Amendment of Solicitation/Modification of Contract

This document is Amendment 0001 to solicitation 12444527Q0007, issued by USDA Forest Service CSA East 6 in Atlanta, Georgia, for janitorial and cleaning services at Eleven Point Ranger Station, Mark Twain National Forest. The amendment is effective October 26, 2026.

Key Changes: The quotation deadline has been extended from November 9, 2026, at 10:00 a.m. EST to November 13, 2026, at 10:00 a.m. EST. The amendment incorporates a Questions and Answers document providing clarification on facility specifications, cleaning scope, subcontracting arrangements, personnel access requirements, insurance, wage rates, and contract administration procedures. The facility consists of approximately 10,000 square feet across two levels (main floor and basement), with cleaning requirements specified in the Performance Work Statement and Attachment C (Office Map). The solicitation does not mandate floor stripping, waxing, carpet extraction, or exterior window cleaning, but requires standard floor care (sweeping, mopping, vacuuming, scrubbing) and interior glass/mirror cleaning. Subcontracting is permitted with prime contractor accountability. All contractor and subcontractor personnel require compliance with Government facility-access and security requirements before entering the facility or receiving keys/alarm codes. The amendment corrects the payment clause reference from AGAR 452.236-70 to FAR 52.232-33 (Payment by Electronic Funds Transfer—System for Award Management), requiring monthly invoice submission through IPP.gov. Applicable wage determination is Department of Labor Wage Determination No. 2015-5101, Revision 31, specifying a Janitor wage of $15.90 per hour and Health and Welfare fringe benefit of $5.42 per hour. The base period of performance runs from November 15, 2026, to November 14, 2027, with four option years. The extension under FAR 52.217-8 (if exercised post-award) will be calculated by dividing the final performance year pricing by two, with no separate pricing line required from quoters. Individual site visits may be coordinated by contacting Francis Moll at francis.moll@usda.gov; no formal group site visit is scheduled.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12444527Q0007 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309-2449

STE 876S

1720 PEACHTREE ST NW

USDA-FS CSA EAST 6

10/26/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/26/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THIS AMENDMENT INCORPORATES THE FOLLOWING CHANGES TO THE SOLICITATION:

1. THE DATE OFFERS ARE DUE HAS CHANGED FROM NOVEMBER 9, 2026 AT 10:00 A.M. EST TO NOVEMBER

13, 2026 AT 10:00 A.M. EST

2. A QUESTION AND ANSWER DOCUMENT IS HEREBY ATTACHED TO THIS SOLICITATION

3. EVALUATION OF OPTION TO EXTEND SERVICES UNDER FAR 52.217-8 CLARIFICATION:

IF THE NEED ARISES TO EXERCISE THIS EXTENSION POST-AWARD, THE PRICING FOR THE SIX-MONTH

PERIOD WILL BE CALCULATED USING THE AWARDEE'S FINAL PERFORMANCE YEAR PRICING DIVIDED

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NICOLE D. SCOTT

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 10

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12444527Q0007/0001

EXACTLY BY TWO (2). OFFERORS ARE NOT REQUIRED TO

INPUT A SEPARATE PRICE FOR THE FAR 52.217-8

PERIOD IN THEIR PRICE SCHEDULE, AS THIS PRICING

IS MATHEMATICALLY BOUND TO THE FINAL YEAR'S

PROPOSED RATES. EVALUATION OF THIS OPTION DOES

NOT OBLIGATE THE GOVERNMENT TO EXERCISE IT.

4. PERIOD OF PERFORMANCE ADJUSTMENT:

THE PERIOD OF PERFORMANCE DATES STATED IN THIS

SOLICITATION ARE ESTIMATES BASED ON AN

ANTICIPATED AWARD DATE. IN THE EVENT THAT THE

ACTUAL DATE OF AWARD SHIFTS, THE START AND END

DATES FOR THE BASE PERIOD AND ALL SUBSEQUENT

OPTION PERIODS WILL BE ADJUSTED MATHEMATICALLY AT

THE TIME OF CONTRACT AWARD TO MAINTAIN THE

ORIGINAL INTENDED DURATION OF EACH PERFORMANCE

PERIOD. THE TOTAL DURATION OF THE CONTRACT,

INCLUDING ALL OPTION PERIODS, WILL REMAIN

UNCHANGED.

