1_Schedule of Items -- Trail ERFO Repairs.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- El Yunque National Forest Trails
- Solicitation number
- 12441922R0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a schedule of items and specifications for a federal contract opportunity to perform trail repairs on the El Yunque National Forest in Puerto Rico. The work includes engineering design, erosion control, clearing, demolition, excavation, culvert installation, slope stabilization, trail surfacing, and landscaping across six trail systems. Optional line items include additional demolition, slope repairs, trail realignment, and bridge construction. The contract has an estimated value between $1 million and $5 million, with performance required by May 2023 and work to begin in July 2022. The opportunity is set aside for small businesses with average annual receipts under $39.5 million. The solicitation will be available on SAM.gov in May 2022, and a site visit will be included. Offerors must be registered in SAM and maintain registration through award and performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_12441922R0002_Amd_0002.pdf | ||
| AMEND_0001_06022022_FINAL.pdf | ||
| 12441922R0002_FINAL_05272022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
| Solicitation No: 12441922R0002 |
| SCHEDULE OF ITEMS |
MOBILIZATION
(1) ANGELITO TRAIL ERFO REPAIR
(2) MT. BRITTON TRAIL ERFO REPAIR
(3) CAIMITILLO TRAIL ERFO REPAIR
(4) CAIMITILLO SPUR ERFO REPAIR
(5) EL YUNQUE TRAIL ERFO REPAIR
(6) BANO DE ORO TRAIL ERFO REPAIR
| Item No. | Description | Estimated Quantity | Pay Unit | Unit Price | Unit Total |
| 15101 | Mobilization / Demobilization | 1 | Lump Sum | $ - 0 | $ - 0 |
| SUB-TOTAL PRICE | $ - 0 |
| ANGELITO TRAIL ERFO REPAIR | |||||
| Item No. | Description | Estimated Quantity | Pay Unit | Unit Price | Unit Total |
| 25702(1) | Contractor designed, 60 inch span x 72 inch rise, precast or reinforced cast-in-place concrete three (3) sided box culvert with Footings and Reinforced Concrete Wingwalls w/ weep holes (All Sides) | 12 | Foot | $ - 0 | $ - 0 |
| 30104(1) | Aggregate base, grading A (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) | 32 | Ton | $ - 0 | $ - 0 |
| 60306(1) | Contractor construction, 60 inch span x 72 inch rise, precast or reinforced cast-in-place concrete three (3) sided box culvert with Footings and Reinforced Concrete Wingwalls w/ weep holes (All Sides) and all Dewatering | 12 | Foot | $ - 0 | $ - 0 |
| 64801(1) | Placed Streambed simulation rock, bed class submittal required, method machine place | 6 | Cubic Yard | $ - 0 | $ - 0 |
SUB-TOTAL PRICE $ - 0
| ANGELITO TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S) | |||||
| 15713(1) | Soil Erosion & Pollution Control | 1 | Lump Sum | $ - 0 | $ - 0 |
| 20302(1) | Removal of 36" dia x 4' Length Round Concrete Culvert, disposal method, Legally off National Forest | 1 | Each | $ - 0 | $ - 0 |
| 20701(1) | Earthwork geosynthetics, type Class I, nonwoven, Type A | 130 | Square Yard | $ - 0 | $ - 0 |
| 25105(1) | Keyed riprap, class 5 | 50 | Ton | $ - 0 | $ - 0 |
| 25702(2) | Contractor designed, 41' (plus or minus 4') span x 66" wide, precast and/or concrete reinforced trail bridge | 1 | Lump Sum | $ - 0 | $ - 0 |
| 30104(2) | Aggregate base, grading 6" surge stone compaction method FP-14 Section 204.11(a)(1) | 23 | Ton | $ - 0 | $ - 0 |
| 62506(1) | Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance) | 1467 | Square Yard | $ - 0 | $ - 0 |
| 62606(1) | Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements] | 1467 | Square Yard | $ - 0 | $ - 0 |
| OPTIONAL PAY ITEM SUB-TOTAL PRICE | $ - 0 |
| MT. BRITTON TRAIL ERFO REPAIR | |||||
| Item No. | Description | Estimated Quantity | Pay Unit | Unit Price | Unit Total |
| 15713(2) | Soil Erosion & Pollution Control | 1 | Lump Sum | $ - 0 | $ - 0 |
| 20307(1) | Removal of 41' length x 2' wide existing concrete trail section, disposal method, Legally off National Forest | 82 | Square Feet | $ - 0 | $ - 0 |
| 20307(2) | Removal of 608' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest | 1824 | Square Feet | $ - 0 | $ - 0 |
