Questions Responses_.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Ocoee-Hiwassee Ranger District Mowing Services Federal contract opportunity
- Solicitation number
- 12444022Q0010
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1. Statement of Work.pdf | ||
| Attachment 2. Map.pdf | ||
| COMBINED SYNOPSIS_SOLICIATION_12444022Q0010.pdf | ||
| Attachment 3. Wage Determinations Rates.pdf | ||
| Attachment 4. Experience Questionaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Item | Question | USDA FS Response | Discussion |
| 1 | How flexible is our time schedule? | The FS would like to work around the peak season use and would prefer October - December, however, we will look into the possibility of extending Period of Performance till March, 2020. | 1. The FS will work with Public Affairs to inform hikers of the construction period. The FS plans to close the area from the top of the falls to the bottom during construction for visitor and contractors safety. Trail will be closed at the top of the falls with barricades and signs. Both trailheads will be signed to inform hikers of closure. |
2. This is a high use trail, expect 200-400 hikers on nice days and weekends.
3. Rock is available on site for step and retaining wall construction.
4. Equipment can remain on site during construction.
5. Panther Creek is a class 3 trail and will need to be constructed to meet those standards.
6. The FS will authorize which materials can be used during construction, with an emphasis to spread out visual impacts and protect stream bank.
7. Any overnight use must follow leave no trace principles to minimize resource damage.
8. The FS may approve borrow pits for fill.
9. The intent of this project is to make the trail safe and sustainable. There is some uncertainty with slopes, bed rock and materials. All of these concerns will be worked through with coordination with the COR and CO.
10. All work must be conducted in the trail prism.
11. A technical question about area 0+60 – 0+80 on the trail log. It had to with reducing the size of the wall needed if contractors are able to break away more of the bedrock within that area. The FS would handle situations when they arise and the offerors will be submitting their quotations based on the Statement of Work, and the terms and conditions of solicitation. The main goal of this project is to build a safe sustainable trail.
| 2 | Can we access the site with machinery? | The FS does not think it is possible to access the project area with machinery without occurring resource damage. Machinery is not recommended. |
| 3 | Are there restrictions on the type of explosives to use? | See FSM 7100-Engineering Operations Chapter 7190-Explosives and Blasting Materials |
| 4 | What is the Davis Bacon Wages? | Please see attachment. |
| 5 | Can we use youth corps crews to help with construction? | No, only the Secretary of Agriculture shall determine the areas under their administrative jurisdictions which are appropriate for carrying out the programs using employees of the Corps in accordance with 16 USC Ch.37, 1703. |
| 6 | Can we extend the solicitation close date by 10 days? | See amendment 00001. |
| 7 | Do we need bid bonds and performance bonds? | Yes, pursuant to 40 U.S.C. 3132, for construction contracts greater than $35,000, but not greater than $150,000, the contracting officer shall select the payment protections in accordance with FAR Part 28.102. 1)Payment bond, 2) An irrevocable letter of credit (ILC),3)A tripartite escrow agreement, 4)Certificate of deposit, 5)A deposit of the types of security listed in FAR Part 28.204-1 and 28.204-2. |
Sheet1
| Item | Question | USDA FS Response | |
| 1 | , How do we access the bid documents for this project? | All documents are uploaded in SAM. | |
| 2 | 1. | Item 1 & 2: | |
| a. | Refer to the schedule items/bid list; is the acreage mowing ONCE per year? | ||
| b. | What time should the mowing be done? | a. depends on our budget. b. No, it doesn't do as good a job. Specifications for linear openings call for the cut bank to be mowed. | |
| 3 | 1. Is a skid steer with a bush hog attachment acceptable? | Usually done with a side arm or bat-wing type attachment. | |
| 1. Item 3: where should these trees be removed to? (or just cut and removed form the feed plot) | Cut and pushed to the edge and or below the road. | ||
| 3 | 1. I am located in Sneedville TN. It appears to be less 100 mi radius. Is that acceptable? | No, by my calculation it is over 150 miles to Benton, TN and about 1/3 my work is close to 170 miles away. |