5. AMENDMENT OF CONTRACT CLAUSE:

THE AGRICULTURE ACQUISITION REGULATION (AGAR)

CLAUSE AGAR 452.236-70, "ELECTRONIC SUBMISSION OF

PAYMENT REQUESTS", IS HEREBY DELETED IN ITS

ENTIRETY FROM THIS SOLICITATION AND REPLACED WITH

FEDERAL ACQUISITION REGULATION (FAR) CLAUSE FAR

52.232-33, "PAYMENT BY ELECTRONIC FUNDS

TRANSFER¿SYSTEM FOR AWARD MANAGEMENT." OFFERORS

SHALL COMPLY WITH THE REGISTRATION AND PAYMENT

REQUIREMENTS OUTLINED IN FAR 52.232-33.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

Period of Performance: 11/15/2026 to 11/14/2027

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

USDA Forest Service CSA East 6 1720 Peachtree St NW, Ste 876S Atlanta, GA 30309

Contracting Division

Solicitation Number: 12444527Q0007 Facility: Eleven Point Ranger Station, Mark Twain National Forest Amendment: 0001

The questions and answers below provide clarification of the solicitation. They do not change the solicitation unless expressly incorporated by formal amendment. If any answer conflicts with the solicitation, the formal solicitation amendment controls. Quoters remain responsible for reviewing the complete solicitation, all attachments, and all amendments. Quoters must acknowledge the amendment and submit quotations by the deadline stated in the amendment.

Facility Specifications & Cleaning Scope

Question:

Please confirm the total building area and split between carpeted and hard-surface flooring.

Answer:

The facility consists of a main floor and a basement level, with a combined area of approximately 10,000 square feet. The solicitation does not provide a separate square-footage breakdown for carpeted and hard-surface flooring. Quoters are responsible for determining the labor, equipment, and materials necessary to perform the PWS requirements.

Question: How many restrooms, breakrooms, and specialized areas are within the cleaning scope?

Answer:

The solicitation does not provide a numerical count of restrooms or separately identify every room by cleaning category. The cleaning scope includes the restrooms, breakroom/conference room, kitchen area, computer room, and other areas identified in the PWS and Attachment C, Office Map. Restrooms and applicable cleaning requirements are addressed in PWS §§ 1.14 and 1.1A.20.

Quoters should review the PWS and Attachment C when preparing their quotations.

Question:

Are periodic floor-care tasks, such as stripping/waxing VCT or carpet deep-shampoo extraction, or exterior window cleaning required?

Answer:

The PWS does not specifically require floor stripping, waxing, carpet extraction, or exterior window cleaning. The required floor services include sweeping, dust mopping, damp mopping, wet mopping, vacuuming, and scrubbing as necessary to meet the applicable performance standards. The PWS also requires cleaning of interior glass and mirrors. The expressly identified periodic service is washing and disinfecting trash containers at least twice annually.

Subcontracting and Performance Arrangements

Is subcontracting permitted for the on-site janitorial work under this acquisition?

Answer:

The solicitation does not expressly prohibit subcontracting. Any subcontracting must comply with the solicitation, applicable FAR and AGAR requirements, and the resulting order. The prime contractor remains responsible for all contract performance, including the acts and omissions of subcontractors, compliance with the PWS and QCP, labor requirements, facility-access requirements, and protection of Government property.

Can a subcontractor’s supervisor perform recurring on-site quality-control inspections and sign checklists?

Answer:

Yes. A subcontractor’s supervisor may perform contractor quality-control inspections and sign applicable checklists if authorized by the prime contractor and permitted under the Government’s facility-access requirements. The supervisor must perform those duties in accordance with the contractor’s QCP. The signature documents contractor quality-control activity and does not constitute Government inspection, acceptance, or approval of the services. The prime contractor remains responsible for the subcontractor’s performance.

Personnel Access, Background Checks, and Building Security

What specific background checks, badging, or workforce-integrity credentials are required for after-hours facility access under AGAR 452.204-71?

Answer:

All contractor and authorized subcontractor personnel requiring access must comply with applicable Government identity-verification, access-control, key-control, and facility-security requirements before entering the facility or receiving keys or other access devices. The prime contractor is responsible for ensuring compliance by its personnel and subcontractors.

