124150 O3 Addendum Four Q&A SPB 26.docx

DOCX document 29 KB Posted

Attached to
Tree Clearing at Merritt Reservoir Wildlife Management Area
Solicitation number
124150 O3
Issued by
Cherry County, Nebraska

About this file

This is Solicitation Addendum Four, a Questions and Answers document issued by the Nebraska Game & Parks Commission (NGPC) for tree clearing services at Merritt Reservoir Wildlife Management Area in Cherry County, Nebraska. The solicitation (Number 124150 O3) involves removing Eastern Red Cedar and Rocky Mountain Juniper trees across approximately 4,262.5 acres, comprising 3,965.1 acres of grasslands and 297.4 acres of woodlands. The primary removal methods include mulching, with cutting and piling permitted for trees over 20 feet tall with a diameter at breast height (DBH) exceeding 6 inches; trees 20 feet or shorter and those over 20 feet with DBH of 6 inches or less must be mulched. The project includes fuel reduction efforts and a 200-foot boundary treatment, with all work required to be completed by June 30, 2027. The solicitation opened on January 8, 2026, with responses due February 10, 2026, at 2:00 p.m. Central Time. A mandatory solicitation conference was held on January 21, 2026. The intent to award is scheduled for February 20, 2026, and the contract term runs from March 9, 2026, to June 30, 2027. The project will be awarded to a single contractor selected as the lowest responsible bidder.

The addendum addresses key operational clarifications, including treatment requirements on slopes of 35 percent or less, with steeper areas potentially excluded from cutting requirements. Contractors must work under dry or frozen ground conditions to minimize environmental impact, and completed work areas must be at least 200 acres in size prior to NGPC staff inspection and payment processing. The Nebraska Game & Parks Commission will be responsible for burning tree piles at a later date. Contractors may exchange merchantable timber for a decreased per-acre thinning rate, with all materials required to be removed by contract end. The solicitation includes specific environmental restrictions protecting Western Prairie Fringed Orchid, Northern Long-eared Bat, and Whooping Crane habitat. Contractors must maintain comprehensive insurance coverage, including Workers' Compensation, Commercial General Liability with a $2,000,000 general aggregate, and Commercial Automobile Liability with a $1,000,000 combined single limit. Secretary of State registration is required after intent to award and before contract execution for foreign entities. Per-acre pricing will form the basis for contract valuation.

View the file

Other files

File Type Posted
124150 O3 RFP MRWMA Revised.pdf PDF
Attachment 8 - MRWMA Unit 5 Fuels Reduction.pdf PDF
124150 O3 Solicitation List of Respondents.docx DOCX document
Attachment 6 - MRWMA Unit 6.pdf PDF
124150 O3 Addendum One SPB 27.docx DOCX document
124150 O3 Intent to Award Notice.docx DOCX document
Attachment 7 - MRWMA Unit 4 Fuels Reduction.pdf PDF
124150 O3 Addendum Three SPB 28.docx DOCX document
Attachment 4 - MRWMA Unit 5.pdf PDF
Attachment 3 - MRWMA Unit 4.pdf PDF
Attachment 2 - MRWMA Unit 2.pdf PDF
124150-O3 Cost Sheet Updated.xlsx XLSX spreadsheet
Copy of 124150-O3 Cost Sheet.xlsx XLSX spreadsheet
124150 O3 Bid Table.xlsx XLSX spreadsheet
Attachemnt 1 - MRWMA Unit 1.pdf PDF
124150 O3 Addendum Two SPB 28.docx DOCX document
124150 O3 Addendum Two SPB 28.docx DOCX document
124150 O3 Addendum Three SPB 28.docx DOCX document
Attachemnt 1 - MRWMA Unit 1.pdf PDF
Attachment 6 - MRWMA Unit 6.pdf PDF
Attachment 3 - MRWMA Unit 4.pdf PDF
124150 O3 Addendum Four Q&A SPB 26.docx DOCX document
Copy of 124150-O3 Cost Sheet.xlsx XLSX spreadsheet
124150 O3 RFP MRWMA Revised.pdf PDF
Attachment 2 - MRWMA Unit 2.pdf PDF
124150-O3 Cost Sheet Updated.xlsx XLSX spreadsheet
Attachment 8 - MRWMA Unit 5 Fuels Reduction.pdf PDF
124150 O3 Addendum One SPB 27.docx DOCX document
Attachment 7 - MRWMA Unit 4 Fuels Reduction.pdf PDF
Attachment 4 - MRWMA Unit 5.pdf PDF
124150 O3 Addendum Two SPB 28.docx DOCX document
Attachment 8 - MRWMA Unit 5 Fuels Reduction.pdf PDF
Copy of 124150-O3 Cost Sheet.xlsx XLSX spreadsheet
124150-O3 Cost Sheet Updated.xlsx XLSX spreadsheet
Attachment 7 - MRWMA Unit 4 Fuels Reduction.pdf PDF
124150 O3 Addendum One SPB 27.docx DOCX document
Attachment 6 - MRWMA Unit 6.pdf PDF
Attachment 4 - MRWMA Unit 5.pdf PDF
124150 O3 RFP MRWMA Revised.pdf PDF
Attachment 3 - MRWMA Unit 4.pdf PDF
Attachment 2 - MRWMA Unit 2.pdf PDF
Attachemnt 1 - MRWMA Unit 1.pdf PDF
Copy of 124150-O3 Cost Sheet.xlsx XLSX spreadsheet
Attachment 3 - MRWMA Unit 4.pdf PDF
124150 O3 Addendum One SPB 27.docx DOCX document
124150 O3 RFP MRWMA Revised.pdf PDF
Attachment 7 - MRWMA Unit 4 Fuels Reduction.pdf PDF
Attachment 4 - MRWMA Unit 5.pdf PDF
Attachment 6 - MRWMA Unit 6.pdf PDF
Attachemnt 1 - MRWMA Unit 1.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION ADDENDUM FOUR