| 25702(3) | Contractor designed, 41-ft long x 7' (plus/minus 1') depth gabion wall fill slope repair | 1 | Lump Sum | $ - 0 | $ - 0 |
| 30104(3) | Aggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) | 142 | Ton | $ - 0 | $ - 0 |
| 60101(1) | Concrete, 4" depth concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished Trail Surface (concrete color shall match existing) | 27 | Cubic Yard | $ - 0 | $ - 0 |
| 60306(2) | Contractor construction, 41-ft long x 7' (plus/minus 1') depth gabion wall fill slope repair | 1 | Lump Sum | $ - 0 | $ - 0 |
SUB-TOTAL PRICE $ - 0
| MT. BRITTON TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S) | |||||
| 25702(5) | Contractor designed, Trail Section, Trail Stabilization at Dam, and Stairway Repair/Reconstruction | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(4) | Contractor construction, Trail Section, Trail Stabilization at Dam, and Stairway Repair/Reconstruction | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60413(1) | Remove and reset, historic rocks/stones along asphalt trail that shall be removed | 1 | Lump Sum | $ - 0 | $ - 0 |
| 62506(2) | Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance) | 2787 | Square Yard | $ - 0 | $ - 0 |
| 62606(2) | Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements] | 2787 | Square Yard | $ - 0 | $ - 0 |
| OPTIONAL PAY ITEM SUB-TOTAL PRICE | $ - 0 |
| CAIMITILLO TRAIL ERFO REPAIR | |||||
| Item No. | Description | Estimated Quantity | Pay Unit | Unit Price | Unit Total |
| 15713(3) | Soil Erosion & Pollution Control | 1 | Lump Sum | $ - 0 | $ - 0 |
| 20307(3) | Removal of 637' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest | 1911 | Square Feet | $ - 0 | $ - 0 |
| 30104(4) | Aggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) | 205 | Ton | $ - 0 | $ - 0 |
| 60101(2) | Concrete, 4" depth concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished Trail Surface (concrete color shall match existing) | 26 | Cubic Yard | $ - 0 | $ - 0 |
SUB-TOTAL PRICE $ - 0
| CAIMITILLO TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S) | |||||
| 20302(3) | Removal of 12" dia. x 5' Length Culverts, disposal method, Legally off National Forest | 7 | Each | $ - 0 | $ - 0 |
| 20307(4) | Removal of 1,060' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest | 3180 | Square Feet | $ - 0 | $ - 0 |
| 25702(6) | Contractor designed, 7 Individual concrete rock culvert w/ top | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(5) | Contractor construction, 7 Individual concrete rock culvert w/ top | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60413(2) | Remove and reset, rocks/stones along asphalt trail that shall be removed | 1 | Lump Sum | $ - 0 | $ - 0 |
| 62506(3) | Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance) | 1509 | Square Yard | $ - 0 | $ - 0 |
| 62606(3) | Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements] | 1509 | Square Yard | $ - 0 | $ - 0 |
| OPTIONAL PAY ITEM SUB-TOTAL PRICE | $ - 0 |
| CAIMITILLO SPUR ERFO REPAIR | |||||
| Item No. | Description | Estimated Quantity | Pay Unit | Unit Price | Unit Total |
| 15713(4) | Soil Erosion & Pollution Control | 1 | Lump Sum | $ - 0 | $ - 0 |
| 20302(4) | Removal of 12" dia. x 5' Length Concrete Culvert, disposal method, Legally off National Forest | 1 | Each | $ - 0 | $ - 0 |
| 25702(7) | Contractor designed, 121-ft long x 10' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60201(1) | 12 inch dia. pipe culvert, concrete w/ Class 2 riprap energy dissipator | 24 | Foot | $ - 0 | $ - 0 |
| 60306(6) | Contractor construction, 121-ft long x 10' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
SUB-TOTAL PRICE $ - 0
| CAIMITILLO SPUR ERFO REPAIR -- OPTIONAL PAY ITEM(S) | |||||
| 62506(4) | Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance) | 900 | Square Yard | $ - 0 | $ - 0 |
| 62606(4) | Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements] | 900 | Square Yard | $ - 0 | $ - 0 |
| OPTIONAL PAY ITEM SUB-TOTAL PRICE | $ - 0 |
| EL YUNQUE TRAIL ERFO REPAIR | |||||
| Item No. | Description | Estimated Quantity | Pay Unit | Unit Price | Unit Total |
| 15713(5) | Soil Erosion & Pollution Control | 1 | Lump Sum | $ - 0 | $ - 0 |
