Questions and Answers.docx
DOCX document 20 KB Posted
- Attached to
- Phase 1 ESA GMNF TCF Costal and Park Forestry
- Solicitation number
- 12444323Q0070
About this file
This document contains questions and answers regarding solicitation number 12444323Q0070 for expanded Phase 1 environmental site assessments of seven tracts. The assessments are required to identify all environmental issues and liabilities beyond CERCLA and petroleum, including potential issues under RCRA, SDWA, CAA, CWA, and TSCA such as asbestos, radon, lead paint, and non-hazardous waste sites. The agency also requires mapping all above and underground infrastructure on the properties, as well as creation of an ArcGIS shapefile. The period of performance is from September 18, 2023 to September 17, 2024. Unknown underground infrastructure will be addressed in a future contract option.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| ReadsboroGIS.zip | ZIP file | |
| shapefiles.zip | ZIP file | |
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Attachment 3 - Schedule Time Frame.docx | DOCX document | |
| Attachment 8 - JS_Worksheet2_InterviewQuestions.docx | DOCX document | |
| Attachment 7 - JS_Worksheet1_RecordsSearch_AAI_Blank.docx | DOCX document | |
| Wage Determination 2015-4139 30JUN2023 Middlebury VT.pdf | ||
| Solicitaiton - 124443230070.docx | DOCX document | |
| Attachment 1 - Schedule of Items.docx | DOCX document | |
| Attachment 2 - Statement of Work.docx | DOCX document | |
| Attachment 9 - JS_Worksheet3_SiteRecon.docx | DOCX document | |
| Wage Determination 2015-4353 30JUN2023 Randolph Co WV.pdf | ||
| Attachment 5 - MAP Coastal Site.pdf | ||
| Attachment 4 - MAP Stamford East and Readsboro Parcels.pdf | ||
| Attachment 6 - TCF Inholdings Map.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12444323Q0070 Questions and Answers 21AUG2023
1. Is there a cost estimate , budget or ballpark figure for the project listed?
A. We do not provide a cost or budget estimate for this project.
2. Is there an actual start date for the project?
A. 452.211-74 Period of Performance (FEB 1988) The period of performance of this contract is from 18SEP2023 through 17SEP2024.
3. The subject solicitation is for "expanded" pre-acquisition environmental site assessments of seven tracts in accordance with 40 CFR 312, 33 CFR 137 and ASTM Standard E1527-13, with the objective of identifying the full range of "environmental issues and liabilities" associated with the parcels. In the context of this solicitation, can the Agency clarify what it expects an "expanded" ESA to address that is not stipulated in a Phase 1 ESA per ASTM standards?
A. This is from the scope of work:
“The Agency requires identification of the environmental issues and liabilities with the parcel beyond those associated with Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) liabilities and petroleum products. These environmental issues and liabilities include, but are not limited to, those issues and liabilities under the Resource Conservation and Recovery Act (RCRA), the Safe Drinking Water Act (SDWA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Toxic Substance Control Act (TSCA). These issues and liabilities include, but are not limited to, asbestos containing material, radon, lead-based paint, non-hazardous solid waste disposal areas, wastewater disposal systems, drinking water systems, drinking water and/or other wells. The agency also requires a mapped inventory of all the above ground infrastructure associated with the parcel (including but not limited to buildings, tanks, pipelines, roads, etc…) and known underground infrastructure (identify known locations of pipelines, tanks etc…). Unknown underground infrastructure will be dealt with in a contract option. All locations of structures, lines, wells and all findings shall be mapped, and an Arc GIS shapefile created.”