QUESTIONS AND ANSWERS

SOLICITATION NUMBER: 124150 O3

Tree Clearing at Merritt Reservoir Wildlife Management Area Opening Date: February 10, 2026, 2:00 p.m. Central Time Addendum Effective Date: February 4, 2026.

Questions and Answers

Following are the questions submitted and answers provided for the above-mentioned solicitation. The questions and answers are to be considered as part of the solicitation. It is the responsibility of bidders to check the State Purchasing Bureau website for all addenda or amendments.

Question Number
RFP/ITB

Section Reference

RFP/ITB

Page Number

Question
State Response
1.
I. Procurement Procedure
3
Are the additional contractors who added their names to the bid meeting sheet (weren’t printed) eligible to bid on this project?
Yes, they are.
2.
I. Procurement Procedure
3
Do we need to be registered with the SECRETARY OF STATE/TAX COMMISSIONER when submitting the bid as a foreign entity or just before the contract is signed?
The Secretary of State Registration Requirement is after the Intend to award, and it is necessary to sign the contract.
3.
II. Vendor Duties
15
While evaluating the sites, a company, Skidder Bros was seen already doing work seemingly within the areas covered by this solicitation. Are they working under additional contract for the same sort of work issued for adjacent areas or are they working on a separate treatment prescription?

Will they be working concurrently within the areas solicited under this contract during the Period of Performance?

Skidder Bros is working under different contracts in specific areas, even though it is the same sort of work.

Current contract expires on June 30, 2026 with no renewals.

4.
V. Project Description and Scope of Work
22
In the woodland areas, are we to cut and mulch all cedar and juniper, or just those that are 6” DBH or less?
Specs state all trees 20 feet tall or less must be mulched, as well as any trees over 20 feet tall that have a diameter at breast height (DBH) of 6 inches or less. Trees over 20 feet in height with a DBH over 6 inches may be mulched or cut and piled. In general, however, we prefer to have as much mulched as possible.
5.
V. Project Description and Scope of Work
22
Is there a slope maximum for operations or should we plan on treating on all areas mapped?
Any areas with a slope of 35% or less will be mulched. In many areas, areas with a slope over 35% have been mapped out of the project.

Inclusions within the units that weren’t feasible to remove were left, with the understanding they likely would not be cut. Slope maps will be provided to the Contractor who is awarded the project.

6.
Section V
23
Is there any possibility of longer timeframe on completion?
The total project must be completed by June 30, 2027.
7.
Section V
22
What amount are you calling for to be done by July 31?
The project timeline has been modified. There is no longer a requirement for a specific number of acres to be completed by the end of July 2026. Instead, all acres must be completed by June 30th, 2027.

8.

Is there any possibility of splitting WMA into more than one project.
No. The project will be awarded to a single contractor, as it has been bid.
9.
Section V
23
Who is responsible for burning the piles of trees?
NGPC will be responsible for burning piles or hiring a contractor to burn the piles at a later date.
10.
Section V
23
Can the whole root ball of the tree be removed?
No. As the specs state, trees will either be mulched or cut at ground level and piled. Contractors are not allowed to use any other method of tree removal.
11.
Section V
23
Will the trees on the southwest steep slope end need to be cut?
Any area with a 35% slope or less is expected to be cut. There are several areas within the project units that are likely over this slope percentage and therefore are not expected to be cut. Slope maps will be provided to the Contractor who is awarded the project.

This addendum will be incorporated into the solicitation.