Attachment 1.docx
DOCX document 19 KB Posted
- Solicitation number
- 12445223R0023
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains questions and answers regarding solicitation number 12445223R0023 from the Department of Agriculture Forest Service for ecological parking renovations at the IITF facility in Puerto Rico. The responses clarify that a 20% bid bond and performance bonds are required as stated in the RFP. Electronic submission of proposals is acceptable in accordance with the SF-1442. It is confirmed that existing healthy grass areas in detention ponds will not be disturbed, and hydroseeding will only occur in bare or disturbed areas approved by the government. Grass paver blocks will be used instead of gravel pavers as specified. Zoysia seed will be hydroseeded instead of using Zoysia sod. All surface water pipes related to the ecological parking must be cleaned.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 2_jh.pdf | ||
| Attachment.docx | DOCX document | |
| amendment 1.pdf | ||
| _GP2_Specs_Final.pdf | ||
| _PARKING LOT SITE.pdf | ||
| _GP2_Details.pdf | ||
| _SOW_IITF Eco-Parking 2023.pdf | ||
| Wage Determination.pdf | ||
| 12445223R0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference: 124452R0023, GAOA IITF ECO Parking Renovation
RFIs and Responses, Attachment 1:
1. Question: Contractor stated the solicitation calls for a 20% bid bond and a performance bond. He wondered if only one 10% bond would be sufficient.
Answer: As stated in the RFP, a 20% Bid Bond is required (52.228-1: Bid Guarantee, Sept.1996) as well as Payment and Performance Bonds (52.228-15: Performance and Payment Bonds, Construction June 2020).
1. Question: Contractor also noted that the solicitation requires the proposal be submitted electronically and via hard copy. He asked if electronically would be sufficient.
Answer: Please submit proposals electronically in accordance with Block 8 of the SF-1442.
TECHNICAL QUESTIONS.
1. Question: The Scope of Work calls for 2" of sediment to be removed from all detention ponds and then all disturbed earth be hydroseeded. This scope of work was written months ago. The current landscaper improved the grounds, and now a firm bed of grass has established in the NW Deep, SW Deep, SE Shallow detention ponds. We will check with IITF Agronomist and ask if only the pipes need to be cleaned and these ponds left as is. We also will ask if we should delete hydroseeding the other detention pond and swales.
Answer: Any and all swale or ponds that has healthy grass growing on it will not be disturbed. Any and all areas that do not have grass or looks disturbed will be hydroseeded. These will be determined on the ground and approved by the government prior to execution. All surface water pipes related to the ecological parking must be cleaned.
1. Question: Contractor suggested that grass pavers won't do well because the sun is blocked by extensive tree canopies and parked vehicles. The manufacturer suggests using Gravel Pave vice Grass Pave. We will consult with the manufacturer.
Answer: This will remain unchanged. We will replace ecological parking in kind. In other words, we will use grasspave not gravelpave.
1. Question: Zoysia sod is a viable option. It can grow with lots of shade and traffic. However, the final grade would need to match the current grades. Sod comes with a thickness that would necessitate additional excavation. We will also discuss this with the IITF Agronomist.
Answer: All the areas as described above and, in the SOW, will be hydroseeded with Zoysia seed. We will not use Zoysia sod.
Further Clarification: