Performance Work Statement Summary: Hazard Tree Removal – Fullerton Lake Recreation Area
This Performance Work Statement (PWS) issued June 15, 2026, specifies requirements for hazard tree removal and disposal services at the Fullerton Lake Recreation Area on the Kisatchie National Forest, Calcasieu Ranger District near Pitkin, Louisiana. The contractor must supply all labor, equipment, supervision, transportation, tools, cranes, vehicles, and safety measures to identify, fell, remove, and dispose of designated hazard trees within approximately 75 acres (contract boundary area is 74.56 acres). Work includes felling and removal of downed dead trees 6 inches or larger in diameter, standing dead trees 6 inches or larger, structurally compromised live trees, and marked sweet gum trees; limbing, bucking, and site cleanup; hauling woody debris to a designated gravel pit approximately 10.3 miles away; stump grinding within the campground footprint to flush grade (not exceeding 2 inches above ground); and mastication within a designated 22.34-acre area with piles not exceeding 3 inches high. All work must comply with ANSI Z133 safety standards, OSHA regulations, and Forest Service Manual requirements. The project spans approximately 75 acres of developed recreation footprint including campgrounds, parking areas, road corridors, trails, and day-use areas.
The contractor must provide a Louisiana Agriculture and Forestry licensed arborist on-site during all tree work operations, with backup arborist availability. Work hours are 0630 to 1730 Monday through Friday, unless approved by the Contracting Officer's Representative (COR). Site conditions include no potable water, toilet facilities, or electrical power available. The contractor is responsible for worker safety equipment, first aid/CPR certification for sawyers, daily Job Hazard Analyses, company safety plan submission, fire prevention measures, and hazardous material spill containment. Special requirements include protecting asphalt pavement and recreation infrastructure from equipment damage, limiting damage to non-target trees, preventing cultural resource disturbance, and maintaining environmental protections. Payment is a single lump sum covering all costs for labor, equipment, supervision, felling, limbing, processing, hauling, disposal, stump grinding, mastication, site cleanup, and incidentals. Work must be completed within 60 calendar days from Notice to Proceed. Required contractor documents before work commencement include Certificate of Insurance, Safety Plan, SF 1413s for all subcontractors, First Aid and CPR certifications for all sawyers, and Certified Arborist licensure documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05_12443926Q0170-0003.pdf | ||
| C05f_Questions 20260828.pdf | ||
| C05_12443926Q0170-0002.pdf | ||
| C05_12443926Q0170-0001.pdf | ||
| C05e_PWS_Revised 20260805.pdf | ||
| C05f_Questions 20260810.pdf | ||
| C05c_Questions 20260730.pdf | ||
| C04_12443926Q0170.pdf | ||
| C04a_PWS.pdf | ||
| C04b_Maps.pdf | ||
| C04c_WD 1980-0614 R75.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Service Contract – Hazard Tree Removal
Fullerton Lake Recreation Area Calcasieu Ranger District, Vernon Unit
Kisatchie National Forest June 15, 2026
1. General Requirements
The Contractor shall supply all material, labor, tools, equipment, cranes, vehicles, supplies, incidentals, supervision, and safety measures necessary to complete the project in accordance with this Performance Work Statement (PWS).
All work shall be performed in accordance with applicable Occupational Safety and Health Administration (OSHA) standards and the requirements outlined in this document.
The Forest Service may supply, upon request:
Specialized measurement tools (e.g., survey-grade GPS, total stations, auto-levels) for field verification
A tablet and/or laptop for contractor reporting purposes
The Forest Service shall provide all necessary administrative documents required for contract execution and compliance, including but not limited to:
Contract Daily Diaries Notices of Non-Compliance Other required contract documentation
2. Scope of Work
The Contractor shall furnish all labor, equipment, supervision, transportation, and incidentals necessary to identify, fell, remove, and dispose of designated hazard trees within approximately 75 acres of the Fullerton Lake Recreation Area. All work shall be performed in conformance with the most recent version of the American National Standards Institute (ANSI) Z133 – Pruning, Trimming, Repairing, Maintaining, and Removing Trees, and Cutting Brush – Safety Requirements.
Hazard trees include:
Downed dead trees 6 inches in diameter or larger Standing dead trees 6 inches in diameter or larger Structurally compromised live trees identified as hazards Any marked sweet gum (Liquidambar styraciflua) near the campground area
All delineated hazard trees within the developed recreation footprint—including campgrounds, parking areas, road corridors, trails, and day-use areas—shall be mitigated to restore safe public access and administrative functionality following storm damage.
