This is a Schedule of Items document detailing the scope of work for a federal contract opportunity with the U.S. Department of Agriculture Forest Service for mechanical site preparation and fuels reduction work on the Superior National Forest in northeastern Minnesota during Fiscal Year 2026.
The contract encompasses two separate awards: Award 01 covers rock raking mechanical site preparation on the Laurentian Ranger District in Aurora, Minnesota, involving 146 estimated acres across seven map units (LN-01 through LN-07) with a period of operations from June 1 through November 4, 2026, dependent on soil conditions. Work requires moving boulders to establish temporary road access from Forest Road 273 and Township Murphy Lake, with roads to be re-closed upon completion. Award 02 covers mastication fuels work on the LaCroix Ranger District in Cook, Minnesota, involving 40 estimated acres across two map units (CWRRP-1 and CWRRP-2) with a period of operations extending from June 1, 2026 through April 1, 2027. The mastication units contain a mixture of mature pine, cedar, birch, and aspen with significant balsam fir infestation from spruce budworm damage, including standing and downed material; units are marked with pink flagging and accessed via Mud Creek Road. Both awards require pre-operational meetings with the Contracting Officer's Representative before implementation. Technical points of contact are Michael Sauter for the Laurentian District and Paul Valento or Lori Karau for the LaCroix District. Offerors must submit unit prices for each contract line item extended to a total price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items March 5, 2026
Project: R9 Superior National Forest, Laurentian and LaCroix Mech Site Prep & Fuels Work FY2026
This contract includes mechanical site prep (rock raking) and fuels work (mastication) on two of the districts on the Superior National Forest in northeastern Minnesota. The table below has the Districts, Office Locations, COR or Technical Point of Contacts.
Two awards may be result of this solicitation.
· Award 01 for the mechanical site prep work on the Laurentian Ranger District, Aurora, MN and
· Award 02 for the mastication work on the LaCroix Ranger District, Cook, MN.
Anticipated Award 01 – Laurentian Ranger District, Aurora, MN
| Item No. |
| Schedule of Service |
| Estimated Quantity |
| Unit |
| Unit Price |
| Amount |
| 001 |
| Rock Raking (Mech Site Prep) |
| 146 |
| acre |
| $ |
| $ |
Anticipated Award 02 – LaCROIX Ranger District, Cook, MN
| Item No. |
| Schedule of Service |
| Estimated Quantity |
| Unit |
| Unit Price |
| Amount |
| 002 |
| Fuels work (Mastication) |
| 40 |
| acre |
| $ |
| $ |
A pre-operational meeting with COR will be required with the contractor before implementing projects.
Table 1: COR Contact information
| District Name |
| Office Location |
| COR or Tech POC |
| Laurentian |
| Aurora, MN |
| Michael Sauter |
| michael.sauter@usda.gov |
| LaCROIX |
| Cook, MN |
| Paul Valento |
| paul.valento@usda.gov |
| LaCROIX |
| Cook, MN |
| Lori Karau |
| lori.karau@usda.gov |
Mechanical Site Prep and Fuels Work Unit Information – District, Map Units, Access and Supplemental Project Information
Next two tables show more details of the work by contract line items.
Table 2: AWARD 01 - Item Nbr 001 – Mechanical Site Prep – Rock Raking (post-harvest) Period of Operations: Dry or Frozen Ground: June 1 – November 4, 2026 dependent on soil conditions.
| Line Iem |
| District |
| Map Unit Nbr |
| ACRE |
| Access |
| Supplemental Project Information |
| 001 |
| Laurentian |
| LN-01 |
| 61 |
| Move Boulders to access temp road heading SE from FR 273. |
| Road must be re-closed when complete. |
| 001 |
| Laurentian |
| LN-02 |
| 12 |
| Move Boulders to access temp road heading SE from FR 273. |
| Road must be re-closed when complete. |
| 001 |
| Laurentian |
| LN-03 |
| 6 |
| Move Boulders to access temp road heading SE from FR 273. Road must be re-closed when complete. |
| Road must be re-closed when complete. |
| 001 |
| Laurentian |
| LN-04 |
| 27 |
| Direct Access via temp road heading East from TWP Murphy Lake |
| 001 |
| Laurentian |
| LN-05 |
| 16 |
| Walk dozer 400 feet from temp road heading East from TWP Murphy Lake |
| 001 |
| Laurentian |
| LN-06 |
| 9 |
| Direct access from SC 416 |
| 001 |
| Laurentian |
| LN-07 |
| 15 |
| Access through LAU-07 |
| Rock Rake - total: |
| 146 |
| acres |
Table 3: AWARD 02 - Item Nbr 002 – Fuels Work - Mastication Period of Operations: Dry or Frozen Ground: June 1, 2026 – April 1, 2027 dependent on soil conditions.
| Line Count |
| District |
| Map Unit Nbr |
| ACRE |
| Access |
| Supplemental Project Information |
| 002 |
| LaCroix |
| CWRRP-1 |
| 29 |
| Access off Mud Creek Road |
| Units are flagged with pink colored flagging. |
| 002 |
| LaCroix |
| CWRRP-2 |
| 11 |
| Access off Mud Creek Road |
| Units are flagged with pink colored flagging. |
| Mastication - total: |
| 40 |
| acres |
Site description that apply to the Mastication Map Units.
These units have a mixture of mature pine, cedar, birch, and aspen. The general size of the aspen, and birch is between 6 – 10” at DBH. Most of the cedar, spruce, and pines are greater than 10” DBH. The treatment area has a moderate to heavy stocking of balsam fir in the midstory and understory. The area was hit by spruce budworm, so there is an abundance of dead standing and down balsam fir. The work would be treating all balsam fir regardless of size. The average size of the balsam fir is 1 to 6-inch DBH but balsam fir up to 14-inch DBH exists. In some areas there is greater than 5,000 stems to the acre of balsam fir. There are some larger boulders scattered throughout the treatment area. Some areas may be steep, especially areas adjacent to the lakeshore.
Page 2 of 2 – Superior National Forest Mechanical Site Prep and Fuels Work 2026