This document contains schedules of items for water system improvement projects at four Lolo National Forest recreation sites. The schedules include line items for various construction and installation tasks with unit quantities and cost estimates. Key tasks involve replacing water distribution lines and hydrants at Bend, Seeley, Lee Creek, and Grizzly campgrounds. The projects will be awarded under solicitation number 1240LU24B0002 issued by the USDA Forest Service. Questions regarding this opportunity are due by February 29, 2024 and should be directed to paula.sales@usda.gov. The schedules provide cost estimates for base scope work as well as optional additional tasks that may be awarded separately depending on available funding. Construction is to follow standard methods of measurement and contingencies are included.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA Lolo Recreation Site Water System Replacements, newest first.
File Type Posted
Abstract_signed.pdf PDF
1240LU24B0002 Amendment 4.pdf PDF
Attachment 2 Updated 2024-03-08 REVISED Grizzly Campground Water System Plans.pdf PDF
Attachment 7 Updated 2023-03-08 REVISED LeeCreekCampground_Plans.pdf PDF
1240LU24B0002 Amendment 2.pdf PDF
1240LU24B0002 Amendment 3.pdf PDF
1240LU24B0002 1442.pdf PDF
Updated Attachment 2 Grizzly Campground Water System Plans - Signed.pdf PDF
Updated Attachment 8 Bend GS Plans- Signed.pdf PDF
1 March 24 Questions and Answers.pdf PDF
Updated ATtachment 7 Lee Creek CG Plans - Signed.pdf PDF
Updated Attachment 9 Seeley Lake Water System Plans - Signed.pdf PDF
1240LU24B0002 Amendment 2.pdf PDF
Updated Attachment 1 Schedule of Items - Revised 20 Feb 24.xlsx XLSX spreadsheet
1240LU24B0002 Amendment 1.pdf PDF
14 Feb 24 Questions and Answers.pdf PDF
Attachment 1 Schedule of Items.xlsx XLSX spreadsheet
Attachment 2 2023-11 Grizzly Campground Water System Plans - forSignature.pdf PDF
Attachment 6 2024-01-16 Grizzly Campground Specifications.pdf PDF
Attachment 4 2024-01-16 Bend Guard Station Specifications.pdf PDF
Attachment 3 2024-01-16 Seeley Campground Specifications.pdf PDF
Attachment 11 Wage Determination Sanders County.pdf PDF
1240LU24B0002.pdf PDF
Attachment 5 2024-01-16 Lee Creek Campground Specifications.pdf PDF
Attachment 8 Bend Guard Station Water System Improvements Plans.pdf PDF
Attachment 10 Wage Determination Missoula County.pdf PDF
Attachment 7 20240111 Lee Creek Campground Plans.pdf PDF
Attachment 9 Seeley Campground Plans.pdf PDF
Attachment 1 Schedule of Items.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bend SOI

BEND GUARD STATION WATER SYSTEM IMPROVEMENTS
LOLO NATIONAL FOREST
PLAINS-THOMPSON FALLS RANGER DISTRICT
SANDERS COUNTY, MONTANA