Work includes:
Felling and removal of hazard trees Limbing, bucking, and site cleanup Hauling and disposal of woody debris to a designated gravel pit located approximately 10.3 miles from the site Stump grinding within the footprint of the campground Mastication within the designated mastication area
The intent of this contract is to eliminate known hazardous conditions. Upon completion, the site shall be safe for public use and free of hazard trees within the defined project area.
3. Location
Work will occur at the Fullerton Lake Recreation Area on the Calcasieu Ranger District, Kisatchie National Forest near state route LA-399.
Project boundaries will be identified by maps and/or flagging provided by the Forest Service. The Contracting Officer’s Representative (COR) will verify work limits prior to commencement.
4. Hours of Work and Site Conditions
Work shall be performed between the hours of 0630 and 1730, Monday through Friday, unless otherwise approved by the COR.
Site conditions include:
No potable water available No toilet facilities available No electrical power available
The Contractor is responsible for providing all necessary support to safely perform the work under these conditions.
5. Technical Requirements
5.1 Hazard Tree Removal
5.1.1 Description of work
Cut and remove hazard trees to eliminate hazards to the public. Cut and remove identified hazard trees from roadways and designated areas shown on the attached project map. For the purposes of this contract, hazards will defined as follows:
Hazard trees are defined as any tree over 6 inches diameter with a major defect within the designated contract area and roadways.
Major defects include:
Dead-standing snags Significant dead stems, leaders, or scaffolds (that are too large to mitigate by pruning-out) Heavy, unnatural lean towards or parallel to target Open Hollows, cankers, or other areas of dead cambium or rot on trunk flare or bole of tree that encompasses over 30% of diameter at the site of defect.
Obvious internal hollows at trunk flare that account for over 66% basal area of tree.
Horizontal or vertical cracking on trunk flare, bole, or major scaffold.
Root lifting near base of tree.
Damage to, or exposure of, over 30% of major anchoring roots Significant recent canopy dieback on over 50% of crown.
5.2 Downed Log Removal
5.2.1 Description of work
Remove any downed woody material 4 inches or great in diameter Haul removed material to disposal site.
5.3 Mastication
5.3.1 Description of work
Mastication is allowed in the indicated mastication area shown on the attached map.
Piles of chipped or ground materials shall not be greater than 3 inches high as measured to the surrounding area, and chips shall be evenly spread across the area of disposal.
5.4 Stump Grinding
5.4.1 Description of work
Stumps designated for treatment will be marked or otherwise identified by the
Forest Service.
All stumps within the developed recreation footprint shall be ground to flush with grade (not to exceed 2 inches above surrounding ground surface).
Grindings shall be spread, removed, or otherwise treated as directed by the COR.
Final conditions shall not present tripping hazards or impede site usability.
Piles of chipped or ground materials shall not be greater than 3 inches high as measured to the surrounding area, and chips shall be evenly spread across the area of disposal.
No woody material shall be left in open grass areas.
5.5 Hauling and Disposal
5.5.1 Description of work
All woody material shall be transported to and disposed of at a designated gravel pit located approximately 10 miles(see attached map) from the project site.
Material shall be disposed of in a manner that does not create additional hazards or environmental damage.
No debris shall be left within the recreation site unless approved by the COR.
6. Safety Requirements
6.1 Worker Safety
The Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to all Contractor or Sub-contractor employees on the job. Safety requirements are governed by OSHA regulations. Contractor shall provide employees with the proper personal protection equipment such as hard hats, goggles, chaps, leather gloves, hearing protection and high top leather work boots with lugged soles.
Each worksite should have readily available a first aid kit, a bee sting kit, two-way radios or cellular phones for communications in the remote areas of the parkway and a vehicle available for emergency transportation to a medical facility.
Sawyers shall be trained and currently certified in first aid and CPR as per OSHA requirements.
Establish and maintain safe work zones and exclusion areas Conduct daily Job Hazard Analyses (JHA) Contractor shall provide a copy of Company Safety Plan that addresses all safety topics including work hazards associated with this project and accident and spill response.
6.2 Fire Prevention
Contractor shall take all necessary precautions to prevent fire during this contract work. Internal combustion equipment shall be located by the contractor so that exhausts discharge well away from combustible materials. The contractor shall provide a minimum of one fire extinguisher per vehicle/equipment at each separate job site that is appropriate for each type of fire that could occur on the job. Contractor shall notify COR as soon as possible of any fire starts regardless of size and whether or not fire is/was contained.
6.3 Hazardous Material Spill
Immediately contain and clean-up the release or spill of hazardous materials (e.g.
vehicle and equipment oil and fluids) in conformance with Hazardous Waste containment and clean-up requirements and immediately report the incident to the
COR.
6.4 Accident Reporting
Report all accidents on the jobsite to the District Ranger and COR or area Project
Inspector.
