These are civil engineering site plan and utility drawings for a Forest Sciences Lab & Station Headquarters facility. The drawings include an electrical site plan (E-1), access road details and profile (L-1), and site plan layout with utilities (L-2).
The drawings show details of a main building complex with loading dock, shop area, and multiple building phases planned. The site includes curved access drives, retaining walls, and detailed utility layouts including electrical and telecommunications infrastructure. The topographic contours indicate the facility is situated on sloped terrain requiring careful site grading. Construction details include specifications for an access road with a profile showing elevation changes from approximately 30 to 80 feet, and retaining wall sections with specific dimensions and drainage requirements. The drawings appear to be from a 1979 project numbered 75-007 and were prepared by SAF Associates Incorporated.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .