1240LU24Q0042-0001 SF30 Amendment.pdf

PDF 89 KB Posted

Attached to
Middle Fork Wild and Scenic River Access Site Deferred Maintenance Federal contract opportunity
Solicitation number
1240LU24Q0042
Issued by
Department of Agriculture Forest Service

About this file

This document is a Standard Form 30 Amendment to Solicitation 1240LU24Q0042 for Middle Fork Wild and Scenic River Access Site Deferred Maintenance. The amendment revises Section C.1 SCOPE OF CONTRACT to include additional details on the required work, such as sign installation, road clearing, reconditioning, culvert removal and installation, parking curb removal and installation, aggregate surfacing, and re-establishing driving surfaces. Line item 0008 on the Schedule of Items has also been revised, and contractors must submit pricing on the updated Attachment 1. The closing date for quotes remains July 31, 2024, 5:00 PM EST. The period of performance is August 15, 2024 to October 30, 2024.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LU24Q0042

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40LU

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 9

GAOA07/10/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/10/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

UEI: Not Available

The purpose of amendment 0001 to solicitation 1240LU24Q002 is as follows:

1. To change Section C.1 SCOPE OF CONTRACT, to read as follows:

The project consists of sign installation, road clearing, reconditioning, culvert removal and installation, parking curb removal and installation, aggregate surfacing, and re-establishing driving surfaces. This includes watering, mixing, blading, shaping, and compaction of processed material into a smooth non-segregated road surface. This work will also include use of a MAGNESIUM OR Calcium chloride flake binding agent, to retain fine particles within the roadbed. Sections of roadway identified in the plans that require

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

WESLEY R. DUDLEY

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240LU24Q0042/0001

roadway reconditioning shall be fully reconditioned to include, ditch, shoulders, culvert inlets/outlets, scarification, shaping, watering, and compacting in accordance with applicable specifications.

2. To revise line item 0008 on the Schedule of

Items (SOI). Contractors must submit their pricing on Attachment 1 - Revised SOI dated

7/22/2024.

The closing date remains unchanged. All quotes must be emailed to brenda.simmons@usda.gov on or before July 31, 2024, 5:00 PM EST. Late quotes may not be accepted.

Period of Performance: 08/15/2024 to 10/30/2024