7. Special Project Requirements
7.1 Protection of Recreation Area Infrastructure
Protect asphalt pavement in a manner that felling operations, dragging, outriggers, equipment, tracks, etc. will not damage asphalt. Small patches will not be allowed on any sections of roadway that have been paved or overlaid within 3 years. Mill and overlay full lane width per FHWA special contract requirements will be required on newly paved sections of road damaged by the Contractor during contract operations.
Any asphalt, grounds, guardrail, signs, or other park amenities damaged due to construction activities will be repaired at the expense of the contractor.
7.2 Protection of Trees and Vegetation
All pruning and felling shall be performed to industry standards based on ANSI Z133 and ANSI A300:Part 1. Pruning shall be performed from a bucket truck, aerial lift, or with a trained tree climber with appropriate rope techniques. Pruning non-removal trees via spiking/gaffing is not allowed in this contract.
Care should be taken to limit damage to non-target trees during felling operations.
If non-hazard trees are struck and damaged through felling operations, the contractor is responsible for mitigating any new hazards (e.g., pruning out large broken branches if they present a hazard, felling trees that have been compromised).
Woody material shall not be piled next to non-hazard trees, even temporarily, due to risk of damage to tree base and roots.
The contractor must stop work immediately and immediately notify the COR if any cultural resources are encountered.
7.3 Environmental Protections
Operations shall minimize disturbance to soil, water, and residual vegetation.
Equipment shall remain within designated work areas unless otherwise approved.
The Contractor shall prevent and control spills of fuel, oil, or hazardous materials and report any incidents immediately.
All work shall comply with applicable environmental regulations and Forest
Service direction.
7.4 Certified Arborist
The contractor shall provide a Louisiana Agriculture and Forestry licensed arborist who shall be required to be on-site at all times that any tree work is taking place. Provide alternate certified arborist whenever primary arborist must be off site
8. Performance Standards
All designated hazard trees shall be removed or mitigated.
No hazard trees shall remain within striking distance of developed infrastructure or use areas.
The recreation site shall be left in a clean, safe, and usable condition.
No avoidable damage shall occur to roads, campsites, utilities, or other improvements.
Repair any direct or indirect damage to Government property caused by the
Contractor’s personnel or equipment and restore such property to its condition prior to sustaining such damage.
All work shall meet applicable safety and technical requirements.
9. Required Contractor Documents
Contractors will be required to submit the following before beginning work:
Certificate of Insurance Safety Plan SF 1413s for All subcontractors First Aid and CPR Certification of all Sawyers Certification/Licensure of Certified Arborists
10. Inspection and Acceptance
The COR will monitor work progress and compliance.
The Contractor shall coordinate with the COR for required inspections.
Final acceptance will occur when:
o All hazard trees have been removed o Debris has been treated as specified o The site meets safety and usability standards
11. Measurement and Payment
Payment will be made as a single lump sum for completion of all work described in this contract.
The lump sum price shall include all costs for:
Labor Equipment Supervision Felling, limbing, and processing
Hauling and disposal Stump grinding Site cleanup All incidentals necessary to complete the work
No separate payment will be made for any individual component of the work.
12. Period of Performance
Work shall be completed within 60 calendar days from Notice to Proceed (NTP), or as otherwise specified in the contract.
13. Products
Government-Furnished Property/Products: None Contractor-Furnished Property/Products: None
14. Locations
Fullerton Lake Campground 125 LA-399(Google Maps) Pitkin, LA 70656
15. Authorities and References
Forest Service Manual (FSM 2330 – Recreation Management) Forest Service Manual (FSM 6700 – Safety and Health Program) 29 CFR 1910 – Occupational Safety and Health Standards 29 CFR 1910.266 – Logging Operations 36 CFR 261.3 – Prohibitions
These authorities require the identification and mitigation of hazards within developed recreation sites to ensure safe conditions for public use and reduce agency liability.
16. Contracting Officer’s Representative (COR)
The COR will be designated by the Contracting Officer and is responsible for technical oversight, inspection, and acceptance of work. The COR does not have authority to modify contract terms.
17. Special Considerations
Work may occur in areas open to the public; the Contractor shall ensure public safety at all times.
Temporary closures or traffic control may be required.
Emergency access shall be maintained unless otherwise approved.
SCHEDULE OF ITEMS
ITEM
# DESCRIPTION PAY
UNIT
ESTIMATED
QUANTITY
UNIT
COST
EXTENDED
COST
Hazard Tree Removal, Disposal, and Stump
Grinding - Fullerton Lake Recreation Area (includes all labor, equipment, felling, limbing, hauling, disposal, stump grinding, masticating, and site cleanup within approximately 65 acres)
LS 1
TOTAL ESTIMATED COST