This document contains Questions and Answers (Q&A) for Amendment #1 of Solicitation 12444625Q0009 for road grading services in the Superior National Forest. The Q&A provides critical clarifications about the contract requirements, including work parameters such as no mile markers or survey/staking needed, no additional material allowed for road surfaces, no ditch cleaning or compaction testing, and specific work hours limited to 7:00 AM to 7:00 PM Monday through Friday.
Key details include traffic control and signage being roadway-specific and determined by the Contracting Officer's Representative (COR), with warning signs to be agreed upon during a pre-work meeting. The Statement of Work indicates 4 grading rounds for the East district and 5 for the West district, with bidders expected to price each road line item for multiple gradings per calendar year. Contractors are instructed to price per mile according to road location and type, with the estimated quantity representing total mileage for each district and road type for the year.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Schedule of Items West Zone SNF Grading R1.pdf | ||
| Statement of Work Superior NF Road Grading R1.pdf | ||
| Schedule of Items East Zone SNF Grading R1.pdf | ||
| Schedule of Items East Zone SNF Grading.pdf | ||
| Wage Determination 2015-4939.pdf | ||
| Wage Determination 2015-4959.pdf | ||
| Map Superior National Forest.pdf | ||
| Map Grading East Zone.pdf | ||
| Statement of Work Superior NF Road Grading.pdf | ||
| Schedule of Items West Zone SNF Grading.pdf | ||
| Map Grading West Zone.pdf | ||
| Solicitation 12444625Q0009 Superior Road Grading.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and answers for Amendment #1 for Solicitation 12444625Q0009
1. Does the site currently have Mile Markers, or is Survey and Staking required?
No. Most roads do not have mile markers. Survey and Staking are not required.
2. Can borrow material be used as required for to satisfied all project needs?
Adding material to the forest roads is not part of the grading contract.
3. Will new material be required for fill?
Adding material to the forest roads is not part of the grading contract.
4. Does solicitation include ditch cleaning and reshaping?
No ditch cleaning or reshaping is required for this contract.
5. Does solicitation include Compaction Testing?
No
6. Does solicitation include traffic control?
The need for traffic control will be roadway specific as determined by the COR.
Warning signage shall be agreed upon by the COR and Contractor during the pre-work meeting.
7. Does solicitation include temporary signs?
The need for warning signage will be roadway specific as determined by the COR.
Warning signage shall be agreed upon by the COR and Contractor during the pre-work meeting.
8. Does solicitation include new signs?
No new signs
9. Is night work allowed?
The typical work period is limited to 7:00A.M. to 7:00P.M. Monday thru Friday. No work will be allowed on weekends or holidays without approval from the COR.
10. For clarification purposes, the SOW shows a chart for (4) rounds of grading for the East and (5) rounds of grading for the West. Does this mean we should price each road line item to be graded multiple times in each calendar year
The work lists have been added to the solicitation to assist with pricing. Please fill out the pricing per mile according to the location and type of road depicted in the Schedule of Items. The estimated quantity is the total mileage for that district and type of road for the year.
11. Could you please provide some historical data on the number of passes typically required for each grading project?
The number of passes required will be based upon equipment size and individual road widths. The requirement will be met if the full width of the road is graded and the existing crown is maintained.