BEND WATER SYSTEM IMPROVEMENT PROJECT

SCHEDULE B
BASE BID ITEMDESCRIPTIONMETHOD OF MEASUREMENTUNITQUANTITYCOST PER UNITITEM COSTCOST PER UNITITEM COST
GENERAL
101GENERAL CONDITIONS, MOBILIZATIONLSQLS1$ 5,100.00$ 5,100.00
102WATER SYSTEM DEMOLITIONLSQLS1$ 2,500.00$ 2,500.00
Total
SUB TOTAL$ 7,600.00
WATER SYSTEM
2011-INCH IPS DR 11 HDPE WATER LINE **CQLF75$ 50.00$ 3,750.00
2022-INCH IPS DR 11 HDPE WATER LINE **CQLF305$ 55.00$ 16,775.00
203SANITARY FROST FREE HYDRANTAQEA1$ 1,500.00$ 1,500.00
204FLUSHING HYDRANTAQEA1$ 4,000.00$ 4,000.00
2051-INCH HDPE POLY BALL VALVE AND BOXAQEA1$ 1,250.00$ 1,250.00
2062-INCH HDPE POLY BALL VALVE AND BOXAQEA2$ 1,500.00$ 3,000.00
207CONNECT TO EXISTING WELLLSQEA1$ 350.00$ 350.00
208REMOVE AND REPLACE EXISTING WELL PRESSURE TANKS, AND WATER CONTROL ROOM APPURTENANCESLSQEA1$ 5,500.00$ 5,500.00
2092-INCH ELECTRICAL CONDUIT AND CONTROL WIRESCQLF285$ 15.00$ 4,275.00
TotalSUB TOTAL$ 40,400.00
Total All Items
*Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more.
TOTAL$ 48,000.00
15% Contingency$ 7,200.00
Total$ 55,200.00

Seeley SOI

LOLO NATIONAL FOREST
SEELEY CAMPGROUND SEELEY LAKE RANGER DISTRICT
MISSOULA COUNTY, MONTANA

WATER SYSTEM IMPROVEMENT PROJECT

SCHEDULE B
BASE BID ITEMDESCRIPTIONUNITQUANTITYCOST PER UNITITEM COSTCOST PER UNITITEM COST
WATER SYSTEM
1MOBILIZATIONLS1$ - 0
22-INCH HDPE C901 WATER LINELF1,200$ - 0
3WATER JUNCTIONSEA2$ - 0
4CONNECT TO EXISTING WATER MAINEA1$ - 0
5REPLACE WATER SERVICE CONNECTIONS TO EXISTING SPIGOTSEA3$ - 0
6PAVEMENT AND REMOVAL AND REPLACEMENTSY10$ - 0
TotalSUB TOTAL$ - 0
*Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more.15% Contingency$ - 0

TOTAL $ - 0

Lee Creek SOI

LEE CREEK CAMPGROUND WATER SYSTEM IMPROVEMENTS
LOLO NATIONAL FOREST
MISSOULA RANGER DISTRICT
RAVALLI COUNTY, MONTANA

WATER SYSTEM IMPROVEMENT PROJECT

SCHEDULE
BASE BID ITEMDESCRIPTIONMETHOD OF MEASUREMENTUNITQUANTITYCOST PER UNITITEM COSTCOST PER UNITITEM COST
GENERAL
101MobilizationLSQLS1$ 14,800.00$ 14,800.00
102Construction StakingLSQLS1$ 2,500.00$ 2,500.00
103Erosion and Sediment ControlLSQLS1
104Traffic ControlLSQLS1
105Clearing and GrubbingLSQLS1
106Landscape Surface RestorationLSQLS1
107Asphalt Surface RestorationLSQLS1
108Demolish Existing Reservoir and ReseedLSQLS1SUB TOTAL$ 17,300.00
WATER SYSTEM
2011" IPS SDR 9 HDPE Water LineAQLF264$ 60.00$ 15,840.00
2021.5" IPS SDR 9 HDPE Water LineAQLF1,102$ 45.00$ 49,590.00
203Waterline HDPE TeeAQEA2$ 2,500.00$ 5,000.00
2041" HDPE Poly ball vale, drain and boxAQEA5$ 1,000.00$ 5,000.00
205Air Relief ValveAQEA1$ 10,000.00$ 10,000.00
206Weld 18" extension to 6" dia. Well HeadLSQEA1$ 45,000.00$ 45,000.00
207Relocate Existing HydrantsAQEA3$ 10,000.00$ 30,000.00
208Demolish/dispose of extra HydrantsLSQEA1$ 25,000.00$ 25,000.00
209Host Site Water System ReplacementLSQEA1
Total Base Items
OPTION A: NEW PUMPHOUSE - REMOVED FROM CONSIDERATION 3/8/2024
301Demolish Existing PumphouseLSQEA1$ (20,000.00)$ (20,000.00)
302New Pumphouse Precast BuildingLSQEA1
303Electrical panel and re-wiringLSQEA1
304Connect to Existing WellLSQEA1
305Plumbing and AppurtenancesLSQEA1
Total Option 1SUB TOTAL$ 185,430.00
OPTION 1: PLUMB EXISTING PUMPHOUSE
301Plumbing and AppurtenancesLSQEA1
Total Option 1
OPTION 2: HYDRANT 6
4011" IPS SDR 9 HDPE Water LineAQLF141
402Waterline HDPE TeeAQEA1
4031" HDPE Poly ball valve, drain and boxAQEA1
Total Option 2
Total Base Items + Option Items
Note: Designated Method of Measurement: DQ - Designated Quantities; AQ - Actual Quantities; LSQ - Lump Sum Quantities
*The Government shall have up to 90 days from the time of award to exercise Option Items at the same fixed price as initially bid.
** Options Pay Items may be awarded independently of each other, depending on availability of funds. NOTE: Bid prices will be evaluated on base plus all options items.
***Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more.
TOTAL$ 202,730.00
15% Contingency$ 30,409.50

