Updated Attachment 1 Schedule of Items - Revised 8 March 2024.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- GAOA Lolo Recreation Site Water System Replacements Federal contract opportunity
- Solicitation number
- 1240LU24B0002
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains schedules of items for water system improvement projects at four Lolo National Forest recreation sites. The schedules include line items for various construction and installation tasks with unit quantities and cost estimates. Key tasks involve replacing water distribution lines and hydrants at Bend, Seeley, Lee Creek, and Grizzly campgrounds. The projects will be awarded under solicitation number 1240LU24B0002 issued by the USDA Forest Service. Questions regarding this opportunity are due by February 29, 2024 and should be directed to paula.sales@usda.gov. The schedules provide cost estimates for base scope work as well as optional additional tasks that may be awarded separately depending on available funding. Construction is to follow standard methods of measurement and contingencies are included.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bend SOI
| BEND GUARD STATION WATER SYSTEM IMPROVEMENTS |
| LOLO NATIONAL FOREST |
| PLAINS-THOMPSON FALLS RANGER DISTRICT |
| SANDERS COUNTY, MONTANA |
BEND WATER SYSTEM IMPROVEMENT PROJECT
| SCHEDULE B | ||||||||
| BASE BID ITEM | DESCRIPTION | METHOD OF MEASUREMENT | UNIT | QUANTITY | COST PER UNIT | ITEM COST | COST PER UNIT | ITEM COST |
| GENERAL | ||||||||
| 101 | GENERAL CONDITIONS, MOBILIZATION | LSQ | LS | 1 | $ 5,100.00 | $ 5,100.00 | ||
| 102 | WATER SYSTEM DEMOLITION | LSQ | LS | 1 | $ 2,500.00 | $ 2,500.00 | ||
| Total | ||||||||
| SUB TOTAL | $ 7,600.00 | |||||||
| WATER SYSTEM | ||||||||
| 201 | 1-INCH IPS DR 11 HDPE WATER LINE ** | CQ | LF | 75 | $ 50.00 | $ 3,750.00 | ||
| 202 | 2-INCH IPS DR 11 HDPE WATER LINE ** | CQ | LF | 305 | $ 55.00 | $ 16,775.00 | ||
| 203 | SANITARY FROST FREE HYDRANT | AQ | EA | 1 | $ 1,500.00 | $ 1,500.00 | ||
| 204 | FLUSHING HYDRANT | AQ | EA | 1 | $ 4,000.00 | $ 4,000.00 | ||
| 205 | 1-INCH HDPE POLY BALL VALVE AND BOX | AQ | EA | 1 | $ 1,250.00 | $ 1,250.00 | ||
| 206 | 2-INCH HDPE POLY BALL VALVE AND BOX | AQ | EA | 2 | $ 1,500.00 | $ 3,000.00 | ||
| 207 | CONNECT TO EXISTING WELL | LSQ | EA | 1 | $ 350.00 | $ 350.00 | ||
| 208 | REMOVE AND REPLACE EXISTING WELL PRESSURE TANKS, AND WATER CONTROL ROOM APPURTENANCES | LSQ | EA | 1 | $ 5,500.00 | $ 5,500.00 | ||
| 209 | 2-INCH ELECTRICAL CONDUIT AND CONTROL WIRES | CQ | LF | 285 | $ 15.00 | $ 4,275.00 | ||
| Total | SUB TOTAL | $ 40,400.00 |
| Total All Items | |||
| *Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more. | |||
| TOTAL | $ 48,000.00 | ||
| 15% Contingency | $ 7,200.00 | ||
| Total | $ 55,200.00 |
Seeley SOI
| LOLO NATIONAL FOREST |
| SEELEY CAMPGROUND SEELEY LAKE RANGER DISTRICT |
| MISSOULA COUNTY, MONTANA |
WATER SYSTEM IMPROVEMENT PROJECT
| SCHEDULE B | |||||||
| BASE BID ITEM | DESCRIPTION | UNIT | QUANTITY | COST PER UNIT | ITEM COST | COST PER UNIT | ITEM COST |
