installing new windows, insulating walls and ceilings, installing wall paneling, painting, installing garage door openers, constructing a new restroom, updating electrical systems, and constructing an RV parking space with power and sewer hook-ups. The document is structured as a base bid schedule with line items detailing the method of measurement, pay unit, estimated quantity, and space for unit and total pricing, with the document marked as U.S. Forest Service Confidential and dated 9/3/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B0012 Abstract of Offers Mortimer.xlsx | XLSX spreadsheet | |
| MortimerWorkCenterRepairsPlans.pdf | ||
| SF 1442(8_2014).pdf | ||
| MortimerWorkCenterRepairs_Specs.pdf | ||
| MortimerWorkCenterRepairs_SOI.pdf | ||
| DB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAY ITEM
NO.
DESCRIPTION
METHOD
OF
MEASURE
PAY
UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
1 Mobilization and Bonding LSQ LSQ 1 -$
2.1
Remove and Stockpile Driveway Gravel Surfacing and
Excavate Sub-base to the extend and shape shown on the drawings
LSQ LS 1 -$
2.2
Place stockpiled and imported Gravel on Excavated area and shape Swale to the elevations shown on the drawings
LSQ LS 1 -$
2.3
Install 15” D. x 30 ft. 16 ga. Galv. Corrugated Metal
Pipe Culvert Provide a minimum of 12 inches of cover over the entire Length of the pipe
LSQ LS 1 -$
3 Selective Demolition and Disposal per Drawings LSQ LS 1 -$
4.1 Repair Rotted Exterior Wall Sills and Trim per Details
on Drawings
LSQ LS 1 -$
4.2 Patch or extend Interior Walls per Details on
Drawings
LSQ LS 1 -$
4.3 Install new Type A, B and C Windows per Details LSQ LS 1 -$
4.4
Insulate Exterior Walls and Ceilings, approximately
1,650 SF of R-15 and 2,710 SF of
R-21 Fiberglass Batt Insulation
LSQ LS 1 -$
4.5
Install Stucco Texture Ceiling Panels
(Reference Product #25912 or #25913)
Approximately 2,400 SF
LSQ LS 1 -$
4.6
Install Wall Paneling
(Reference Product Smartside 190 Series no-groove
Shiplap and Specified Trim)
Approximately 2,700 SF
LSQ LS 1 -$
4.7 Install Metal Doors and Hardware per Door Schedule LSQ LS 1 -$
4.8 Interior and Exterior Painting Including Pressure
Washing Building Exterior
LSQ LS 1 -$
4.9
Furnish one (1) WorkBench and (2) Metal Storage
Cabinets See Sheet 7 of Drawings for Manufacturer’s
Item Descriptions
LSQ LS 1 -$
BASE BID SCHEDULE
2. SITE RE-GRADING
3. SELECTIVE DEMOLITION AND DISPOSAL
4. BUILDING REPAIRS AND FURNISHINGS
SCHEDULE OF ITEMS
Mortimer Work Center Building Storm Damage Repairs Project
Grandfather Ranger District National Forests in North Carolina
Caldwell County
National Forests in North Carolina
U.S. Forest Service Confidential 9/3/2025 Page 1 of 2
5.1
Install new Openers w/ Push Button Controls on four (4) Garage Doors
(Ref Product LiftMaster, See Specifications)
LSQ LS 1 -$
5.2 Insulate Garage Doors per Detail on Drawings LSQ LS 1 -$
5.3 Replace Bottom Weather Seal On all Doors, See
Detail on Sheet 4 of Drawings
LSQ LS 1 -$
6.1 Wall and Ceiling Framing LSQ LS 1 -$
6.2 Install Water Supply and DWV Rough Plumbing incl.
Concrete floor cutting and patching
LSQ LS 1 -$
6.3 Install all Plumbing Fixtures and Bathroom
Accessories
LSQ LS 1 -$
6.4 Install Porcelain Floor Tile and Bullnose Base, approx. 72 SF
LSQ LS 1 -$
7.1 Install Electrical Load Centers Branch Wiring, Switching and Receptacles
LSQ LS 1 -$
7.2 Install all Interior Light Fixtures, Flood Lights and
Fans
LSQ LS 1 -$
8.1 Place NC DOT ABC Stone Surfacing to the layout
shown on the Drawings
AQ TON 25 -$
8.2 Install 50/30/20 Amp Power Panel per Details on
Drawings
LSQ LS 1 -$
8.3 Install Sewer Hook-Up per Detail on Drawings LSQ LS 1 -$
7. ELECTRICAL
8. RV PARKING SPACE CONSTRUCTION
TOTAL PRICE -- FOR BASE BID PAY ITEMS
5. OVERHEAD GARAGE DOORS REPAIRS
6. RESTROOM CONSTRUCTION
National Forests in North Carolina
U.S. Forest Service Confidential 9/3/2025 Page 2 of 2
File details come from the government source that posted it. Updated .