This document contains a schedule of items and specifications for a federal contract opportunity to perform trail repairs on the El Yunque National Forest in Puerto Rico. The work includes engineering design, erosion control, clearing, demolition, excavation, culvert installation, slope stabilization, trail surfacing, and landscaping across six trail systems. Optional line items include additional demolition, slope repairs, trail realignment, and bridge construction. The contract has an estimated value between $1 million and $5 million, with performance required by May 2023 and work to begin in July 2022. The opportunity is set aside for small businesses with average annual receipts under $39.5 million. The solicitation will be available on SAM.gov in May 2022, and a site visit will be included. Offerors must be registered in SAM and maintain registration through award and performance.

View the file

Other files

File Type Posted
Sol_12441922R0002_Amd_0002.pdf PDF
AMEND_0001_06022022_FINAL.pdf PDF
12441922R0002_FINAL_05272022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

Solicitation No: 12441922R0002
SCHEDULE OF ITEMS

MOBILIZATION

(1) ANGELITO TRAIL ERFO REPAIR

(2) MT. BRITTON TRAIL ERFO REPAIR

(3) CAIMITILLO TRAIL ERFO REPAIR

(4) CAIMITILLO SPUR ERFO REPAIR

(5) EL YUNQUE TRAIL ERFO REPAIR

(6) BANO DE ORO TRAIL ERFO REPAIR

Item No.DescriptionEstimated QuantityPay UnitUnit PriceUnit Total
15101Mobilization / Demobilization1Lump Sum$ - 0$ - 0
SUB-TOTAL PRICE$ - 0
ANGELITO TRAIL ERFO REPAIR
Item No.DescriptionEstimated QuantityPay UnitUnit PriceUnit Total
25702(1)Contractor designed, 60 inch span x 72 inch rise, precast or reinforced cast-in-place concrete three (3) sided box culvert with Footings and Reinforced Concrete Wingwalls w/ weep holes (All Sides)12Foot$ - 0$ - 0
30104(1)Aggregate base, grading A (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)32Ton$ - 0$ - 0
60306(1)Contractor construction, 60 inch span x 72 inch rise, precast or reinforced cast-in-place concrete three (3) sided box culvert with Footings and Reinforced Concrete Wingwalls w/ weep holes (All Sides) and all Dewatering12Foot$ - 0$ - 0
64801(1)Placed Streambed simulation rock, bed class submittal required, method machine place6Cubic Yard$ - 0$ - 0

SUB-TOTAL PRICE $ - 0

ANGELITO TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S)
15713(1)Soil Erosion & Pollution Control1Lump Sum$ - 0$ - 0
20302(1)Removal of 36" dia x 4' Length Round Concrete Culvert, disposal method, Legally off National Forest1Each$ - 0$ - 0
20701(1)Earthwork geosynthetics, type Class I, nonwoven, Type A130Square Yard$ - 0$ - 0
25105(1)Keyed riprap, class 550Ton$ - 0$ - 0
25702(2)Contractor designed, 41' (plus or minus 4') span x 66" wide, precast and/or concrete reinforced trail bridge1Lump Sum$ - 0$ - 0
30104(2)Aggregate base, grading 6" surge stone compaction method FP-14 Section 204.11(a)(1)23Ton$ - 0$ - 0
62506(1)Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance)1467Square Yard$ - 0$ - 0
62606(1)Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements]1467Square Yard$ - 0$ - 0
OPTIONAL PAY ITEM SUB-TOTAL PRICE$ - 0
MT. BRITTON TRAIL ERFO REPAIR
Item No.DescriptionEstimated QuantityPay UnitUnit PriceUnit Total
15713(2)Soil Erosion & Pollution Control1Lump Sum$ - 0$ - 0
20307(1)Removal of 41' length x 2' wide existing concrete trail section, disposal method, Legally off National Forest82Square Feet$ - 0$ - 0
20307(2)Removal of 608' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest1824Square Feet$ - 0$ - 0
25702(3)Contractor designed, 41-ft long x 7' (plus/minus 1') depth gabion wall fill slope repair1Lump Sum$ - 0$ - 0
30104(3)Aggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)142Ton$ - 0$ - 0
60101(1)Concrete, 4" depth concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished Trail Surface (concrete color shall match existing)27Cubic Yard$ - 0$ - 0
60306(2)Contractor construction, 41-ft long x 7' (plus/minus 1') depth gabion wall fill slope repair1Lump Sum$ - 0$ - 0

