Attachment.docx
DOCX document 15 KB Posted
- Solicitation number
- 12445223R0023
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a question and response related to amendment 2 of solicitation 12445223R0023 from the Department of Agriculture Forest Service. The solicitation is for renovations to parking areas at the GAOA IITF ECO Park in Puerto Rico, including removing all existing grasspave and 1 inch of sand from all parking lots and the semi-circular drive, disposing of the materials, regrading as needed with final grades matching existing, and replacing with new grasspave across all affected areas. The question clarified the scope seemed unclear between removing material from just the semi-circular drive versus all parking areas, and the response confirmed the intention is to remove and replace grasspave and associated materials across all existing parking lots, including additional parking areas and the semi-circular drive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 2_jh.pdf | ||
| Attachment 1.docx | DOCX document | |
| amendment 1.pdf | ||
| _GP2_Specs_Final.pdf | ||
| _PARKING LOT SITE.pdf | ||
| _GP2_Details.pdf | ||
| _SOW_IITF Eco-Parking 2023.pdf | ||
| Wage Determination.pdf | ||
| 12445223R0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference: RFP 12445223R0023, Amendment 2. Attachment 1.
1. RFI, Question:
1. On the Pre-bid visit they told us that we would remove all the grasspave regrade and install new grasspave from all parking areas, but on your Schedules of Items Item 2B, 2C is specifying the semicircular drive to entrance only.
2. On Item 2E is only to regrade the area labelled Additional Parking towards westward retention pond.
3. On Item 2F it says Hydroseed all areas covered with grass pavers and any area disturbed during construction.
These descriptions can make the bidders misunderstand the whole project.
I think Items should say:
1. Item 2B " Remove and dispose of all existing parking lots, plastic grids (grasspave) and 1'' of sand bed" for a total of 2'' of materials.
2. Item 2C " Replace and Install new grasspave on all parking lots".
RFI 1, Response:
Comments provided by the RFI are generally correct. To clarify, our intention is to:
1. Remove and dispose of all 1" plastic grids (Grass pave) and an additional 1'' of sand bed" for a total of 2'' of materials, on all existing parking lots, including the Additional Parking Lot and the semi-circular drive.
1. Replace and Install new Grass pave on all parking lots including the Additional Parking Lot and the semi-circular drive.
The lot labeled "Additional Parking Lot" currently slopes slightly to the West towards a retention pond. We just wanted to emphasize this to the contractor, The finish grades shall match the existing grades. It's important for this lot to gradually drain towards that existing pond.