| WATER SYSTEM | |||||||
| 1 | MOBILIZATION | LS | 1 | $ - 0 | |||
| 2 | 2-INCH HDPE C901 WATER LINE | LF | 1,200 | $ - 0 | |||
| 3 | WATER JUNCTIONS | EA | 2 | $ - 0 | |||
| 4 | CONNECT TO EXISTING WATER MAIN | EA | 1 | $ - 0 | |||
| 5 | REPLACE WATER SERVICE CONNECTIONS TO EXISTING SPIGOTS | EA | 3 | $ - 0 | |||
| 6 | PAVEMENT AND REMOVAL AND REPLACEMENT | SY | 10 | $ - 0 | |||
| Total | SUB TOTAL | $ - 0 | |||||
| *Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more. | 15% Contingency | $ - 0 |
TOTAL $ - 0
Lee Creek SOI
| LEE CREEK CAMPGROUND WATER SYSTEM IMPROVEMENTS |
| LOLO NATIONAL FOREST |
| MISSOULA RANGER DISTRICT |
| RAVALLI COUNTY, MONTANA |
WATER SYSTEM IMPROVEMENT PROJECT
| SCHEDULE | ||||||||
| BASE BID ITEM | DESCRIPTION | METHOD OF MEASUREMENT | UNIT | QUANTITY | COST PER UNIT | ITEM COST | COST PER UNIT | ITEM COST |
| GENERAL | ||||||||
| 101 | Mobilization | LSQ | LS | 1 | $ 14,800.00 | $ 14,800.00 | ||
| 102 | Construction Staking | LSQ | LS | 1 | $ 2,500.00 | $ 2,500.00 | ||
| 103 | Erosion and Sediment Control | LSQ | LS | 1 | ||||
| 104 | Traffic Control | LSQ | LS | 1 | ||||
| 105 | Clearing and Grubbing | LSQ | LS | 1 | ||||
| 106 | Landscape Surface Restoration | LSQ | LS | 1 | ||||
| 107 | Asphalt Surface Restoration | LSQ | LS | 1 | ||||
| 108 | Demolish Existing Reservoir and Reseed | LSQ | LS | 1 | SUB TOTAL | $ 17,300.00 | ||
| WATER SYSTEM | ||||||||
| 201 | 1" IPS SDR 9 HDPE Water Line | AQ | LF | 264 | $ 60.00 | $ 15,840.00 | ||
| 202 | 1.5" IPS SDR 9 HDPE Water Line | AQ | LF | 1,102 | $ 45.00 | $ 49,590.00 | ||
| 203 | Waterline HDPE Tee | AQ | EA | 2 | $ 2,500.00 | $ 5,000.00 | ||
| 204 | 1" HDPE Poly ball vale, drain and box | AQ | EA | 5 | $ 1,000.00 | $ 5,000.00 | ||
| 205 | Air Relief Valve | AQ | EA | 1 | $ 10,000.00 | $ 10,000.00 | ||
| 206 | Weld 18" extension to 6" dia. Well Head | LSQ | EA | 1 | $ 45,000.00 | $ 45,000.00 | ||
| 207 | Relocate Existing Hydrants | AQ | EA | 3 | $ 10,000.00 | $ 30,000.00 | ||
| 208 | Demolish/dispose of extra Hydrants | LSQ | EA | 1 | $ 25,000.00 | $ 25,000.00 | ||
| 209 | Host Site Water System Replacement | LSQ | EA | 1 | ||||
| Total Base Items | ||||||||
| OPTION A: NEW PUMPHOUSE - REMOVED FROM CONSIDERATION 3/8/2024 | ||||||||
| 301 | Demolish Existing Pumphouse | LSQ | EA | 1 | $ (20,000.00) | $ (20,000.00) | ||
| 302 | New Pumphouse Precast Building | LSQ | EA | 1 | ||||
| 303 | Electrical panel and re-wiring | LSQ | EA | 1 | ||||
| 304 | Connect to Existing Well | LSQ | EA | 1 | ||||
| 305 | Plumbing and Appurtenances | LSQ | EA | 1 | ||||
| Total Option 1 | SUB TOTAL | $ 185,430.00 | ||||||
| OPTION 1: PLUMB EXISTING PUMPHOUSE | ||||||||
| 301 | Plumbing and Appurtenances | LSQ | EA | 1 | ||||
| Total Option 1 | ||||||||
| OPTION 2: HYDRANT 6 | ||||||||
| 401 | 1" IPS SDR 9 HDPE Water Line | AQ | LF | 141 | ||||
| 402 | Waterline HDPE Tee | AQ | EA | 1 | ||||
| 403 | 1" HDPE Poly ball valve, drain and box | AQ | EA | 1 | ||||
| Total Option 2 |