What is the process and typical lead time for obtaining building keys and alarm codes?

Answer:

After award, the Contracting Officer or COR will coordinate facility access, including any required keys, access devices, or alarm procedures, with the successful contractor. The solicitation does not establish a guaranteed lead time for issuing keys or alarm information. Access devices and alarm information will be provided only to authorized personnel who satisfy applicable Government requirements. The contractor must safeguard all keys and immediately report lost keys in accordance with PWS § 1.6.

Are subcontractor personnel authorized to access the facility under PWS § 1.6?

Answer:

Authorized subcontractor personnel may access the facility when they are performing work under the order, are authorized by the prime contractor, and satisfy all applicable Government facility-access and security requirements. The prime contractor remains responsible for ensuring that subcontractor personnel comply with PWS § 1.6, including restrictions on unauthorized persons, key control, building security, and protection of Government property. Family members, visitors, and other unauthorized persons are not permitted in the facility during performance.

Predecessor Contract

Is Purchase Order 12444522P0040 the direct predecessor contract for this facility?

Answer:

Yes, Purchase Order 12444522P0040 is the direct predecessor contract for this facility.

Insurance and Performance Bonding

What specific insurance types and minimum policy limits are required of the contractor for this order?

Answer:

The contractor remains responsible for obtaining and maintaining insurance required by applicable Federal, State, or local law and the resulting order.

Must insurance evidence be submitted with the quotation or only upon contract award?

Answer:

The solicitation does not require insurance evidence as a quotation submission deliverable. The successful contractor must obtain and maintain any insurance required by the resulting order and applicable law and must provide evidence of coverage if required by this agency.

Quotation Submission Deliverables and Evaluation

Does submission of a completed Experience Questionnaire, Form FS-6300-27, satisfy the Technical Capability narrative requirement?

Answer:

Attachment E is identified as an optional submission. It can be used to document a contractor’s technical capability, provided it gives the information requested as found in the solicitation. Some contractors prefer to use the questionnaire, others prefer to document their technical capability as a separate document. So long as the essential elements as found in the solicitation are given, the information will be accepted.

Is a quotation in the offeror’s custom format acceptable?

Answer:

Yes, provided the quotation is clear, complete, timely, and includes all information required by the solicitation. At a minimum, the quotation must include pricing for the base year and all four option years, the required technical-capability information, and the required past-performance information. A custom format must not omit or alter any solicitation requirement.

Will references for similar work performed by a proposed subcontractor be evaluated under past performance?

Answer:

Quoters may identify relevant subcontractor experience and references. The Government will evaluate the information consistent with the solicitation’s stated evaluation procedures and may consider the relevance and extent of the proposed subcontractor’s role. Submission of subcontractor experience does not relieve the prime contractor of responsibility for successful contract performance.

The Government does not guarantee that subcontractor past performance will receive the same consideration as the prime contractor’s past performance.

Are there any issued amendments or extensions to the submission deadline of November 9, 2026, at 10:00 a.m. Eastern Time?

Answer:

As of the date of this amendment, the question deadline is November 4, 2026, at 4:00 p.m. Eastern Time, and the quotation deadline is extended to November 13, 2026, at 10:00 a.m. Eastern Time, unless changed by a subsequently issued solicitation amendment. Quoters are responsible for reviewing SAM.gov for the complete and current solicitation and all amendments.

Wage Rates and Executive Orders

Which Health and Welfare fringe-benefit rate applies given the inclusion of FAR 52.222-62 concerning Executive Order 13706 paid sick leave?

Answer:

Based on the Wage Determination included in this solicitation and the inclusion of FAR 52.222- 62, the applicable Health and Welfare rate for covered contract performance is $5.42 per hour.

The applicable monetary wage for the Janitor classification is $15.90 per hour.

The contractor must also comply separately with the paid-sick-leave requirements of Executive Order 13706 and FAR 52.222-62, as applicable. The Health and Welfare amount may not be used as a credit toward the contractor’s separate paid-sick-leave obligation.

Is there an applicable predecessor collective-bargaining agreement governing wages for this requirement?

