1240LU24Q0004 Attachment 2 SOW Warm Spring Well Upgrade BNF.pdf

PDF 189 KB Posted

Attached to
GAOA Warm Springs Recreation Water System Bitteroot NF
Solicitation number
1240LU24Q0004
Issued by

About this file

This document includes a statement of work for a federal contract to upgrade the water system at the Warm Springs Campground in Montana's Bitterroot National Forest. The project involves decommissioning an existing well and pump house, installing a UV disinfection system, and connecting a new well to the campground water lines. Work will include trenching, installing water and plumbing lines, demolishing concrete structures, and all other tasks necessary to complete the upgrades according to the provided plans and specifications. The contract is estimated to cost between $25,000 and $100,000 and will be carried out between May 1, 2024 and October 31, 2024. The solicitation was issued by the US Department of Agriculture Forest Service under solicitation number 1240LU24Q0004.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WARM SPRINGS DISINFECTION SYSTEM

WARM SPRINGS CAMPGROUND

DARBY / SULA RANGER DISTRICT

RAVALLI COUNTY, MT

Section C - Description and Specifications

C-1 - PROJECT DESCRIPTION AND LOCATION

(a) Description of Work.

This project is for the decommissioning of an existing well in the pump house, the installation of a UV disinfection system, the installation of water lines and pitless adapter to connect an existing well to the Warm Springs Campground Water System.

Work at the project site includes, but is not limited to, trenching, installing water lines, installing a pitless adapter to an existing well, decommissioning a well, destroying a concrete pad, installing plumbing, installing a UV disinfection system, and all other incidental items necessary to complete the project in accordance with the plans and specifications.

(b) Project Location. To reach the projects from Darby, MT:

Warm Springs: Drive South on US 93 approximately 14.9 miles, Turn right onto Medicine Springs Rd. Drive 1.4 miles and campground will be on the left.

The project is located on the Darby/Sula District in Section 14, Township 1 North, Range 20 West.

(c) Price Range. between $25,000 to $100,000.

(d) Pre-Bid Tour. Pre-Bid tour to be coordinated with the COR.

(e) Pre-Bid Conference. None.

(f) Start Work. It is estimated that work will begin on or about May 1, 2024.

(g) Period of Performance. May 1, 2024-10/31/2024

C-2 - GOVERNMENT - FURNISHED PROPERTY.

-None

C-3 - STANDARD SPECIFICATIONS

"Montana Public Works Standard Specifications” (MPWSS) are included in this solicitation by reference only. The requirements contained in these specifications are hereby made part of this solicitation and any resultant contract.

C-4 - SPECIAL PROJECT SPECIFICATIONS

The following Special Project Specifications are applicable to this contract and are physically included in this section:

TABLE OF CONTENTS

SECTION TITLE

DIVISION 1: GENERAL REQUIREMENTS

01010 SUMMARY OF WORK

01040 COORDINATION AND SITE CONDITIONS

01050 CONSTRUCTION STAKING

01150 MEASUREMENT AND PAYMENT

01300 SUBMITTALS

01400 QUALITY CONTROL AND QUALITY ASSURANCE

01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

01560 ENVIRONMENT QUALITY CONTROL

01570 TRAFFIC CONTROL

01600 PRODUCT SHIPMENT, HANDLING, PROTECTION, AND STORAGE

01700 CONTRACT CLOSEOUT

01720 RECORD DRAWINGS

DIVISION 2: SITE WORK

02015 MOVE IN AND SITE PREPARATION

02020 DEMOLITION AND SALVAGE

02030 CLEARING AND GRUBBING

02221 TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT

STRUCTURES

02235 CRUSHED BASE COURSE

02480 FINISH GRADING AND SEEDING

02665 WATER DISTRIBUTION SYSTEM

DIVISION 16: ELECTRICAL

16010 BASIC ELECTRICAL REQUIREMENTS

16028 CODES AND STANDARDS

16100 ELECTRICAL SYSTEM

16900 CATALOG SHEETS

C-5 - DRAWINGS

The following drawings are a part of this solicitation and any resulting contract:

Warm Springs Well Upgrade

G-1 Title

C-1 Existing Site Conditions

C-2 Demolition Plan

C-3 Site Plan

S-1 Pumphouse Plan

S-2 Pump House Plumbing Detail

D-1 Details

F-2 - COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

(FAR 52.212-3) APR 1984)

The Contractor shall be required to:

(a) commence work under this contract within 10 calendar days after the Contractor receives the Notice to Proceed;

(b) prosecute the work diligently and complete the entire work ready for use not later than October 31st, 2024.

The time stated for completion shall include final cleanup of the premises.

Section C - Description and Specifications