SUB-TOTAL PRICE $ - 0

MT. BRITTON TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S)
25702(5)Contractor designed, Trail Section, Trail Stabilization at Dam, and Stairway Repair/Reconstruction1Lump Sum$ - 0$ - 0
60306(4)Contractor construction, Trail Section, Trail Stabilization at Dam, and Stairway Repair/Reconstruction1Lump Sum$ - 0$ - 0
60413(1)Remove and reset, historic rocks/stones along asphalt trail that shall be removed1Lump Sum$ - 0$ - 0
62506(2)Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance)2787Square Yard$ - 0$ - 0
62606(2)Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements]2787Square Yard$ - 0$ - 0
OPTIONAL PAY ITEM SUB-TOTAL PRICE$ - 0
CAIMITILLO TRAIL ERFO REPAIR
Item No.DescriptionEstimated QuantityPay UnitUnit PriceUnit Total
15713(3)Soil Erosion & Pollution Control1Lump Sum$ - 0$ - 0
20307(3)Removal of 637' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest1911Square Feet$ - 0$ - 0
30104(4)Aggregate base, grading C (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)205Ton$ - 0$ - 0
60101(2)Concrete, 4" depth concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished Trail Surface (concrete color shall match existing)26Cubic Yard$ - 0$ - 0

SUB-TOTAL PRICE $ - 0

CAIMITILLO TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S)
20302(3)Removal of 12" dia. x 5' Length Culverts, disposal method, Legally off National Forest7Each$ - 0$ - 0
20307(4)Removal of 1,060' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest3180Square Feet$ - 0$ - 0
25702(6)Contractor designed, 7 Individual concrete rock culvert w/ top1Lump Sum$ - 0$ - 0
60306(5)Contractor construction, 7 Individual concrete rock culvert w/ top1Lump Sum$ - 0$ - 0
60413(2)Remove and reset, rocks/stones along asphalt trail that shall be removed1Lump Sum$ - 0$ - 0
62506(3)Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance)1509Square Yard$ - 0$ - 0
62606(3)Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements]1509Square Yard$ - 0$ - 0
OPTIONAL PAY ITEM SUB-TOTAL PRICE$ - 0
CAIMITILLO SPUR ERFO REPAIR
Item No.DescriptionEstimated QuantityPay UnitUnit PriceUnit Total
15713(4)Soil Erosion & Pollution Control1Lump Sum$ - 0$ - 0
20302(4)Removal of 12" dia. x 5' Length Concrete Culvert, disposal method, Legally off National Forest1Each$ - 0$ - 0
25702(7)Contractor designed, 121-ft long x 10' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
60201(1)12 inch dia. pipe culvert, concrete w/ Class 2 riprap energy dissipator24Foot$ - 0$ - 0
60306(6)Contractor construction, 121-ft long x 10' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0