| 20104(1) | Clearing and grubbing, disposal method, Legally off Government Lands | 264 | Square Feet | $ - 0 | $ - 0 |
| 20301(2) | Removal of 40-ft long x 36" to 48" wide trail switchback failure and failure material, disposal method Legally off National Forest | 1 | Lump Sum | $ - 0 | $ - 0 |
| 25702(8) | Contractor designed, 40-ft long x 36' depth gabion wall cut slope repair (Gabion Basket Designed to Grow Vegetation) or Wire Face / Block/ and/or Panel MSE Wall, Soil Nailing or equal | 1 | Lump Sum | $ - 0 | $ - 0 |
| 25702(9) | Contractor designed, 16-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 25702(10) | Contractor designed, 13-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 25702(12) | Contractor designed, 40-ft long x 36" to 48" wide trail switchback failure redesign w/ landing and smooth transition | 1 | Lump Sum | $ - 0 | $ - 0 |
| 25702(13) | Contractor designed, 40-ft long x 18' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(7) | Contractor construction, 40-ft long x 36' depth gabion wall cut slope repair (Gabion Basket Designed to Grow Vegetation) or Wire Face / Block/ and/or Panel MSE Wall, Soil Nailing or equal | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(8) | Contractor construction, 16-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(9) | Contractor construction, 13-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(11) | Contractor construction, 40-ft long x 36" to 48" wide trail switchback failure redesign w/ landing and smooth transition | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(12) | Contractor construction, 40-ft long x 18' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
SUB-TOTAL PRICE $ - 0
| EL YUNQUE TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S) | |||||
| 20307(5) | Removal of 1030' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest | 3090 | Square Feet | $ - 0 | $ - 0 |
| 20701(2) | Earthwork geosynthetics, type Class I, nonwoven, Type A | 615 | Square Yard | $ - 0 | $ - 0 |
| 25702(11) | Contractor designed, 45-ft trail horizontal alignment x 36" wide trail width w/ proposed 18" depth rock culvert and removing existing trail segment at location | 1 | Lump Sum | $ - 0 | $ - 0 |
| 30104(5) | Aggregate base, grading A (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) | 257 | Ton | $ - 0 | $ - 0 |
| 30104(6) | Aggregate base, grading AASHTO #57 Stone (no fines) compaction method FP-14 Section 204.11(a)(1) | 247 | Ton | $ - 0 | $ - 0 |
| 60306(10) | Contractor construction, 45-ft trail horizontal alignment x 36" wide trail width w/ proposed 18" depth rock culvert and removing existing trail segment at location | 1 | Lump Sum | $ - 0 | $ - 0 |
| 62506(5) | Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance) | 12933 | Square Yard | $ - 0 | $ - 0 |
| 62606(5) | Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements] | 12933 | Square Yard | $ - 0 | $ - 0 |
| OPTIONAL PAY ITEM SUB-TOTAL PRICE | $ - 0 |
| BANO DE ORO TRAIL ERFO REPAIR | |||||
| Item No. | Description | Estimated Quantity | Pay Unit | Unit Price | Unit Total |
| 15713(6) | Soil Erosion & Pollution Control | 1 | Lump Sum | $ - 0 | $ - 0 |
| 25702(15) | Contractor designed, 37' (plus or minus 3') span x 60" wide, reinforced concrete low water crossing trail bridge | 1 | Lump Sum | $ - 0 | $ - 0 |
| 60306(14) | Contractor construction, 37' (plus or minus 3') span x 60" wide, reinforced concrete low water crossing trail bridge | 1 | Lump Sum | $ - 0 | $ - 0 |
SUB-TOTAL PRICE $ - 0
| BANO DE ORO TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S) | |||||
| 25702(14) | Contractor designed, 56-ft long x 11' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 30104(7) | Aggregate base, grading A (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1) | 25 | Ton | $ - 0 | $ - 0 |
| 60306(13) | Contractor construction, 56-ft long x 11' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation) | 1 | Lump Sum | $ - 0 | $ - 0 |
| 62506(6) | Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance) | 1340 | Square Yard | $ - 0 | $ - 0 |
| 62606(6) | Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements] | 1340 | Square Yard | $ - 0 | $ - 0 |
| OPTIONAL PAY ITEM SUB-TOTAL PRICE | $ - 0 |
GRAND TOTAL $ - 0