| Total Base Items + Option Items | |||
| Note: Designated Method of Measurement: DQ - Designated Quantities; AQ - Actual Quantities; LSQ - Lump Sum Quantities | |||
| *The Government shall have up to 90 days from the time of award to exercise Option Items at the same fixed price as initially bid. | |||
| ** Options Pay Items may be awarded independently of each other, depending on availability of funds. NOTE: Bid prices will be evaluated on base plus all options items. | |||
| ***Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more. | |||
| TOTAL | $ 202,730.00 | ||
| 15% Contingency | $ 30,409.50 |
Grizzly SOI
| GRIZZLY CAMPGROUND WATER SYSTEM IMPROVEMENTS |
| LOLO NATIONAL FOREST |
| MISSOULA RANGER DISTRICT |
| GRANITE COUNTY, MONTANA |
WATER SYSTEM IMPROVEMENT PROJECT
| SCHEDULE | ||||||||
| BID ITEM | DESCRIPTION | METHOD OF MEASUREMENT | UNIT | QUANTITY | COST PER UNIT | ITEM COST | COST PER UNIT | ITEM COST |
| OPTION 1G - WATER SYSTEM | ||||||||
| 101 | GENERAL CONDITIONS, MOBILIZATION | LSQ | LS | 1 | $ 9,100.00 | $ 9,100.00 | ||
| 102 | WATER SYSTEM DEMOLITION AND WELL PUMP SALVALVE | LSQ | LS | 1 | $ 2,500.00 | $ 2,500.00 | ||
| 201 | 1-INCH IPS DR 9 HDPE WATER LINE (6FT COVER) ** | CQ | LF | 270 | $ 60.00 | $ 16,200.00 | ||
| 202 | 1-INCH IPS DR 9 HDPE WATER LINE (2FT COVER) ** | CQ | LF | 40 | $ 45.00 | $ 1,800.00 | ||
| 203 | CAMP HYDRANT AND APPURTENANCES | AQ | EA | 2 | $ 2,500.00 | $ 5,000.00 | ||
| 204 | WINTERIZATION DRAIN VAULT | AQ | EA | 1 | $ 1,000.00 | $ 1,000.00 | ||
| 205 | EXISITNG WELL CONNECTION, SUBMERSIBLE WELL PUMP, WELL PUMP ELECTRICAL CONDUIT AND CONDUCTORS | LSQ | LS | 1 | $ 10,000.00 | $ 10,000.00 | ||
| 206 | PRECAST CONCRETE WELL CONTROL BUILDING | LSQ | LS | 1 | $ 45,000.00 | $ 45,000.00 | ||
| 207 | WATER SYSTEM CONTROLS AND WELL HOUSE PIPING | LSQ | LS | 1 | $ 10,000.00 | $ 10,000.00 | ||
| 208 | WELL HOUSE ELECTRICAL | LSQ | LS | 1 | $ 25,000.00 | $ 25,000.00 | ||
| Total Option 1G | $ | |||||||
| OPTION 2G | ||||||||
| 301 | EAST CAMP LOOP WATER SYSTEM (APPROX. 530 FT 1" DR-9 WATER SERIVCE LINE AND CAMP POST HYDRANT) | LSQ | LS | 1 | $ (20,000.00) | $ (20,000.00) | ||
| Total Option 2G | $ | SUB TOTAL | $ 114,000.00 |
| Total Option 1G + Option 2G | $ | |||
| Note: Designated Method of Measurement: DQ - Designated Quantities; AQ - Actual Quantities; LSQ - Lump Sum Quantities | ||||
| *The Government shall have up to 90 days from the time of award to exercise Option Items at the same fixed price as initially bid. | ||||
| ** Options Pay Items may be awarded independently of each other, depending on availability of funds. NOTE: Bid prices will be evaluated on base plus all options items. | ||||
| ***Note: All items detailed in the Schedule of Items above are actual quantities other than those denoted with a bold **. These items are contract quantities. Contract Quantities will be adjusted only when there are errors in the original design of 15% or more. | ||||
| TOTAL | ERROR:#REF! | |||
| 15% Contingency | ERROR:#REF! |