SUB-TOTAL PRICE $ - 0

CAIMITILLO SPUR ERFO REPAIR -- OPTIONAL PAY ITEM(S)
62506(4)Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance)900Square Yard$ - 0$ - 0
62606(4)Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements]900Square Yard$ - 0$ - 0
OPTIONAL PAY ITEM SUB-TOTAL PRICE$ - 0
EL YUNQUE TRAIL ERFO REPAIR
Item No.DescriptionEstimated QuantityPay UnitUnit PriceUnit Total
15713(5)Soil Erosion & Pollution Control1Lump Sum$ - 0$ - 0
20104(1)Clearing and grubbing, disposal method, Legally off Government Lands264Square Feet$ - 0$ - 0
20301(2)Removal of 40-ft long x 36" to 48" wide trail switchback failure and failure material, disposal method Legally off National Forest1Lump Sum$ - 0$ - 0
25702(8)Contractor designed, 40-ft long x 36' depth gabion wall cut slope repair (Gabion Basket Designed to Grow Vegetation) or Wire Face / Block/ and/or Panel MSE Wall, Soil Nailing or equal1Lump Sum$ - 0$ - 0
25702(9)Contractor designed, 16-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
25702(10)Contractor designed, 13-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
25702(12)Contractor designed, 40-ft long x 36" to 48" wide trail switchback failure redesign w/ landing and smooth transition1Lump Sum$ - 0$ - 0
25702(13)Contractor designed, 40-ft long x 18' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
60306(7)Contractor construction, 40-ft long x 36' depth gabion wall cut slope repair (Gabion Basket Designed to Grow Vegetation) or Wire Face / Block/ and/or Panel MSE Wall, Soil Nailing or equal1Lump Sum$ - 0$ - 0
60306(8)Contractor construction, 16-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
60306(9)Contractor construction, 13-ft long x 9' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
60306(11)Contractor construction, 40-ft long x 36" to 48" wide trail switchback failure redesign w/ landing and smooth transition1Lump Sum$ - 0$ - 0
60306(12)Contractor construction, 40-ft long x 18' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0

SUB-TOTAL PRICE $ - 0

EL YUNQUE TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S)
20307(5)Removal of 1030' length x 3' wide existing asphalt trail section, disposal method, Legally off National Forest3090Square Feet$ - 0$ - 0
20701(2)Earthwork geosynthetics, type Class I, nonwoven, Type A615Square Yard$ - 0$ - 0
25702(11)Contractor designed, 45-ft trail horizontal alignment x 36" wide trail width w/ proposed 18" depth rock culvert and removing existing trail segment at location1Lump Sum$ - 0$ - 0
30104(5)Aggregate base, grading A (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)257Ton$ - 0$ - 0
30104(6)Aggregate base, grading AASHTO #57 Stone (no fines) compaction method FP-14 Section 204.11(a)(1)247Ton$ - 0$ - 0
60306(10)Contractor construction, 45-ft trail horizontal alignment x 36" wide trail width w/ proposed 18" depth rock culvert and removing existing trail segment at location1Lump Sum$ - 0$ - 0
62506(5)Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance)12933Square Yard$ - 0$ - 0
62606(5)Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements]12933Square Yard$ - 0$ - 0
OPTIONAL PAY ITEM SUB-TOTAL PRICE$ - 0
BANO DE ORO TRAIL ERFO REPAIR
Item No.DescriptionEstimated QuantityPay UnitUnit PriceUnit Total
15713(6)Soil Erosion & Pollution Control1Lump Sum$ - 0$ - 0
25702(15)Contractor designed, 37' (plus or minus 3') span x 60" wide, reinforced concrete low water crossing trail bridge1Lump Sum$ - 0$ - 0
60306(14)Contractor construction, 37' (plus or minus 3') span x 60" wide, reinforced concrete low water crossing trail bridge1Lump Sum$ - 0$ - 0

SUB-TOTAL PRICE $ - 0

BANO DE ORO TRAIL ERFO REPAIR -- OPTIONAL PAY ITEM(S)
25702(14)Contractor designed, 56-ft long x 11' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
30104(7)Aggregate base, grading A (FP-14 Table 703-2) compaction method FP-14 Section 204.11(a)(1)25Ton$ - 0$ - 0
60306(13)Contractor construction, 56-ft long x 11' (plus/minus 1') depth gabion wall fill slope repair (Gabion Basket Designed to Grow Vegetation)1Lump Sum$ - 0$ - 0
62506(6)Mulching, Dry method (Dry mulching shall be sterile. Contractor shall use in all areas of disturbance)1340Square Yard$ - 0$ - 0
62606(6)Plantings, cohitre (Commelina diffusa) and wedelia (Sphagneticola trilobata) [Refer to FSSS Section 626 for Planting Requirements]1340Square Yard$ - 0$ - 0
OPTIONAL PAY ITEM SUB-TOTAL PRICE$ - 0

GRAND TOTAL $ - 0