Grizzly SOI

GRIZZLY CAMPGROUND WATER SYSTEM IMPROVEMENTS
LOLO NATIONAL FOREST
MISSOULA RANGER DISTRICT
GRANITE COUNTY, MONTANA

WATER SYSTEM IMPROVEMENT PROJECT

SCHEDULE
BID ITEMDESCRIPTIONMETHOD OF MEASUREMENTUNITQUANTITYCOST PER UNITITEM COSTCOST PER UNITITEM COST
OPTION 1G - WATER SYSTEM
101GENERAL CONDITIONS, MOBILIZATIONLSQLS1$ 9,100.00$ 9,100.00
102WATER SYSTEM DEMOLITION AND WELL PUMP SALVALVELSQLS1$ 2,500.00$ 2,500.00
2011-INCH IPS DR 9 HDPE WATER LINE (6FT COVER) **CQLF270$ 60.00$ 16,200.00
2021-INCH IPS DR 9 HDPE WATER LINE (2FT COVER) **CQLF40$ 45.00$ 1,800.00
203CAMP HYDRANT AND APPURTENANCESAQEA2$ 2,500.00$ 5,000.00
204WINTERIZATION DRAIN VAULTAQEA1$ 1,000.00$ 1,000.00
205EXISITNG WELL CONNECTION, SUBMERSIBLE WELL PUMP, WELL PUMP ELECTRICAL CONDUIT AND CONDUCTORSLSQLS1$ 10,000.00$ 10,000.00
206PRECAST CONCRETE WELL CONTROL BUILDINGLSQLS1$ 45,000.00$ 45,000.00
207WATER SYSTEM CONTROLS AND WELL HOUSE PIPINGLSQLS1$ 10,000.00$ 10,000.00
208WELL HOUSE ELECTRICALLSQLS1$ 25,000.00$ 25,000.00
Total Option 1G$
OPTION 2G
301EAST CAMP LOOP WATER SYSTEM (APPROX. 530 FT 1" DR-9 WATER SERIVCE LINE AND CAMP POST HYDRANT)LSQLS1$ (20,000.00)$ (20,000.00)
Total Option 2G$SUB TOTAL$ 114,000.00
Total Option 1G + Option 2G$
Note: Designated Method of Measurement: DQ - Designated Quantities; AQ - Actual Quantities; LSQ - Lump Sum Quantities
*The Government shall have up to 90 days from the time of award to exercise Option Items at the same fixed price as initially bid.
** Options Pay Items may be awarded independently of each other, depending on availability of funds. NOTE: Bid prices will be evaluated on base plus all options items.
***Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more.
TOTALERROR:#REF!
15% ContingencyERROR:#REF!