This is a Schedule of Items (SOI) for forest road maintenance work at Prescott National Forest in Southwestern Region 03 of the U.S. Forest Service, dated May 12, 2026. The contract encompasses two primary projects: NFSR 373 Aggregate Hauling and NFSR 360 Cattle Guard Replacement.
The Base Bid includes seven line items valued for mobilization/demobilization/bonding (Lump Sum), equipment rental with operators for loader (40 hours), end dump truck (360 hours), compactor (200 hours), and water tender (200 hours), plus material and delivery of 1,050 tons of MAG ABC aggregate or approved substitute material meeting FP-24 Surface Coarse requirements. The Optional Bid comprises nine additional line items including grader services (200 hours), supplemental MAG ABC material (up to 1,000 additional tons), hauling and delivery (up to 60 round trips at 12 cubic yards/17 tons per trip), additional operator hours for various equipment (up to 80 hours total), and the NFSR 360 Cattle Guard Replacement work (Lump Sum). All equipment services are priced hourly, materials are priced per ton, and hauling is priced per round trip. Contractors must provide vendor name and Unique Entity Identifier (UEI) with their bids. Quantities for Actual (Contract) Quantity items are fixed as specified; Lump Sum Quantity items represent complete work for the bid amount with approximate estimated quantities provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
SOUTHWESTERN REGION 03
PRESCOTT NATIONAL FOREST
NFSR 373 AGGREGATE HAULING
NFSR 360 CATTLE GUARD REPLACEMENT
SCHEDULE OF ITEMS
U.S. FOREST SERVICE
05/12/2026
2 | P a g e
1.0 SCHEDULE OF ITEMS
The following descriptions summarize the work for the Schedule of Items (SOI) listed below.
They are not intended to be all-inclusive of the work needed to perform each item. Such work shall be considered incidental to the task and included in the final costs to perform the work.
1.1 ABBREVIATIONS
Pay Units LS Lump Sum HR Hour TN Ton TR Roundtrip
1.2 METHOD OF MEASURE DEFINITIONS
Actual (Contract) Quantity, AQ The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity. If there is evidence that a quantity specified as a contract quantity is incorrect, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.
Lump Sum Quantity, LSQ The bid amount is complete payment for all work described in the contract and necessary to complete the work for that pay item. The quantity is designated as "All". Estimated quantities of lump sum work shown in the contract are approximate.
3 | P a g e
1.3 SCHEDULE OF ITEMS
BASE BID LINE ITEMS
Pay Item
Number Pay Item Description
Method of
Measure Quantity Pay
Unit Unit Price Total Cost
001 Mobilization, Demobilization, Bonding LSQ 1 LS $ $ 002 Loader, w/ Operator AQ 40 HR $ $ 003 End Dump, w/ Operator AQ 360 HR $ $ 004 Compactor, w/ Operator AQ 200 HR $ $ 005 Water Tender w/ Operator, including water AQ 200 HR $ $
006 MAG ABC (1) AQ 1050 TN $ $
007 MAG ABC Hauling & Delivery LSQ 1 LS $ $
BASE BID LINE-ITEM TOTAL $
(1) Or substitute material that would better serve as FP-24 Surface Coarse requirements. If substitute material is priced and proposed, describe the substitute material below:
OPTION BID LINE ITEMS
Pay Item
Number Pay Item Description
Method of
Measure Quantity Pay
Unit Unit Price Total Cost
008 Grader, w/ Operator, all grading activities AQ 200 HR $ N/A
009 MAG ABC AQ 1 TN $ N/A
010 MAG ABC Hauling & Delivery, per 12CY / 17TN AQ 1 TR $ N/A 011 Water Tender w/ Operator, Additional Hours AQ 1 HR $ N/A 012 Loader, w/ Operator, Additional Hours AQ 1 HR $ N/A 013 End Dump, w/ Operator, Additional Hours AQ 1 HR $ N/A 014 Compactor, w/ Operator, Additional Hours AQ 1 HR $ N/A 015 Grader, w/ Operator, Additional Hours AQ 1 HR $ N/A 016 NFSR 360 Cattle Guard Replacement LSQ 1 LS $ $
OPTION BID LINE-ITEM TOTAL $
Option Line Item 009 may be awarded up to 1000 additional TONS.
Option Line Item 010 may be awarded up to sixty (60) round trips.
Option Line Items 011, 012, 013, 014, and 015 may be awarded for an additional eighty (80) hours.
Vendor Name
Vendor UEI
| 1.0 SCHEDULE OF ITEMS |
| 1.1 ABBREVIATIONS |
| 1.2 METHOD OF MEASURE DEFINITIONS |
| 1.3 SCHEDULE OF ITEMS |
File details come from the government source that posted it. Updated .