Answer:

The solicitation package does not identify a predecessor collective-bargaining agreement. The solicitation includes Department of Labor Wage Determination No. 2015-5101, Revision 31, including the listed wage and fringe-benefit requirements for the Janitor, Occupation Code 11150 classification. Quoters should base their quotations on the wage determination and other labor requirements included in the solicitation. If the Government determines that a predecessor collective-bargaining agreement applies under the Service Contract Labor Standards, the applicable wage and fringe-benefit requirements will be incorporated or otherwise addressed by formal solicitation amendment or contract action before performance begins.

Question:

Is a single-member LLC owner-operator exempt from the Service Contract Act for the owner’s own labor hours?

Answer:

The individual’s ownership status or business form, by itself, does not determine whether the Service Contract Labor Standards apply. Coverage depends on the individual’s actual status and duties under applicable law, including whether the individual is an employee performing covered service work and whether an exemption applies. A quoter should not assume that an owner-operator is exempt solely because the individual is a member of an LLC.

The contractor is responsible for complying with applicable wage, fringe-benefit, recordkeeping, and classification requirements. Questions requiring a definitive employee-status determination should be referred to the Contracting Officer, agency labor advisor, or the Department of Labor.

For more information related to the Department of Labor, please visit www.dol.gov

Quality-Control Plan

Question:

Must the complete Quality Control Plan accompany the quotation, or is it required post-award?

Answer:

The complete QCP is not required with the quotation. The successful contractor must develop, maintain, and provide the QCP to the Contracting Officer and COR after award in accordance with PWS § 1.10. The QCP must be submitted within the timeframe specified by the Contracting http://www.dol.gov/

Officer and before or at the start of performance, as directed. The contractor remains responsible for meeting all PWS requirements from the commencement of performance.

What is the required response and completion time for complaint-related re-performance under the “immediate” standard?

Answer:

The QASP states that re-performance, if needed, shall be performed immediately. The solicitation does not establish a specific number of hours for responding to or completing re-performance. The contractor must promptly address validated deficiencies and coordinate with the COR regarding the corrective action and completion.

Option Periods and FAR 52.217-8

Should the potential six-month extension under FAR 52.217-8 be priced separately within the quotation?

Answer:

No separate six-month CLIN is included in the Schedule of Items, and quoters should provide pricing only for the base year and the four stated option years.

Solicitation and AGAR Clerical Discrepancies

Page 6 lists AGAR 452.236-70 as “Electronic Submission of Payment Requests,” but the standard AGAR framework may use a different clause number. Which clause is controlling?

Answer:

The reference to AGAR 452.236-70, Electronic Submission of Payment Requests (Sep 2026), is corrected by this amendment. The applicable clause is FAR 52.232-33 (Payment by Electronic Funds Transfer—System for Award Management). The requirement for the contractor to submit payment requests electronically through the Department of the Treasury’s Invoice Processing Platform (IPP) remains unchanged. Invoices shall be submitted monthly in arrears through IPP.gov. Paper invoices and invoices submitted by ordinary email will not be accepted for payment.

This amendment corrects the clause number and title only; it does not change the electronic-invoicing requirement.

Which edition of AGAR 452.203-70 controls this requirement?

Answer:

The solicitation identifies AGAR 452.203-70, Unenforceable Supplier Terms (May 2026). The May 2026 edition controls as incorporated in the solicitation unless changed by formal solicitation amendment. A later AGAR edition does not automatically replace the edition identified in the solicitation. If the Contracting Officer determines that a later edition applies, the Government will identify and incorporate that edition by formal amendment. Quoters should rely on the solicitation and formally issued amendments.

Is an official site visit or pre-quotation walkthrough scheduled?

Answer:

No formal group site visit is scheduled. Individual site visits may be coordinated, subject to facility availability and Government approval. Interested quoters should contact Francis Moll at francis.moll@usda.gov to request a site visit. A site visit is not required unless the solicitation is amended to state otherwise. Site visits do not relieve quoters of responsibility for reviewing the solicitation, PWS, QASP, maps, and other attachments.

mailto:francis.moll@usda.gov

Predecessor Contract
Insurance and Performance Bonding
Question:
Quotation Submission Deliverables and Evaluation
Question:
Answer:
Option Periods and FAR 52.217-8
Solicitation and AGAR Clerical Discrepancies
Question:
Answer:
Question:
Answer:
Question:
Answer:

File details come from the government source that posted it. Updated .