This document is a Revised Schedule of Items for a federal contract opportunity related to the Middle Fork Wild and Scenic River Access Site Deferred Maintenance project on the Flathead National Forest in Montana.
The Schedule of Items lists the specific supplies and services required, including mobilization, selective clearing, removal and replacement of concrete wheel stops, placement of barrier rock, aggregate surface course, roadway reconditioning, dust palliative application, and installation of a 42" arch pipe culvert. Pricing is requested on a unit price basis for each line item at the West Glacier, Cascadilla, and Paola River Access sites, as well as for access sign installation across the three sites. There are also two option items for work at the Bear Creek and Essex River Access sites. The government intends to award a single firm-fixed-price contract from this solicitation. Contractors must submit pricing for all items, and costs for mobilization and moves between job locations will be considered incidental to the work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LU24Q0042-0001 SF30 Amendment.pdf | ||
| Attachment 2 - Maps and Drawings Middlefork_WSR_Access_DeferredMaint.pdf | ||
| Attachment 1 - Schedule of Items Middlefork_WSR_Access_DeferredMaint.xlsx | XLSX spreadsheet | |
| Attachment 5 -Wage Determination MT 20240070 Dated 01-05-2024.pdf | ||
| 1240LU24Q0042 SF 1442 Middle Fork Wild and Scenic River Access Site Defe.pdf | ||
| Attachment 3 - FSSS Middlefork_WSR_Access_DeferredMaint.pdf | ||
| Attachment 4 - FSGAOA_Middlefork_WSR_Access_Deferred Maint.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED 7/22/2024
Item No.
Section # Supplies/Services Method of
Measurement* Unit of Issue** Qty Unit
Price Total Price
West Glacier River Access NFSR 10416
0001 15101 Mobilization LSQ LS 1 $ $
0002 20209 Selective Clearing, Roadside, Disposal Method (f) CQ MI 0.22 $ $
0003 20301 Removal of Concrete Wheel Stops, Disposal Method (a) AQ EA 13 $ $
0004 25250 Placed Barrier Rock AQ EA 3 $ $
0005 30207 Aggregate Surface Course, Compaction Method 2(c) CQ CY 500 $ $
0006 30309 Roadway Reconditioning, Compaction Method (b) CQ SQYD 1875 $ $
0007 30315 Roadway Reconditioning, Compaction Method (b) CQ MI 0.22 $ $
0008 31202 Dust Palliative Application, Type Magnesium Chloride OR Calcium Chloride, Method 1
CQ SQYD 4227 $ $
0009 60950 Portland Cement Concrete Wheel Stop (Eight Foot Length) AQ EA 13 $ $
TOTAL WEST GLACIER RIVER ACCESS: $
Cascadilla River Access NFSR 11062
0010 15101 Mobilization LSQ LS 1 $ $
0011 20207 Removal of Individual Trees, Disposal Method (f) AQ EA 2 $ $
0012 20209 Selective Clearing, Roadside, Disposal Method (f) CQ MI 0.2 $ $
0013 20301 Removal of Concrete Wheel Stops, Disposal Method (a) AQ EA 5 $ $
0014 30207 Aggregate Surface Course, Compaction Method 2(c) CQ CY 215 $ $
0015 30309 Roadway Reconditioning, Compaction Method (b) CQ SQYD 351 $ $
0016 30315 Roadway Reconditioning, Compaction Method (b) CQ MI 0.2 $ $
0017 60950 Portland Cement Concrete Wheel Stop (Eight Foot Length) AQ EA 5 $ $
TOTAL CASCADILLA RIVER ACCESS: $
Paola River Access NFSR 1151
0018 15101 Mobilization LSQ LS 1 $ $
0019 20209 Selective Clearing, Roadside, Disposal Method (f) CQ MI 0.11 $ $
0020 20302 Removal of Culvert, Disposal Method (a), Compaction Method (e) AQ EA 1 $ $
0021 25250 Placed Barrier Rock AQ EA 2 $ $
0022 30207 Aggregate Surface Course, Commercial Source, Compaction Method 2(c) CQ CY 152 $ $
0023 30309 Roadway Reconditioning, Compaction Method (b) CQ SQYD 543 $ $
0024 30315 Roadway Reconditioning, Compaction Method (b) CQ MI 0.11 $ $
0025 60201C 42” x 29” Arch Pipe Culvert, Corrugated Steel, 16 Gauge, Compaction Method (f) CQ FT 46 $ $
0026 60950 Portland Cement Concrete Wheel Stop (Eight Foot Length) AQ EA 6 $ $
TOTAL PAOLA RIVER ACCES: $
Access Sign Installation NFSR 10416, 11062, 1151
0027 63302 Access Sign Installation (Gov. Signs, Contr. Post & Hardware) LSQ LS 1 $ $
TOTAL ACCESS SIGN INSTALLATION: $
TOTAL AMOUNT QUOTED: $
TOTAL FOR BASE ITEMS 0001-0027 $
OPTION ITEM A Bear Creek Access NFSR 10370
1001 15101 Mobilization LSQ LS 1 $ $
1002 30309 Roadway Reconditioning, Compaction Method (b) CQ SQYD 5130 $ $
1003 30315 Rodway Reconditioning, Compaction Method (b) CQ MI 0.39 $ $
TOTAL OPTION ITEM A $
OPTION ITEM B Essex River Access NFSR 10369
2001 15101 Mobilization LSQ LS 1 $ $
2002 30309 Roadway Reconditioning, Compaction Method (b) CQ SQYD 1720 $ $
2003 30315 Roadway Reconditioning, Compaction Method (b) CQ MI 0.27 $ $
TOTAL OPTION ITEM B $
TOTAL QUOTED FOR ALL ITEMS
*Designated Method of Measurement: AQ = Actual Quantity, CQ = Contract Quantity, LSQ = Lump Sum Quantity.
**Unit: LS = Lump Sum, MI = Mile, SQYD = Square Yard, CY = Cubic Yard, FT = Foot, EA = Each.
Schedule Notes:
a) The Government intends to award one firm-fixed-price contract from this solicitation.
b) Contractors must submit pricing for all items.
c) Costs for mobilization and moves between job locations will be considered incidental to the work.
Therefore, Contractors must consider this expense when submitting their offer. Meaning, any incidental costs should be included under the mobilization subitem.